Loading...
21-101305-Process I Checklist-04-06-2021-V1X X X X Bulletin #054 – January 17, 2019 Page 5 of 6 k:\Handouts\Process I or II Submittal Requirements Required Submitted   Clearing and Grading Plan  Identification of existing slope depicting: areas with 0% to 15% slope; areas with 15% to 40% slope; and areas of 40% or greater slope.  Proposed grades.  Location of all existing and/or proposed structures, driveways, right-of-way improvements, utilities, and easements on the subject property.  Designation of all wetlands, streams, and other critical areas that are on or within 300 feet of any area proposed to be disturbed by propos ed clearing and/or grading action.  Areas proposed for clearing and the proposed use for such areas.  Any proposed grade changes that adversely affect or endanger trees on the property and/or adjacent properties, and specifications to maintain them.  A minimum of two cross sections of the site, drawn to scale, depicting the existing and proposed grade and any proposed rockeries and/or retaining walls. The director may also require a three dimensional topographic model of existing and proposed topographic conditions.  Location and description of proposed erosion control devices and structures.  When required, a geotechnical report prepared by a geotechnical engineer that contains sufficient information to determine the potential impacts of the proposed clearing and grading, as well as proposed measures to reduce or eliminate these impacts.   Building Elevations/Design Intent  Statement of architectural design intent, finish materials, and colors.  Front, rear, and side (labeled as north, south, east, and west) building elevations of proposed structures.  Exterior wall openings.  Exterior materials and colors board.  Garbage/recycling facility screen details.  Roof-top and ground based mechanical equipment screen details.  Building height calculation.   Tree/Vegetation Retention Plan  Statement outlining purpose of any proposed tree removal (e.g., building construction, street or roadway, driveway, recreation area, patio, parking lot) together with a proposed timetable for when this work will occur.  A tree survey that identifies the location, approximate size, species, and number of trees on this site and also identifies the general location of trees within 50 feet of the site. Tree survey samples may only be used at the discretion of the director.  A depiction of the spatial limits for tree/vegetation retention areas and details of tree/ vegetation protection measures.  A depiction of any new vegetated areas to be established.  Manner in which the cleared areas on the property will be reclaimed with vegetation, specification of any required mitigation plantings, and a timetable for replanting.  Approved tree/vegetation retention plan shall be incorporated into the clearing and grading drawings for final construction documentation.  Tree unit calculation per FWRC 19.120.130(3). X x Checklist Prepare By BChapin 02/25/2021