Loading...
Sokalskyy North Technical Comments SignedCOMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor August 10, 2021 Ms. Nohely Moreno ESM Consulting Engineers 33400 8th Avenue South, Suite 205 Federal Way, WA 98003 nohely.moreno@esmcivil.com Re: File 21-102193-UP; TECHNICAL REVIEW COMMENTS Sokalskyy Reasonable Use North, 1300 South 359th Street, Federal Way Dear Ms. Moreno: City departments have the following comments in response to your June 10, 2021, submittal. Some comments provided herein are required and some are informative; others may be applicable during future steps of the project. Comments in this letter need to be addressed prior to issuance of a land use application decision, or as otherwise noted. Questions regarding technical review comments should be addressed to the referenced staff representative. The Federal Way Revised Code (FWRC) is available online at: http://www.codepublishing.com/WA/FederalWay/. Community Development – Planning Division Stacey Welsh, (253) 835-2634, stacey.welsh@cityoffederalway.com 1. Technical comments made about an item on one sheet, or in a document, may necessitate changes to other related sheets and documents. It is the applicant’s responsibility to determine any such necessary adjustments. Please ensure consistent information is communicated throughout the plan set and associated application materials. 2. Update the incorrect vicinity map in the plan set. 3. Please provide the proposed roof area information on the site plan. 4. Per FWRC 19.200.010 and the 19.05.160 definition of “property line,” a 20-foot setback applies along the southern lot line, as that is where the primary vehicular access is and this lot is not a flag lot. As a result, the eastern property line requires a five-foot setback. Adjust the site plan as needed to comply with the required setbacks. Ms. Nohely Moreno Page 2 of 3 August 10, 2021 21-102193-00-UP Doc. I.D. 81594 5. In accordance with FWRC 19.145.090(4), if the city grants a reasonable use request it shall grant the minimum necessary to provide the applicant with some reasonable use of the subject property; any waiver of requirements shall result in the minimum possible impacts to the function associated with proposed improvements on affected critical areas. Changes to the site layout and reduction of impervious improvements are possible. As a result of the code above, and in consideration of comment #4, the proposed home and driveway need to be moved further away from the on-site wetland; explore rotating the layout of the home and moving it further to the east. Elimination of any excess driveway should be pursued as well. Adhere to the requirements for driveways in FWRC 19.130.240(1). 6. In the wetland report, it shows a sign detail from King County; use the enclosed detail (3-56 NGPA sign). 7. The buffer enhancement plan needs to be revised to account for the revised location of the residence pursuant to comments #4-5 above. The wetland fencing should match the project clearing limits and not allow for extra yard area as shown on the plan in the northeast corner of the property. Also, see comment #5 above regarding reasonable use and the minimum allowance necessary. 8. No public comments were received during the Notice of Application public comment period that concluded on August 9, 2021. Public Works – Development Services Division Kevin Peterson, (253) 835-2734, kevin.peterson@cityoffederalway.com No comments; contact if you have any engineering or stormwater related questions. Public Works – Traffic Division Sarady Long, (253) 835-2743, sarady.long@cityoffederalway.com No comments; contact if you have any transportation or concurrency related questions. Lakehaven Water & Sewer District Brian Asbury, 253-946-5407, basbury@lakehaven.org The applicant will need to submit applications to Lakehaven for any necessary water and/or sewer service connections. SOUTH KING FIRE & RESCUE Sean Nichols, 253-946-7242, sean.nichols@southkingfire.org No comments; contact if you have any fire related questions. Ms. Nohely Moreno Page 3 of 3 August 10, 2021 21-102193-00-UP Doc. I.D. 81594 CLOSING Please be aware that this review does not preclude the city from requesting additional information related to any of the topics discussed above. Please submit by electronic submittal (Document Upload Link or https://www.cityoffederalway.com/node/4588) revised application materials as appropriate, a letter explaining how these comments have been addressed, and the completed “Resubmittal Information Form” (enclosed). Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified by mail that such information is requested, the application shall be deemed null and void and the city shall have no duty to process, review, or issue any decision with respect to such an application. Extension requests submitted 30 days prior to the lapse of the 180-day notification that meet the criteria listed in FWRC 19.15.050(2)(a-c) will be accepted. If you have any questions regarding this letter please contact me at stacey.welsh@cityoffederalway.com or 253 835-2634. Sincerely, Stacey Welsh, AICP Principal Planner enc.: NGPA Sign Detail Resubmittal Information Form c: Kevin Peterson, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer Brian Asbury, Lakehaven Water & Sewer District Sean Nichols, South King Fire & Rescue Pavlo Sokalskyy, wawusinc@yahoo.com