Loading...
Jacksons Technical CommentsCOMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor June 14, 2021 Eric Maise GHD Services Inc. 9725 3rd Avenue NE, Suite 204 Seattle, WA 98115 eric.maise@ghd.com Re: File #21-101305-00-UP; TECHNICAL COMMENT LETTER Jacksons; 1520 South 348th Street, Federal Way Dear Eric Maise: City staff has conducted review of your April 13, 2021, submittal of documents as part of a Process I Master Land Use (MLU) application for the expansion of an existing remediation system, including installation of a concrete pad and cargo container at the above-mentioned address. City staff has provided the following comments that will need to be addressed prior to approval of your application, or as otherwise noted. 1. Update the site plan to clearly identify the modified storage container and new screening. 2. Note that fences and railings not over six feet in height may be located in required yards and that any improvement or structure that is not more than 18 inches above finished grade may extend not more than five feet into a required yard per FWRC 19.125.160. 3. Update the site plan to show any structures in the required yard setback. 4. Submit elevation drawings and design intent of the proposal as indicated on the submittal requirements for a Use Process I application: a. Statement of architectural design intent, finish materials, and colors. b. Front, rear, and side (labeled as north, south, east, and west) building elevations of proposed structures. c. Exterior wall openings. d. Exterior materials and colors board. e. Roof-top and ground based mechanical equipment screen details. f. Building height calculation. Eric Maise Page 2 of 2 June 14, 2021 21-101305-UP Doc ID 81333 APPLICATION STATUS The review period for the Use Process I will begin again within 14 days of a complete resubmittal of items requested/corrected. Please make the corrections and resubmit the requested materials with a completed “Resubmittal Information Form” (enclosed), and a letter indicating how the above comments have been addressed. All resubmittals are submitted through the permit portal at https://www.cityoffederalway.com/node/4588. Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified that such information is requested, the application shall be deemed void. The FWRC can be reviewed in its entirety at https://www.codepublishing.com/WA/FederalWay/. Please note, that as a result of redesigning and/or revising the preliminary plans, other city and agency comments and conditions may result in a request for additional or revised information. COVID-19 In an effort to take proactive measures to protect the health and safety of the Federal Way community, the Department of Community Development is implementing safety protocols and modifying our services. As a result, our doors will remain closed for in-person business. Staff will be able to serve customers electronically by email (permitcenter@cityoffederalway.com), or phone (253-835-2607). This practice is intended to help protect our citizens, customers, and staff from potential exposure to the virus. We thank you for your understanding in this matter. If you have any questions regarding this letter or your development project, please contact me at (253) 569- 1772 or chaney.skadsen@cityoffederalway.com. Sincerely, Chaney Skadsen Associate Planner enc: Bulletin #129, Resubmittal Information