23-101331Electrical
City oFFederal Permit #:23-101331-00-EL
Community Development
Dept - � '�
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) B35-2609
Project Name: TANAKA
Project Address: 34114 28TH AVE SW Parcel Number: 010921 0490
Project Description: Panel Change / Luminaire Update or Addition (Kitchen)
Owner
Applicant
Contractor
SHIGEKI TANAKA
VANZELIA LLC
VANZELIA LLC
34114 28TH AVE SW
1128 SW SPOKANE ST
VANZEL*784MN(7/15/24)
FEDERAL WAY WA
SEATTLE WA 98134
1128 SW SPOKANE ST
98023-7603
SEATTLE WA 98134
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
~' Electrical Fixtures
Alt. Serv./Feeder: 0 to. 200 aml 1 Circuits - Residential 2
PERMIT EXPIRES Saturday, 9 September, 2023
Permit Issued on Monday, March 13, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0 1\1 I I Date:
..�.a
V'
_N�
CITY or
Federal Way
THIS CARD IS TO RE %L-IN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
By
Q
By
UFER Ground (4295)
Approved
Date
Pool Bonding (4195)
Approved
Date
Q
By
Q
By
Ditch cover (4030)
Approved
Date
Temporary Power (4275)
Approved
Date
Q
By
Q
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Set -vice (4235)
Approved
r�
Date
0
Feeders/Sub-panels (4045)
Q
Rough Electrical (4225)
Q
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0
F' al - Electrical (4055)
Approved
Date . "14
MECHANICAL
Mechanical Rough -in (4165)
0
Gas Piping (4125)
0
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
Plumbing Groundwork (4190)
Rough Plumbing (4230)
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date
q::%L Federal Way
ADDRESS:
e
Building Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
�� �✓� �� PERMIT#: � 10/331
IF YOU HAVE QUESTIONS CALL
(253) 835-
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
�f �Aej'14 e'�t�
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of