Loading...
Approval Letter - Henry Lot 9069COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor April 25, 2022 Michelle Henry P & M Development LLC 35001 NE 147th Avenue Yacolt, WA 98675 p.m.development@outlook.com Re: File #21-100016-00-UP; Approval Letter Henry Reasonable Use – Lot 9069, No Address Parcel Number 142103-9069 Dear Ms. Henry: The City of Federal Way has completed the administrative review of the proposed Reasonable Use Request pursuant to Federal Way Revised Code (FWRC) 19.145.090 for a new, single-family residence, driveway, and infiltration trench on parcel #142103-9069. There is an on-site wetland and two off-site streams. The wetland and stream buffers are 150 feet and 100 feet, respectively, and buffer impacts are unavoidable as the wetland buffer occupies the entire parcel. No construction is proposed within the wetland or streams. The total intrusion to the wetland is 3,170 square feet (sq. ft.), including a 1,563 sq. ft. building footprint for the residence. Since the stream buffer encumbers less area, the proposed site development will only intrude 1,060 sq. ft. into the stream buffer. There is an existing gravel road that extends across the subject property that has been determined to not provide any wetland buffer function, as a result is a permanently altered wetland buffer. The applicant will be allowed to improve the site with a paved driveway within the clearing and grading limits. The total impervious area will be calculated at the time of building permit since the roof area was not provided. The site access will be from SW 333rd Place to the south. Buffer enhancements are also proposed. The Process III application received January 8, 2021, with resubmittals received April 2, 2021, July 19, 2021, September 17, 2021, and November 2, 2021, the November 2, 2021, Wetland and Drainage Corridors Evaluation & Delineation Report & Conceptual Wetland Mitigation Plan Revision 3, prepared by Beaver Creek Environmental Services Inc., and the November 2, 2021, Final Mitigation Plan Rev 2, prepared by Beaver Creek Environmental Services Inc., the October 29, 2021 Technical Memorandum Stormwater Requirements, prepared by Michelle Henry, PM Development, LLC, and the September 2, 2021 Technical Information Report Surface Water Management, prepared by Michelle Henry, PM Development, LLC submitted for the following decisions: • “Reasonable use of the subject property” per FWRC 19.145.090 • “Building setbacks” per FWRC 19.145.160 • “Intrusion into stream buffers,” per FWRC 19.145.330 • “Development within wetland buffers” per FWRC 19.145.440 • “Permanently altered buffer” per FWRC 19.145.440(4) • “Buffer reduction with enhancement” per FWRC 19.145.440(6) are hereby approved with conditions, based on the enclosed Exhibit A, Findings for Project Approval, incorporated into this decision in full, and the following conclusions are based on those facts. COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor 1. The proposal is consistent with the comprehensive plan; 2. The proposal is consistent with all applicable provisions of Federal Way Revised Code (FWRC); 3. The proposal is consistent with the public health, safety, and welfare; 4. The streets and utilities in the area of the subject property are adequate to serve the anticipated demand from the proposal; 5. The proposed access to the subject property is at the optimal location and configuration; and 6. Traffic safety impacts for all modes of transportation, both on and off site, are adequately mitigated. The remainder of this letter outlines the land use review process required, conditions of approval, and outlines procedures relating to appeals and approval periods for this decision. This land use decision does not authorize initiation of construction activities. REVIEW PROCESS REQUIRED The site is within the residential Single-Family (RS 15) zoning district. Detached dwelling units are permitted in this zone subject to the provisions of FWRC 19.200.010. The site contains streams a wetland and their respective buffers, therefore, the site is subject to the provisions of FWRC 19.145 Environmentally Critical Areas. The applicant submitted the following critical areas reports per FWRC 19.145.080. o Wetland Report - Wetland and Drainage Corridors Evaluation & Delineation Report & Conceptual Wetland Mitigation Plan Revision 3, dated November 2, 2021, prepared by Beaver Creek Environmental Services Inc. o Final Mitigation Plan - Final Mitigation Plan Rev 2, dated November 2, 2021, prepared by Beaver Creek Environmental Services Inc. The following documents are not critical areas reports, however, they provide supplemental information as part of the analysis for the above-mentioned decisions. o Stormwater Narrative – Technical Memorandum Stormwater Requirements, revised October 29, 2021, prepared by Michelle Henry, PM Development, LLC o TIR – Technical Information Report Surface Water Management, dated September 2, 2021 prepared by Michelle Henry, PM Development, LLC The city forwarded these documents to the city’s wetland consultant, Landau, for peer review. Landau staff conducted a reconnaissance of the subject property on May 19, 2021, and agree with the delineated boundary of the wetland, Stream A and Stream B as detailed in a Technical Memorandum