Loading...
21-102624_ Project Narrative_06-29-2021_V1DALEY-MORROW-POBLETE, INC. ENGINEERING -SURVEYING -LAND PLANNING 726 Auburn Way North Auburn, WA 98002 TEL: (253) 333-2200 FAX: (253) 333-2206 EMAIL: dmp@dmp-inc.us Project Narrative: The Applicants proposal is a Four phase commercial and senior residential development. Project includes Fast food, 50 units of senior living and a memory care unit composed of a grouping of several smaller buildings. The fourth parcel (lot 3) has not yet been determined. The site has grading challenges that need to be addressed. Applicant proposes to take primary access from Pac Hwy and secondary access from 16th Ave S. There is also an access easement to the south, through the adjoining commercial strip mall. The Applicant would prefer to develop the project in phases to spread the development costs out as the project grows. We assume a binding site plan may be the most appropriate method to segregate the property and phase the development elements. We are open to alternatives. The site plan and grading are conceptual and additional work is required. We have questions listed below. Questions: • Given the investments by the City on Pac Hwy, are any other improvements required? If so, what? • What improvements are required on 16th Ave SE ? We would prefer to complete frontage improvements adjacent to lot#4 (South property line to proposed S. 302"d St. Intersection) with Phase 1. The remaining frontage improvements would come with Phase 2 or 3. • We assume the easterly on -site frontage road will be required with Phase 1. (also associated drainage systems) The southern and eastern extensions of the internal road up to the S. 302nd St. Intersection would also be included in Phase 1. The remaining segments will be delayed to Phase 2 or 3 as needed. • Geotechnical analysis shows that infiltration is not an option on this site. Does the City accept the R-tank system for underground storm water storage? • Are there any limitations or special regulation for wall construction and grading on a site like this? • Given the existing grade, how is building height calculated? Several building may have 2 or 3 floors day lighting on the Pac Hwy Side and only 2 floors above grade on the 16th Ave Side (Residential zone adjacent) . From Pack Hwy, this would appear to be a 5 story building.