Loading...
21-104018-UP-Comment Response-02-17-2022-V2studiodorsey 2022.02.16 – Watson’s Nursery Detached Restroom a r c h i t e c t u r e 1 February 16, 2022 Studio Dorsey Architecture 8706 92nd Street NW Gig Harbor, WA 98332 Contact: John Dorsey AIA Phone: (253) 686-4677 Email: john@studiodorsey.com Dear Chaney Skadsen, See the following comment responses below in blue. Sincerely, John Dorsey AIA Comment Response Letter – Revision 1 Re: File #21-104018-UP; Technical Comment Letter Watson’s Nursery Detached Restroom, 32108 39th Ave S, Federal Way Dear John Dorsey; The Community Development Department has received your October 5, 2021, Process I Master Land Use (MLU) application to construct a detached, a two-occupant restroom to serve an existing retail nursery. In order to further review the application and issue a written decision on the proposal, the following comments need to be addressed as applicable. Additional comments are provided for your information. COMMUNITY DEVELOPMENT – PLANNING DIVISION Chaney Skadsen, 253-569-1772, chaney.skadsen@cityoffederalway.com 1. Add one parking space to the site plan. The number of parking spaces provided onsite does not conform with the required parking for the existing use. The site plan appears to depict 30 parking spaces on the subject property. Pursuant to Federal Way Revised Code (FWRC) 19.215.010 one parking space is required per 300 square feet of gross floor area. The existing retail building is 11,466 square feet requiring 39 parking spaces (11,466/300= 38.22). Note that if the formula for determining the required number of parking spaces results in a fraction, it will be rounded up to the next higher whole number per FWRC 19.130.040. Pursuant to FWRC 19.30.180 no nonconformance may, in any way, be enlarged, expanded, increased, intensified, compounded or in any other way made greater. The proposed detached bathroom and storage has a gross floor area of 144 square feet requiring one parking stall. Therefore, in order to not expand the existing nonconformance an additional parking space is required. The parking count was updated by the Owner and determined to be 37 which is still short of the required 39 for just the existing facility. We have added one additional stall (for a total of 38) in response to your comment. studiodorsey 2022.02.16 – Watson’s Nursery Detached Restroom a r c h i t e c t u r e 2 PUBLIC WORKS – DEVELOPMENT SERVICES DIVISION Sam Basmeh, 253-835-2751, sam.basmeh@cityoffederalway.org 1. Proposed building and concrete slab amounts to a total of 220 square feet of impervious surface. Please provide total disturbed area for sewer and water work. Areas have been included for the proposed sewer connection and water disturbed area. There is now a total SF takeoff for total disturbed as well as total replaced impervious surfaces on the site plan. A proposed asphalt walkway has been added to the site plan. This asphalt walkway is a replacement for a portion of the existing gravel impervious surface area. The total impervious surface for the site has not changed. The site plan now includes information pertinent to a simplified drainage plan since we are replacing more that 2,000 SF of impervious surface. A walkway detail has been provided along with information regarding simplified drainage. LAKEHAVEN WATER AND SEWER DISTRICT Brian Asbury, 253-946-5407, BAsbury@lakehaven.org All Lakehaven Development Engineering related application forms, and associated standards information, can be accessed at Lakehaven’s Development Engineering web pages (http://www.lakehaven.org/204/Development-Engineering). 2. All comments herein are valid for one (1) year and are based on the proposal(s) submitted and Lakehaven’s current regulations and policies. Any change to either the development proposal(s) or Lakehaven’s regulations and policies may affect the above comments accordingly. 3. A Water and/or Sewer Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificates are valid for one (1) year from date of issuance. If Certificate(s) is needed, allow 1-2 work days to issue for typical processing. 2021 cost for a Water or Sewer Certificate of Availability is $40.00 (each). 4. The site has two (2) existing water service connections: a. SvcNo 11445, Residential, 5/8”x3/4” meter. b. SvcNo 25607, Non-Residential, 1” meter. 5. A water service connection application submitted separately to Lakehaven is required for each new service connection to the water distribution system (e.g., irrigation, etc.), in accordance with standards defined in Lakehaven’s current ‘Fees and Charges Resolution’. Non-single-family properties require separate domestic (per building, typically, some exceptions allowed), irrigation (if irrigated landscaped areas are incorporated into the site development &/or property has a sewer service connection), and fire protection (if required or installed) water service connections & meters. 6. To satisfy premise isolation requirements, the installation & satisfactory testing of an approved backflow prevention assembly (BPA) adjacent to each non-residential domestic & irrigation service meter is required pursuant to WAC 246-290-490 & Lakehaven standards regarding premise isolation. As low health cross-connection hazards, either a double check valve assembly (DCVA) or a reduced pressure backflow assembly (RPBA) is required. Contact Lakehaven’s Cross-Connection Control Program Manager (Chris Zoepfl, CZoepfl@Lakehaven.org, 253-946-5427) for additional information on premise isolation/BPA installation & testing coordination. studiodorsey 2022.02.16 – Watson’s Nursery Detached Restroom a r c h i t e c t u r e 3 7. Based on the proposal submitted, preliminary estimated Lakehaven water service connection fees/charges/deposits (2021 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. All Lakehaven fees, charges and deposits are typically reviewed & adjusted (if necessary) annually, and are subject to change without notice. a. Water Service/Meter Installation, New Non-Residential Domestic, 5/8”x3/4” preliminary size: $5,130.00 deposit. Actual size TBD by Lakehaven based on applicant’s estimated maximum domestic/commercial GPM usage rate. b. Water Service/Meter Installation, Convert Ex. 1” Non-Residential to Irrigation: $0.00. c. Capital Facilities Charge(s)-Water, 4,764.71 per Equivalent Residential Unit (ERU): $3,240.00 (based on 2020 total water usage on property of 4.02 ERU). Actual amount due TBD by Lakehaven based on applicant’s estimated annual total water usage rate. Water system capacity credits are available for this property from system capacity charges previously assessed, paid directly to Lakehaven, and/or credited to the property for 3.34 ERU. Please contact Lakehaven for further detail. d. ROW Permit Fee (City of Federal Way): $1,160.00. Please advise if any action is required for the approval of the Site Review or if this is for information only.