dated June 7, 2021. In this Technical Memorandum, Landau requested the applicant update and correct the wetland buffer from 165 ft. to 150 ft. and agreed with the 100 ft. stream buffers Landau found that the sample plot data forms provided in accordance with FWRC 19.145.410(2)(c) as part of the Wetland Report, included inaccurate information. Per a Landau Technical Memorandum dated December 9, 2021, clarification on field observations of wetland hydrology indicators for all sampling points are required and the following notes shall be addressed as a condition of approval: 1. The National Wetlands Inventory (NWI) classification in the header on all data forms should be noted as PFO1C or variation of none/not listed instead of PSSE. NWI mapping of the study area COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor provided on Figure 3 of the Wetland Report shows PFO1C wetland in portion of study area (scale of the figure is not appropriate for confirming classification of the sample plot locations in relation to the NWI mapped wetland). 2. All data forms (with exception of Sampling Point SP 1W) include one or all responses for field observations of surface water, water table, and saturation as “No” but with depths at 0 inches. Providing depth of 0 inches implies indicators occur at ground level in contradiction to “No” response and primary indicators responses. 3. Form for SP 1U vegetation section contains errors or omissions and requires clarification. Vegetation observed is not listed, whereas sapling/shrub cover is identified with 30% cover, notes indicate 100% bare ground, and dominance test worksheet notes 100% dominant species of OBL, FACW, or FAC species. 4. Form for Sampling Point SP 1W: i. The soil profile described does not satisfy the black histic or thick dark surface indicators selected. Landau’s Technical Memorandum dated May 19, 2021 field observations identified loamy mucky mineral soils in the vicinity of the sampling point. ii. Based on wetland hydrology indicators selected and field observations noted, the response to question regarding Wetland Hydrology Present? should be “Yes” instead of “No.” In order to allow development of a single-family home on the subject property, the Community Development Director or designee (“director”) must make a written decision on the following activities: (a) Buffer reduction with enhancement – The city will review and decide upon buffer reductions using process III in Chapter 19.65 FWRC, based on the criteria per FWRC 19.145.440(6)(a)-(f). Buffers may be reduced by up to 25 percent on a case-by-case basis if the project includes a buffer enhancement plan that clearly substantiates that an enhanced buffer will improve and provide additional protection of wetland functions and values per FWRC 19.145.440(6). (b) Stream Buffer Intrusion – The city will review and decide upon stream buffer intrusions using process III in Chapter 19.65 FWRC, pursuant to the review criteria contained in FWRC 19.145.330(3)(a)- (f) including a buffer enhancement plan to demonstrate that the remaining and enhanced buffer will function at an equivalent or higher level than the standard buffer. The enhancement plan shall address criteria provided in FWRC 19.145.330(2) (a)-(e). (c) Permanently altered buffer – The director may provide written approval for a wetland buffer reduction when existing conditions are such that portions of the required buffer exist in a permanently altered state (e.g., roadways, paved parking lots, and permanent structures) and do not provide any buffer function. The buffer may be reduced up to the area where the altered conditions exist per FWRC 19.145.440(4). (d) Building setbacks – Pursuant to FWRC 19.145.160 only landscaping, building overhangs, and fences and railings six feet or less in height are within the five-foot building setback from the edges of a critical area buffer(s). Structures such as single-family residences are not permitted within the building setback and must be set back a distance of five feet from the edges of a critical area buffer(s). For the activities proposed above which cannot meet the requirements and decisional criteria above and as a result would prevent the applicant from reasonable use of the property, the applicant can apply to waive or modify such provisions from Chapter 19.145 through a “Reasonable use of the subject property,” application reviewed under Use Process III, Project Approval per FWRC 19.145.090(2). The director incorporates in this COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor decision the written decision on the application based on the criteria listed under FWRC 19.145.090 and FWRC 19.65.100. (e) Reasonable use of the subject property – Implementation of the two code sections below would deprive an applicant of all reasonable use of the subject property and would qualify for a reasonable use exemption: I. Buffer reduction with enhancement – The implementation of FWRC 19.145.440(6) would prevent the applicant from developing a single-family residence. Pursuant to FWRC 19.145.440(6) buffers may be reduced by up to 25 percent on a case-by-case basis if the project includes a buffer enhancement plan that clearly substantiates that an enhanced buffer will improve and provide additional protection of