23-101409Ciry of federal Way
Community Developmenl IJept .
33325 81h Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SULLIVAN
r
Project Address: 33202 47TH A VE SW
Project Description: Replace gas furnace and install 3-ton a/c
Owner Applicant
MICHAEL SULLIVAN JAIMIE HOW BRENNAN HEATING & NC
3320247TI1 AVE SW 4601 S 134TH PL
FEOERAL WAY WA SEATTLE WA 98168
Additional Permit Information
Mechanical
Permit #:23-101409-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 189890 0070
Contractor
13R[NNAN ll[ATING & A/C 1.1.C
(GENERJ\L 01)
RRENNHA971R9 (12/29/23)
460 I S 134TH PL
TUKWILA WA 98168
Mechanical Work Valuation? .................................. 7201 Is this an Online or O.T.C. application? .................. Yes
Air Conditioners -Stand Alon<
Mechanical Fixtures
Furnaces
PERMIT EXPIRES Saturday, 16 September, 2023
Permit Issued on Monday, March 20, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
OW~lton a_i"f\tEity of Federal Way .
Owner or agent _ ~ _ _ ~ ~ Date :. _________ _
CITY OI' --.,.;:::::~
Federal Way
nns CA.RD IS TO RE:\Ul'" O~-SITE
Construction Inspection Record
I~SPECTIO~ REQl"ESTS: (253) 835-3050
Scheduled inspecti01l5 may be failed ifthi; card is not on-sire. DO );OT LOSE IBIS CA.RD. Inspections are listed as do$e to sequential order as pos.sible
(re3d left to right. top to bottom). Please schedule inspections. as appropriate Work must not be co\·ered until it is approved. Check \\ith your inspector if
you are unsure about any of the UISJ)('Ctions or the inspection sequence. On-going ilb--pections are logged on the bad: of this card.
[i] UFER Groun.d (4295)
Appro"'t'd
By Date
0 Pool Bonding (4195)
Appro'\'t'd
By Date
0 Feeders/Sub-panels (4045)
Approved
By Date
IIfil Final -:Electaical (4055)
Appro,·ed
By Date
EJ
By
Mechanical Rough-in (4165)
Approv~
ELECTRICAL
0 Dit<:h conr {4030)
Approvt:d
By Date
II] Temporary Power (4275)
Approwd
By Date
[[] Rough Electrical (4225)
Appro~-ed
By Date
MECHANICAL
Gas Pipiog (4H5)
Approv~ to Idt:ase test
~
By
0
By
[!I
By
By Date By _______________ _,, ______________ ___,
PLUMBING
GJ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) [I]
Approved to cO\-er Appro\-e-d
By Date By Date By
Slab/Concrete Floo1· (4255)
Approved to plact: con~~
Date
Senice (4235)
Approved
Date
Ceiling Co,·er (4020)
Approved
Date
FiBal -:\IKhaoical (4065)
Approv~
Date
Final -Plumbing (407S)
Approved
Date