21-102333• r.
City of Federal W oy
Coon,n un ity Dc velopfnci1t Dept.
3332S 8th Ave S
Fe.lcrnl Way , WA 98003
Ph: (2 53) 835-2607 Fa x: {253) 835-2609
Project Nam e: GRIB
P roj ect Address : 31310 10TH PL SW
Building -Single Family
Permit #:21-1 02333-00-SF
Inspection Re que st Lin e: (253) 835-3050
Parce l Numbe r: 072104 9249
Proj e ct De s c ri pti on : BLUE BEAM -Con s truction of' a 4680 s quare fo ot , 2-s tory single family res idence with a 1175
s quare foot attached garage, a. 90 s quare foot co vered entry and 84 s quare foot deck. Includes
plumbing a nd mechanical. *** 4 Bedroom s ; $600,000 es timated s elling price***
Own er Applicant Contractor Lender
DJ NA GRJB DINAGRlB OWNER IS CONTRACTO R OWNER IS LEND ER
3592 7 30T H A V E S 3592 7 30TH A VE S
FEDERAL WA Y WA 9800 3 FEDERAL WAY WA 980-03
C ensus Category: 101 -N ew Sing le Family Hous e
In cludes: #l #2 #3 #4
Occupancy C lass: R-3
Co ns truction Ty pe: TypcV · B
O cc u pancy Load :
Flo or Area (s q . ft.) 4,680.00
Additional Permit Information
Ne w/ Atl diliona l S q . Feet . I st Floor ..................... 2276 New/ Ad ditional Sq. Fee l . 2nd Floor .................... 2404
New/ Addition a l Sq. Feet -3rd rtoor ..................... 0 Occupancy #1 • Area (Sq . Feet) .............................. 468 0
New / Add itio nal Sq. f eet. Basement.. ................. 0 Basic l'lan?........................................................... N o
Occupancy # l • Cons truction Ty p e ......................... T y pe V · B New/ Additi onal Sq. feet . Deck ........................... &4
New I Additiona l S q . Feet -Garage ........................ 1 175 Mechanic.i i to be fncl udcd? ..................................... Yes
Plumb ing Work Valuat ion? ........... : ......................... 9000 Mechanical W ork Va luatio n? ................................. 6000
Num ber of Stor ies ................................................... 2 New I Add itio na l Sq. f eet • O the r.......................... 90
l'lum bing Lo be In cluded? ........................................ Yes New I Atl d il ional Sq. Feet -Tota l........................... 602 9
Will Certific ate o f Occ upancy be Issue d? ............... Yes O ccupancy # I • Use ................................................ Res idence ( I o r 2
family )
Comprehens iv e Pl an Design ati on ........................... Sr · High -Density
Res id en tial
Zon ing De.s ig nali on ........... ,_ .................................... R S 7.2
Total Va luat ion: 6 39,534 .95
Mechanical Fixtures
D ucting F a ns 9 Fire p lac e Inse1 t s
f umaces Gas P iping l Ga s P ipe O utl ets 2
H ot Water T an ks
Plumbing Fixtures
B a thtubs 4 Dis hw a she rs 1 Laundry W asher O ut lets I
La vatories 7 S howers 2 Sinks 2
Water Close ts 5 H ose B ibbs 2
CONDITIONS:
l. F ire s prinklers ARE REQUIRED.
2 . No cover ins e ction s can be com leted until a fire s u ermit has been obtain ed and a cove r
inspection by SKFR has been completed.
3. A height survey shall be provided to the City for review and approval at the time of under floor
framing in spection and prior to final in order to verify compliance with the 30-foot h eight limitation.
PERMIT EXPIRES Saturday, 12 March, 2022
Permit Issued on Monday, September 13, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the .use will be in accordance with the laws, rules and regulations of the State of · FILE CltyofFederalWay.
Owner or agent: Date: _________ _
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section
R110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed by City staff.