wetland functions and values. A modification to FWRC 19.145.440(6) is necessary for reasonable use of the property to be developed with a reasonable sized house. The 25 percent maximum buffer reduction provision of FWRC 19.145.440(6) is waived and all other provisions still apply, specifically the approval criteria (a)-(f). II. Building setbacks - The implementation of FWRC 19.145.160 would prevent the applicant from developing a single-family residence on the subject property. Pursuant to FWRC 19.145.160 only landscaping, building overhangs, and fences and railings six feet or less in height are located within the five-foot building setback from the edges of a critical area buffer(s). Structures such as single-family residences and structures over 6 feet in height are not permitted within the building setback and will be set back a distance of fi ve feet from the edges of a critical area buffer(s). Considering the location of the wetland and streams on the subject property and the extent of their respective buffers and site access, there is no feasible location on the subject property for the proposed single-family residence to be located 5 feet from the edge of the critical area buffers. A waiver of this provision in its entity is required to approve the development of a single-family residence on the subject property. SEPA PROCESS The application is exempt from review under the State Environmental Policy Act (SEPA) as it does not exceed city adopted flexible thresholds set forth in FWRC 14.15.030(a) for construction of residential structures up to 20 dwelling units. No work is proposed within the wetland or offsite streams. Upon review of the submitted materials and the critical areas report peer review, it was been determined that SEPA was not required for the single-family proposal. CONDITIONS OF APPROVAL Based on the criteria above; recommendations provided by Landau; and the November 2, 2021, Wetland and Drainage Corridors Evaluation & Delineation Report & Conceptual Wetland Mitigation Plan Revision 3, prepared by Beaver Creek Environmental Services Inc., and the November 2, 2021, Final Mitigation Plan Rev 2, prepared by Beaver Creek Environmental Services Inc. the proposal and the decision on the following: “Reasonable use of the subject property” per FWRC 19.145.090, “Building setbacks” per FWRC 19.145.160, “Intrusion into stream buffers,” per FWRC 19.145.330, Development within wetland buffers” per FWRC 19.145.440, “Permanently altered buffer” per FWRC 19.145.440(4), and “Buffer reduction with enhancement” per FWRC 19.145.440(6), are approved with the following conditions: COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor 1) Prior to, and for the duration of, construction activity, the applicant must install temporary construction fencing containing silt screening fabric as proposed in the Final Mitigation Plan. 2) Prior to issuance of a building permit, the critical area buffer fence and split rail fence location shall be reflected on all applicable building permit plans. 3) Prior to issuance of a Certificate of Occupancy, the split rail fence and signage every 150 feet must be installed. A final inspection by the Planning Division is required to verify the split rail fence and signage is installed per the Final Mitigation Plan. Please contact Chaney Skadsen, Senior Planner, at 253-835-2644, to schedule the inspection. 4) Prior to issuance of a building permit, the applicant shall submit an updated Wetland Determination Data Forms correcting the responses for field observations of surface water, water table, and saturation as noted in Section 4. Critical Areas Reports of the Findings of Fact and the December 9, 2021 Technical Memorandum from Landau. 5) Prior to issuance of a building permit the applicant shall submit an updated Mitigation Plan that accurately labels the clearing and grading limits on the Stream Buffer and Wetland Buffer Map. 6) Prior to issuance of a Certificate of Occupancy, the applicant must record with King County Recorder’s Office, a restrictive covenant approved by the City. The covenant will state that no land surface modification may take place and no structure or improvement may be located in the wetland, streams, or respective buffers. 7) Prior to issuance of a Certificate of Occupancy, the applicant is required to improve the private access road as follows: a. Within the existing 15’ easement, a 10’ paved road with 2-2.5’ gravel shoulder on both sides, or 5’ gravel shoulder on one side; b. Provide a 25’ easement with 20’ paved road across the applicant’s adjacent properties to the east of the subject property (other two lots under their control) per Dwg. No. 3-2DD; c. Trim the overgrown shrubs along the easement to meet sight distance. 8) Prior to issuance of a Certificate of Occupancy, the applicant must provide fire sprinklers due to limited access and no approved turnaround. 9) Prior to issuance of a building permit, a series of financial guarantees shall be provided to ensure that the proposed wetland and buffer enhancement work is completed and is successful (performance and monitoring) for this lot. 10) Prior to issuance of a Certificate of Occupancy, the project biologist shall ensure that the species and sizes of native plants selected are utilized during initial planting and are shrubs common to the local area. These activities shall create a plant community that protects and enhances the functions and value of the on-site and off-site wetland, provides wildlife habitats, and protects local water quality. 