Sears Remodel Directors ApprovalCOMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Jim Ferrell, Mayor September 30, 2021 Ms. Christine Fong MCG Architecture 15653 Alton Parkway, Suite 100 Irvine, CA 92618 design@mcgarchitecture.com Re: File #21-103270-UP; PROCESS I “DIRECTOR’S APPROVAL” Sears Auto Center Remodel, 1701 South Commons, Federal Way Dear Ms. Fong: The Community Development Department has completed review of your Use Process I (UPI) Master Land Use application for a façade remodel with parking lot and landscaping modifications at the former Sears Auto Center at The Commons at Federal Way. The Process I application is hereby approved per the findings, conclusions, and conditions noted below. FINDINGS OF FACT 1. The applicant proposes a façade remodel with parking lot and landscaping modifications at the former Sears Auto Center. An exterior façade remodel and tenant improvements will be done to prepare for new retail sales, and general and specialty users; potentially including office use. Work includes modifying the south end of the existing two-story Sears store and auto center. A portion of the auto center will be demolished and the area under the second story overhang will be enclosed to create a lobby with stairs and elevators. The existing parking lot will be reconfigured. 2. The zoning for the property at 1701 South 320th Street (parcel 7622400015) is City Center Core (CC-C). Federal Way Revised Code (FWRC) 19.225.030, “Retail shopping center, regional.,” allows any permitted use as listed in the CC-C zone. As a result, based on the submitted materials, FWRC 19.15.025 is not applicable and a Zoning Compliance-Change of Use application is not required. 3. Per FWRC 19.15.030(1), minor improvements and modifications to a site that are exempt from SEPA shall be processed using Process I: “(1) Minor improvements, modifications and additions. Minor improvements, modifications and additions to a site such as parking lot and landscape area modifications and improvements, and/or additions to an existing developed site that are exempt from SEPA shall be processed using process I, provided the improvements and/or additions do not exceed either of the following thresholds: (a) Twenty-five percent of the gross floor area of the existing use; or (b) Two thousand square feet of new gross floor area.” Ms. Christine Fong Page 2 of 4 September 30, 2021 21-103270-00-UP Doc. I.D. 81743 4. Changes to parking, drive aisles, and parking lot landscaping are proposed. The existing stalls and landscape islands will be reconfigured within the same general area. There are 65 stalls and the changes will result in an increase to 86 stalls. 5. As part of the exterior site work, 21 parking lot landscaping trees will be removed. Replacement parking lot landscaping will be installed, along with new landscaping near the trash room and the pedestrian plaza. Per FWRC 19.125.070(2)(a)(i)(B), 22 square feet of landscaping per parking stall is required, and FWRC 19.125.070(3) specifies the minimum and maximum sizes for landscape islands. Accordingly, square footage proposed under 64 square feet or over 305 square feet cannot be factored into the total amount of the proposed parking lot landscaping. As a result, of the 4,368 square feet of parking lot landscaping noted on the submitted plan, only 2,327 square feet can be counted as meeting the code requirement. Nonetheless, 2,327 square feet of parking lot landscaping for 86 stalls exceeds the code requirement (2,327/86=27 square feet). 6. Several of the modified parking lot landscaping islands are shown without trees. Per FWRC 19.125.050(4)(b), one tree per landscape island up to 150 square feet shall be planted and one additional tree shall be planted for landscape islands up to 305 square feet. Trees will need to be added to the landscaping plan submitted with the building/site development permit; this shall be made a condition of approval. 7. The submitted landscape plan does not contain the professional certification of the preparer. Per FWRC 19.125.035(1)(a), the landscape plan submitted with the building/site development permit shall be prepared by a landscape architect licensed in the state of Washington, a nursery professional certified pursuant to the Washington Certified Nursery Professional program, or a Washington State certified landscape technician; this shall be made a condition of approval. 8. Per FWRC 19.115.030, applications for remodeling or expansion of existing developments shall meet only those provisions of the chapter that are determined by the director to be reasonably related and applicable to the area of expansion or remodeling. The proposal incorporates many design features listed in the guidelines, which are an improvement to the existing facades constructed prior to design guideline requirements. 9. Pedestrian connectivity to the south will be enhanced with a new connection from the building to an internal sidewalk that connects to South 324th Street. A pedestrian connection to the west will be installed and ready to connect to future on-site development if that development is designed accordingly. There is a commercial development project under review located to the west, The Commons Mall-Pad Sites (city file 20-104021-UP). A condition of approval shall require the pavement treatment described in FWRC 19.115.050(4)(b) for any revised/new pedestrian connections. 10. There are no known critical areas on-site. 11. Per FWRC 19.15.100(1), the applicant must substantially complete construction for the development activity, use of land, or other actions approved; and complete the applicable conditions listed in the process I decision within one year after the final decision of the city on the matter, or the decision becomes void. 12. According to the Building Division, a building permit for the exterior façade work is required. Engineering is required for the design and attachment of the new façade, including new window openings and metal canopies. A permit is required for the roof cover over the new trash room. An electrical permit is required for any new lighting. The new pedestrian walkway and seating in the public plaza will need to be accessible. 