Loading...
20-103019 - Project Narrative 08-05-2020 11321-B N E 1 2 0 th S tr e e t | K i r kl a n d , WA 9 8 0 3 4 | ( 4 2 5 ) 285-2390 1 0 1 S o u t h W e n a t c h e e Av e . , S u i t e C 3 | W e n a t ch e e , W A 9 8 8 0 1 | ( 5 0 9) 293-7731 w w w . c p h c o n s u l t a n t s . c o m Site Planning Civil Engineering Landscape Architecture Land Use Consulting Project Management July 27, 2020 City of Federal Way Community Development Department 33325 8th Avenue South Federal Way, WA 98003-2609 Re: WoodSpring Suites Federal Way, CPH Nos. 0128-15-001.016 Preapplication Project Narrative City Review Staff, The WoodSpring Suites Federal Way hotel project proposes to build a 123-key hotel along with a building pad and services for an approximately 3,600 square-foot future general retail building on a single, approximately 2.65-acre real parcel located within the City of Federal, Washington (King County tax parcel no. 292104-9039). The site is generally square with some irregularities along the north and east boundaries. It is located at the southwest corner of the intersection of SR99 (Pacific Highway South) and South 356th Street. The site has a zoning designation of Commercial Enterprise (CE) General and the proposed hotel and general retail uses are permitted in the CE zone. The project would complete the binding site plan process subsequent to the site development and building permits to subdivide the site into two real parcels to separate the hotel and retail uses and facilities and to define shared parking areas and other common benefits. EXISTING SITE CONDITIONS The site is currently vacant and forested. Its topography slopes moderately from a knoll near the north- central portion of the site with the majority of the slope tending south and east. The lowest elevation of the site occurs in the very southeast corner of the property. The site is fronted on the north by South 356th Street and the east by SR99 which are both improved with wide concrete sidewalks, vertical curb and gutter, and some landscape amenities. The property immediately west of the site is zoned Suburban Estate (SE), which is a single- family designation, and is full developed for a church use including an expansive parking lot. Two properties zoned Office Park (OP), a commercial designation, are immediately adjacent to the site’s south boundary. STORM DRAINAGE Grading efforts on the site are expected to involve onsite cut-to-fill efforts to “level” the property by raising elevations at the south and east boundaries and lowering grade in the north, central and portions of the west boundary. Storm drainage improvements will be provided for the project in accordance with current City surface water standards. This will include flow control and water quality treatment via onsite facilities that are currently anticipated to be below-grade vaults. The treated and controlled release of storm water will be discharged to the recently installed roadway drainage system in SR99 in the vicinity of the southeast corner of the site. This concept is illustrated on the enclosed Figure 2, Conceptual Grading and Storm Drainage Plan. CRITICAL AREAS Our team has reviewed the latest City maps available online and the King County IMap website to identify potential critical areas on the site. No critical areas are expected to exist on or in the vicinity of the site based on the review of these data resources. WoodSpring Suites Federal Way July 27, 2020 Preapplication Project narrative Page 2 of 2 CPH Project No. 0128-15-001.016 SITE ACCESS Access to the site is proposed by two new commercial driveway approaches at the existing public roadway frontages at South 356th Street and SR99. Storm drainage treatment and discharge controls will require onsite facilities in accordance with City engineering and surface water standards. WATER AND SANITARY SEWER Public water and sanitary sewer facilities exist in the vicinity of the site. Extension of these systems will be required to service the site. These facilities are and/or will be owned, operated, and maintained by Lakehaven Utility District (LUD). An existing 8-inch sewer main flows east in a 10-foot easement over the south portion of the site. This public main will be extended to serve the new commercial uses on the site. Both an 8-inch water main and 8-inch sewer main are in an easement on the adjacent property to the west. Domestic water and fire supply for the site will be provided by new extensions from this 8-inch main. The enclosed Figure 3 provides the current concept for the proposed water and sanitary sewer improvements for the site. APPLICANT QUESTIONS The following are a few questions that are team has developed so far during our feasibility and early design efforts that we would appreciate your response to: 1. What is the classification of the stream identified on the east side of SR99 on the City’s 2016 Critical Areas Map? Does this stream still exist? 2. It is our understanding that the building must step 2’-0”+ every 60 feet of the façade. Will this building be subject to any additional design review requirements? 3. The proposed hotel building is more than 100 feet from the residential-abutting property line. The building is currently designed to be under 40-foot maximum. Are there any additional height restrictions for this project? 4. Is the Design Review process part of the building permit review or is it a separate process? 5. Are all civil/site improvements permitted through the Land Surface Modification (LSM) permit process? 6. Can the LSM and building permit applications be submitted for review while the land use reviews are still in process? I appreciate your time and assistance with this project, and I look forward to your formal response to our pre-application submittal. Thank you. Sincerely, CPH Consultants Matthew J. Hough, PE President Enclosures: Master Land Use Application Vicinity Map, 8.5x11 Figure 1 – Conceptual Site Plan Figure 2 – Conceptual Grading and Storm Drainage Plan Figure 3 – Conceptual Water and Sanitary Sewer Plan