11) All on-site activities shall be monitored by the project biologist or landscape architect. The project biologist shall observe and consult with construction crews during construction to ensure compliance with best management practices during the excavation of the buffer areas. Final plant placements shall be approved by the project biologist prior to installation. Following the COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor completion of on-site planting activities an Implementation Report shall be prepared and submitted to the city. The implementation report shall be provided to the city prior to issuance of a Certificate of Occupancy. 12) Upon the city’s acceptance of the implementation report, a five-year monitoring program shall be undertaken following the successful completion of the initial planting efforts to ensure the success of the Wetland and Buffer Establishment and Restoration Program buffer enhancement program. 13) Prior to issuance of a building permit, the proposed single-family residence footprint shall be verified to not exceed the approved 1,563 sq. ft. This cap includes all extrusions such as for decks, floor bump-outs, etc. BUILDING PERMIT ISSUANCE REQUIRED This Process III land use decision does not constitute building permit approval, or authorize clearing/grading activities. If you have any questions regarding building permit review contact the Permit Center at 253-835- 2607, or permitcenter@cityoffederalway.com. APPROVAL DURATION Per FWRC 19.15.100(2), “. . .the applicant must substantially complete construction for the development activity, use of land, or other actions approved and complete the applicable conditions listed in the use process III decision within five years after the final decision of the city on the matter, or the decision becomes void. If a land use petition is filed under Chapter 36.70C RCW in King County superior court, the time limits of this section are automatically extended by the length of time between the commencement and final termination of that litigation. If the development activity, use of land, or other action approved under this chapter includes phased construction, the time limits of this section may be extended in the decision on the application, to allow for completion of subsequent phases.” Time extensions to the decision may be requested prior to the lapse of approval following the provisions listed in FWRC 19.15.110. APPEALS Per FWRC 19.05.360, the effective date of issuance is three calendar days following the date of this letter, or April 28, 2022. Pursuant to FWRC 19.65.120(1), this land use decision may be appealed by the applicant, any person who submitted written comments or information, any person who has specifically requested a copy of the decision, or the city. In compliance with FWRC 19.65.120(2), a written notice of appeal must be delivered to the department within 14 calendar days after issuance of the decision, or March 12, 2022. The appeal must be accompanied by cash or a check, payable to the City of Federal Way, in the amount of the fee as established by the city. The notice of appeal must contain: a statement identifying the decision being appealed, along with a copy of the decision; a statement of the alleged errors in the director’s decision, including identification of specific factual findings and conclusions of the director disputed by the person filing the appeal; and the appellant’s name, address, telephone number and fax number, and any other information to facilitate communications with the appellant. Appeals are governed by process IV (Federal Way Hearing Examiner). PROPERTY TAX VALUATION Per FWRC 19.65.100(4)(i), affected property owners may request a change in valuation for property tax purposes, notwithstanding any program of revaluation. COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor CLOSING This decision does not constitute building permit approval, and it does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. If you have any questions regarding this decision, please contact Senior Planner Chaney Skadsen at 253-835-2644, or chaney.skadsen@cityoffederalway.com. Sincerely, Keith Niven, AICP, CEcD Planning Manager enc: Exhibit A, Findings for Project Approval Approved Site Plan April 2, 2021, Written Response to Public Comments June 7, 2021, Technical Memorandum Letter Landau October 22, 2021, Technical Memorandum from Landau December 9, 2021 Technical Memorandum from Landau c: Chaney Skadsen, Senior Planner Kevin Peterson, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer Brian Asbury, Lakehaven Water & Sewer District Sean Nichols, South King Fire & Rescue Miles Hall, 33325 43rd Ave SW Federal Way, WA 98023, milesoroad@gmail.com Midori Tanouye, 33037 47th Ave SW Federal Way, WA 98023, midoritanouye@gmail.com Lynda Myra, 33409 43rd Ave SW Federal Way, WA 98023, riversinc2@gmail.com Nathon Allen, 4412 SW 335th St. Federal Way, WA 98023, houseofnateall@gmail.com Michael Sullivan, 33202 47th Ave SW Federal Way, WA 98023, mikejsull@comcast.net