13. Public Works Development Services reviewed the submittal and has the following comment applicable at time of permitting: Provide sizing calculations for the new stormwater quality vault. This shall be made a condition of approval. Ms. Christine Fong Page 3 of 4 September 30, 2021 21-103270-00-UP Doc. I.D. 81743 14. The Public Works Traffic Division reviewed the submittal and had the following comments: a. Map III-4 in the Federal Way Comprehensive Plan depicted grid roads within the subject property. The applicant is not expected to construct these grid roads since the proposal does not meet the 25 percent threshold. Please note, these grid roads may be required to be constructed to city standards and dedicated as right-of-way or set aside as a tract “X” with a future development proposal. b. Currently, there is no pedestrian walkway from the building to SR 99 (Pacific Highway South). With the redevelopment, the project will likely generate pedestrian traffic and as such, pedestrian access/ walkway should be provided from Pacific Highway South to the building. (Planning Division note: see related Finding #9, above.) c. Traffic impact fees will be assessed and collected from the applicant at the building permit stage, using the fee schedule then in effect. Based on the current fee of $5.17 per square foot for shopping center land use, the estimated total traffic impact fee is approximately $77,810 (estimated fee without credit). According to King County Records, the prior development predates the city’s incorporation; therefore, in order to receive credit for the prior use, please submit proof of any mitigation fees paid for the development of the prior use. 15. Lakehaven Water & Sewer District, the water and sewer service purveyor for the site, reviewed the submittal and had the following comment: Lakehaven has no comments on the proposed façade remodel. The parking lot re- alignment/re-striping will require an existing hydrant and some existing water service connections/meters to be relocated, as preliminarily indicated on the applicant’s submitted utility plan, under a Lakehaven Facilities Installation Agreement. Lakehaven has previously communicated this to the applicant, but has not yet received the formal application for the FI Agreement work. 16. South King Fire & Rescue reviewed the submittal and had no comments. CONCLUSIONS OF LAW 1. The proposed improvements are not exempt from use process review as they do not meet criteria set forth in FWRC 19.15.020, “Exceptions.” 2. Process I “Director’s Decision” is the appropriate Master Land Use Application as minor improvements and modifications to an existing developed site are proposed that do not exceed thresholds set forth in FWRC 19.15.030(1). 3. The proposed improvements either comply with zoning regulations set forth in Use Zone Chart FWRC 19.225.030, including required yards, lot coverage, height, and parking; or are no more nonconforming than existing development. 4. The proposed improvements, as conditioned, meet Process I purpose criteria set forth in FWRC 19.55.020, including compliance with applicable provisions of FWRC Title 19, “Zoning and Development Code,” and health, safety, and welfare standards. Ms. Christine Fong Page 4 of 4 September 30, 2021 21-103270-00-UP Doc. I.D. 81743 CONDITIONS OF APPROVAL 1. The landscape plan submitted with the building/site development permit shall comply with FWRC 19.125.050(4)(b), except where pedestrian connections prevent viable planting. 2. The landscape plan submitted with the building/site development permit shall be prepared by a landscape architect licensed in the state of Washington, a nursery professional certified pursuant to the Washington Certified Nursery Professional program, or a Washington State certified landscape technician. 3. Pavement treatment in compliance with FWRC 19.115.050(4)(b) is required for any revised/new pedestrian connections and shall be in place prior to final building permit inspection. 4. At the time of permitting, provide sizing calculations for the new stormwater quality vault. APPEALS The effective date of this decision per FWRC 19.05.360 is October 4, 2021. Pursuant to FWRC 19.55.050, the applicant, any person who submitted written comments or information, any person who has specifically requested a copy of the decision, or the city may appeal this decision to the Federal Way Hearing Examiner by October 18, 2021. Any appeal must be in the form of a letter delivered to the Community Development Department with the established fee. The notice of appeal must contain a statement identifying the decision being appealed, along with a copy of the decision; a statement of the alleged errors in the director’s decision (including identification of specific factual findings and conclusions of the director disputed by the person filing the appeal); and the appellant’s name, street address, email address, telephone number, fax number, and any other information to facilitate communications with the appellant. CLOSING This land use decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. This Process I approval does not constitute approval of a building permit. If you have any questions regarding this decision, please contact Principal Planner Stacey Welsh at 253-835-2634, or stacey.welsh@cityoffederalway.com. Sincerely, Digitally Signed September 30, 2021, at 1:31 PM Brian Davis Community Development Director enc: Approved Site Plan, Elevations, Landscape Plan c: Stacey Welsh, Principal Planner Greg Kirk, Plans Examiner Sarady Long, Senior Transportation Planning Engineer Kevin Peterson, Senior Engineering Plans Reviewer Brian Asbury, Lakehaven Water & Sewer District Sean Nichols, South King Fire & Rescue MGP XI Commons FW LLC, 457 SW 148th Street, Suite 202, Burien, WA, 98166, ggoodman@merlonegeier.com Jamas Gwilliam jgwilliam@merlonegeier.com