Loading...
23-101409Ciry of federal Way Community Developmenl IJept . 33325 81h Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SULLIVAN r Project Address: 33202 47TH A VE SW Project Description: Replace gas furnace and install 3-ton a/c Owner Applicant MICHAEL SULLIVAN JAIMIE HOW BRENNAN HEATING & NC 3320247TI1 AVE SW 4601 S 134TH PL FEOERAL WAY WA SEATTLE WA 98168 Additional Permit Information Mechanical Permit #:23-101409-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 189890 0070 Contractor 13R[NNAN ll[ATING & A/C 1.1.C (GENERJ\L 01) RRENNHA971R9 (12/29/23) 460 I S 134TH PL TUKWILA WA 98168 Mechanical Work Valuation? .................................. 7201 Is this an Online or O.T.C. application? .................. Yes Air Conditioners -Stand Alon< Mechanical Fixtures Furnaces PERMIT EXPIRES Saturday, 16 September, 2023 Permit Issued on Monday, March 20, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of OW~lton a_i"f\tEity of Federal Way . Owner or agent _ ~ _ _ ~ ~ Date :. _________ _ CITY OI' --.,.;:::::~ Federal Way nns CA.RD IS TO RE:\Ul'" O~-SITE Construction Inspection Record I~SPECTIO~ REQl"ESTS: (253) 835-3050 Scheduled inspecti01l5 may be failed ifthi; card is not on-sire. DO );OT LOSE IBIS CA.RD. Inspections are listed as do$e to sequential order as pos.sible (re3d left to right. top to bottom). Please schedule inspections. as appropriate Work must not be co\·ered until it is approved. Check \\ith your inspector if you are unsure about any of the UISJ)('Ctions or the inspection sequence. On-going ilb--pections are logged on the bad: of this card. [i] UFER Groun.d (4295) Appro"'t'd By Date 0 Pool Bonding (4195) Appro'\'t'd By Date 0 Feeders/Sub-panels (4045) Approved By Date IIfil Final -:Electaical (4055) Appro,·ed By Date EJ By Mechanical Rough-in (4165) Approv~ ELECTRICAL 0 Dit<:h conr {4030) Approvt:d By Date II] Temporary Power (4275) Approwd By Date [[] Rough Electrical (4225) Appro~-ed By Date MECHANICAL Gas Pipiog (4H5) Approv~ to Idt:ase test ~ By 0 By [!I By By Date By _______________ _,, ______________ ___, PLUMBING GJ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) [I] Approved to cO\-er Appro\-e-d By Date By Date By Slab/Concrete Floo1· (4255) Approved to plact: con~~ Date Senice (4235) Approved Date Ceiling Co,·er (4020) Approved Date FiBal -:\IKhaoical (4065) Approv~ Date Final -Plumbing (407S) Approved Date