23-101115Ciry or Ftdtnal Way
Com111uni1y Ocvclopmc111 Dl:pl
33325 8th Ave S
Federal Way. WA 98003
Ph: (253) &35-2607 Fax: (253) 635-2609
,, .
ILE
Project Name: STANDISH/MOORE
Project Address: 503 SW 293RD ST
Project Description: gas furnace replacement/ new tstat
Owner Applicant
DANE STANDISH TAYLER MANNINGPA CIF!C HEATING &
503 S W 293RD ST COOLING
FEDERA L WAY WA 98023 8607 DURANGO ST SW SU ITE A
TACOMA WA 98499
Additional Permit Information
Is this an Online or O.T.C. appli cation? .................. Yes
Circuits -Residenti al
Electrical Fixtures
Thermostat
Electrical
Permit #:23-101115-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 119600 1623
Contractor
PAC!FIC HEATlNG & COOUNG
(E LECTRICAL)
PACIFHC798 DR (4/12/23)
8607 DURANGO ST SW SUIT!: A
TACOMA WA 98023
PERMIT EXPIRES Wednesday, 30 August, 2023
Permit Issued on Friday. March 3, 2023
I hereby certify that the above information is correct and that the construction en the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Owner"' agent: oJSf f°" r d the i::°' Federal Way . Date : -~--....+-~f\J ~"'=--. ---
F,wtft/J
C llY Of
Fe dera l Way .
THIS CARD I S TO RE \I . .U., 0>-SITI
Construction Inspection Record
1:--;S PEC TIO> R.EQl"'ES T S: (:?53) S35-3050
Scheduled inspect1ons m.,y be f:u led iftlus card lS not on-site. DO :'-OT LOSE THl.5 CARD . Inspec1foos are listed as dose to sequ entia l order as pos;ib le
(read left to right. top to bottom) P!e:tSe sclledule lllipe,clloos as appropriate . Work must not be covered uottl 11 is appro\·td . Clleck \\.ith your UlSpe,ctor if
you are lllb-ure about lllY of the UlSpeCtious or the inspection sequence. On-go1t1 g inspections are logged on the back of I.his card
ELECTRICAL
El Ufl:R Ground (4295) [il Ditch conr (4030) CJ Slab/Concrete Floor (4255)
Appro"'ed Appro,,"td Approved to p~ concrete
By Date By Date By Date
0 Pool Bonding (4195) ~ Tempora~-Power (4275) 0 ~nice (4235)
Apprm"td Apprl>""td Appnwed
By Date By Date Br Date
0 Feeders/Sub-panels (4045) ~ Rough Eledrinl (4225) [II C eiling Conr (4-020)
Approi."td Appro\-ed Appn,ved
By Date By Date By Dllte
Final -Elechical (4055)
By 1/ A:::~ -J}f ~
MECHANICAL
D .Mechukal Rough-in (4165) [il G~s Piping (4125} [If Final -Mechanical (4065)
Appro,.,"td Appro""f!d to Il!kase test Appro~
Br Date By Date . By Date
PLUMBING
[J PlumbiDg G1·oundwork (4190) 0 Rough Plumbing (4230) uJ Final -Plumbing (4075)
Appro\'ed to co\"f:r AppIO\"f:d Approved
By D,lte By Date By Date