Loading...
21-104278_Conceptual Site Plan-10-12-2021-V1PROPOSED SUBDIVIDE LOT PARCEL B (15,000 sf) PROPOSED SUBDIVIDE LOT PARCEL A (15,000 sf) PROPOSED HOUSE FOOTPRINT PROPOSED HAMMER HEAD DRIVEWAY PROPOSED WIDENING OF EXISTING PRIVATE DRIVEWAY FROM 12' WIDE TO 16' WIDE TO ACCOMODATE (2) LOT ACCESS ROAD REQUIREMENT PER 3-02CC EXISTING 8" PVC SEWER LINE PROPOSED SEWER CONNECTION PROPOSED UNDERGROUND POWER TO NEW HOUSE PROPOSED UNDERGROUND WATER LINE PROPOSED UNDERGROUND GAS LINE 3,275 sf Footprint