Tenant Name: GRIB
Address: 31310 10TB PL SW
Includes:
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq . ft.)
#1
R-3
Typ e V · B
4,680.00
DINA GRIB
Permit# 21-102333-00-SF
#2 #3 #4
Bui I~ g Official s/z ;jp
i~lj priority focus in th review and inspection made by the City prior to issuance of this Certificate was on those matters wh ich
experience has shown most severely affect the health and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees
nor warrants to /he owner I occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and I or occupant of the premises.
~ CITY DI' ;;,'
Fe deral Way
PE RMIT#:
Project:
..
21102333 00
DINAGRIB
THIS CARD lS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION RE QUE'!;TS: (253) 835-3050
Address: 31310 10TH PL SW
FEDERAL WAY WA
Scheduled inspections m ay be fai led if thi s card is not on-site. DO 'OT LOSE THIS CA RD. Inspections are listed as close to sequential order as possible
(read left to right, lop to bottom ). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check witl1 your inspect or if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back o f thi s ca rd.
[J]
By
0
By
[I]
By
§]
By
§]
By
fifil
By
@
By
By
D
By
SWM Precon S ite Mtg ( 4400)
Approved
Da te
Foundation Wall (4115)
Approved lo place concrete
Date
Slab/Concrete Floor (4255)
Approved to place corn:rete
Date
Shear Walls (4245)
Approv ed to install si ding
Date
Mechanical Ro ugh-in (4165)
Approved
Date
Interim Erosion Control (4370)
Approved
Date
Insulation (4150)
Approved to install wallboard
Dat e
Final -Mechanical (406 5)
Approved
Date
Rough Electrical
Approv ed
Date
0 Initial Erosion Control ( 4365)
To be done PRIOR to breaking ground
By Date
[i] Drainage/Down spo ut (4 040)
Approved 10 backfill
By Date
!IJ Under fl oor Framing (4285)
Approved to sheath ll oor
By Date
!ill Roof Sheathing ( 4220)
Approved to install roofing
By Date
fi1) Gas Piping (4125)
Approved to release test
By Date
r Prior to sc heduling a Framing ins pecti on;
El cctricnl , Pl umbing & Mcc hnnicnl Roug h-i n
nnd Firt/Or:ift S1o p inspect ion s mu st be signed-
\. off and ;1pprovtd. IBC 109.3.4
l!fil Gypsum Wallboard Nailing (4130)
By
By
D
By
Approved to install mud & tape
Date
Final -Plumbing (4075)
Approved
ft,J Date 5 ? 1 V
Final Electric a I
Ap proved
Date
II] Footings/Setback (4110)
Ap proved to place concrete
By Date
[!] Plumbing Groundwork (4190)
App roved to cover
By Date
l!:] Floor Sheathing ( 4105)
Approved to install floori ng
By Date
lg) Rough Plumbing ( 4230)
Approved
By Date
fill Fire/Draft S tops (4095)
Approve d
By Date
' 1w Framing (4120)
Approved to insul ate
,J By Date
~ Final Erosion Control (4375)
Approved
By Date
Final -Building (4 050)
Approved
By 6 Date
D Right of Way
Approved
By Date
Building Di visi on
33325 Eighth Avenue South
Federal Woy, WA 98003-6325
Phone 253-835-2607 Fox 253-835-2609
CORRECTION NOTICE
ADDRESS: 3 \3 \0 l0 tt\ '1-j L,t} PERMIT#: ~l-t)z;53~ -(}/J
<
IF YOU HAVE QUESTIONS CALL _ ....... Jf_a~. ~-------+-------(253) 835-z£u "'f-
VHEN CORRECTIONS HAVE BEEN MADE , CALL (253) 835 -3050 FOR RE -INSPECTION . SEE BACK OF CARD
OR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
9;;/q-rUJ __ :)'.......,,__,Q,c..___ ___ _
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page_of _