Loading...
21-100434-PC-Preapplication Request Letter-02-03-2021-V1 February 3, 2021 Job No. 1316-003-020 Ms. Stacey Welsh Planning Manager Department of Community Development City of Federal Way 33325 8th Avenue S Federal Way, WA 98003 RE: Request for Pre-Application Conference Twin Lakes Cluster Subdivision Dear Ms. Welsh: On behalf of Prospect Development, LLC, ESM Consulting Engineers, LLC is submitting this letter and accompanying information as our request for a Pre-Application Conference with the City of Federal Way for a 30-unit cluster subdivision. The subject site is located just east of the WSDOT Twin Lakes Park-n-Ride, northeast of the intersection of SW 344 th Street and 18th Avenue SW. The site consists of King County tax parcel 242103-9008 totaling approximately 7.56 acres of vacant property. The project site has gone through a previous Pre-Application Conference (19-102629-PC) with a different applicant than this request. No new development on the project site or in its immediate vicinity is known to occur since that time. The following is a general project narrative describing the proposed project concept as well as questions in bold italics related to the various design elements: Zoning The subject site is zoned RS7.2. The proposed 30-lot layout is intended to meet all underlying zoning and lot dimension requirements, including lot coverage, building setbacks and impervious surface maximums for a Cluster Subdivision. Surrounding uses are as follows:  North: Single-Family Residential  South: Single-Family Residential  East: vacant Single-Family Residential  West: Transit parking Ms. Stacey Welsh February 3, 2021 Page 2 According to FWRC 18.55.040(2) (Cluster Subdivision), the following provisions are applicable for this proposed project and incorporated into the layout: a) Lots may be as small as 5,000 SF. o Each lot is at least 5,000 SF in size.  When new lots are abutting single-family lots, they shall be no less than the underlying zoning minimum lot size minus 10%, in this case no less than 6,480 SF (7,200 - 720 = 6,480). o Each lot that abuts the perimeter lots are at least 6,480 SF.  Open space must be provided onsite at a rate of 15% of the gross area, with 10% of the gross area as usable open space: o Approximately 49,425 SF (15%) of total open space is provided onsite. o Usable open space is provided in 3 locations onsite totaling approximately 32,950 SF (10%). The primary park will be located above the proposed private storm vault on the northwest corner of the site. Active open space is also available on the southern perimeter and the southeast corner of the site. Active recreational features within these spaces may be provided for use by the project residents.  FWRC 18.55.030(2) also explains the density requirements for a cluster subdivision, requiring the density be the same as what would be allowed with a conventional subdivision by subtracting the 15% for open space and 20% for streets from the gross land available, divided by the minimum lot size of the zone: o The gross site will be approximately 329,500 SF. o 329,500 - (15%+20%) = 115,325 / 7,200 = 30. Critical Areas and Tree Retention No critical areas are mapped or observed on the subject property as confirmed during review of adjacent “Pena Plat” to the south. Tree retention is proposed in the southwest corner the of project site alongside open space and where else feasible for the proposed development. Q: Does the City have any additional information related to critical areas in this location? Q: Please confirm that tree inventory may be conducted via representative sampling. Street Network and Frontage Improvements The proposed internal street network depicted creates a 19th Avenue SW connection thru to future SW 344th Street along with future road connection to the east. A cul-de-sac bulb is proposed on the western side of the new internal street that will extend no more than 150’ south for additional lot access. Ms. Stacey Welsh February 3, 2021 Page 3 Peak-hour traffic volumes generated by the proposed project are expected to exceed 20 trips. Q: Please confirm road connection to the east is, in fact, required. Q: Please confirm the ROW width requirements for the proposed street network including SW 344th Street. Please confirm the frontage improvement requirements for SW 344th Street. Q: Does the required traffic concurrency permit application address all necessary scope for traffic impact/safety analysis, or will a separate study be required? Q: Are there any known LOS or other traffic safety deficiencies pertinent to the project location? Utilities Water and sanitary sewer services provided by Lakehaven Water and Sewer District are assumed to be available in the adjacent right-of-ways to the property. It is anticipated that these existing water and sewer facilities will provide adequate capacity for development proposed on site. Q: Please comment on the probable connection points and any noted capacity or pressure concerns relative to serving the subject site. Stormwater The project proposes to locate an underground stormwater facility at the location depicted and discharge to the adjacent open conveyance flowing north toward SW 341st Street. Please see enclosed letter requesting approval of underground stormwater control and treatment. It is assumed that the existing WSDOT stormwater facility downstream is sized to provide bypass or future overflow conveyance from upstream properties. Alternatively, the Saghalie Firs project storm overflow conveyance may be used for conveyance following additional evaluation and sizing. Q: Are the downstream conveyances for the WSDOT and Saghalie Firs stormwater systems publicly owned and maintained? Does the City have the ability to authorize use and modification of either of these systems? Pre-Application Conference Submittal The following items are included in this submittal:  Project Narrative (this letter);  Underground Stormwater Request Letter;  Master Land Use Application;  Vicinity Map;  Conceptual Site Plan Drawing. Ms. Stacey Welsh February 3, 2021 Page 4 We understand that these materials constitute a complete submittal and ask that the City schedule Pre-Application Conference at your next available date. Please contact me upon your receipt and review of this information to confirm the date and time. Thank you for your attention to this project and we look forward to working with the City. Very truly yours, ESM CONSULTING ENGINEERS, L.L.C. JOHN EVERETT Planning Director Enc: As Noted cc: Justin Holland, Prospect Development, LLC \\esm8\engr\esm-jobs\1352\024\019\document\letter-003.docx