Loading...
03-103433 ` CITY OF CITY HALL 33530 1st Way South•PO Box 9718 Federal Way Federal Way,WA 98063-9718 (253)661-4000 wwww cityoffederal wa y.com -,.^ 1 a , i.„, .0811 Mr. Ron Heins . r i September 19,2003 1911 Campus Drive, Suite 225 ' Federal Way, WA 98023 Re: File#03-103433-00-PC,PREAPPLICATION CONFERENCE SUMMARY Mirror Lane Short Plat; 849 SW 312th Street,Federal Way Dear Mr.Heins: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee(DRC)held September 11,2003. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions and Public Works Department,and representatives from Lakehaven Utility District and Federal Way Fire Department. Some sections of the Federal Way City Code(FWCC)and relevant information handouts are enclosed with this letter.Please be advised,this letter does not represent all applicable codes. In preparing your formal application,please refer to the complete FWCC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is Jane Gamble, 253-661-4120,jane.gamble@cityoffederalway.com.For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION The proposal is to subdivide two existing single-family lots to create three single-family lots.The subject property is located at 849 SW 312th Street; zoning is Single-Family(RS7.2). Existing Lot 1(tax lot number 072104-9205) is currently developed with a single-family residence and is accessed from SW 312th Street. Existing Lot 2(tax lot number 072104-9230), is developed with a garage that is accessory to the dwelling unit on Lot 1. The applicant has indicated that both structures would be removed as part of the application. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review.These issues can change due to modifications and revisions in the plans.These major issues only represent comments that the DRC consider most significant to your project and do not include the majority of the comments provided. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. Mr.Ron Heins Page 2 September 19,2003 • Public Works Development Services Division 1. If drainage facilities are required, connection to an existing conveyance system will be required.This may require a drainage easement from adjacent property owner(s) in Mirror Lake Terrace Subdivision. 2. If water quality treatment is required,this project lies within a Resource Stream Protection area,and water quality facilities shall be designed to the Resource Stream Protection Menu of the 1998 King County Surface Water Design Manual. • Public Works Traffic Division 1. Per FWCC Section 22-1474,the applicant/owner would be expected to construct half-street improvements on SW 312`h Street,which is a Type K street consisting of a 44-foot street with curb, gutter, six-foot planter strip with trees,eight-foot sidewalk, and streetlights in a 78-foot right-of-way. The improvements shall be from the street centerline. 2. The applicant/owner shall dedicate sufficient public right-of-way across the entire street frontage on SW 312th Street;to widen and improve the abutting public streets to the City adopted street standards.Assuming a symmetrical cross section, additional nine feet of right- of-way on SW 312th Street would need to be dedicated to the City. Right-of-way dedication shall be conveyed to the City through a Statutory Warranty Deed, and must have clear title prior to recording. 3. The proposed 30-foot easement is not an acceptable access. A cross section"Y"street less than 150 feet in length would need to be constructed to serve the proposed three lots.The plat would need to be reconfigured to meet this requirement. Streetlights would be required at the intersection. • Lakehaven Utility District Sewer main will need to be extended to the far edge of the property,where adjacent uphill property can be served(see section V, item 2). DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference.Each section should be read thoroughly. If you have questions please contact the representative listed for that section. PLANNING DIVISION(Jane Gamble,253-661-4120, lane.gambleQi cityoffederalway.com) 1. Short Plat Process—Pursuant to FWCC Chapter 20,Division 5,"Short Subdivision Plats,"short plat applications are administratively processed through the Department of Community Development Services under FWCC Section 20-83,et al.The administrative review process requires that the Director of Community Development Services issue a decision on the short subdivision request. File#03-103433-00-PC Doc.I D.24477 Mr.Ron Heins Page 3 September 19,2003 Public notice of the complete short plat proposal is required per FWCC Section 20-90, and a 14-day public comment period is provided. However, no public hearing will be required. Short plat filing fees are$2,044.50, less the $382.50 preapplication fee.A master land use application, short plat handout, and code sections are enclosed. 2. State Environmental Policy Act(SEPA) —The proposed short plat is exempt from environmental review under SEPA. 3. Design Standards—All proposed lots must meet the design standards of FWCC Section 20-151,et al.In the case of this short plat, proposed Lot 2 and Lot 3 do not abut the public right-of-way;the proposed access to these two lots is via a reciprocal access easement,which does not satisfy code requirements pursuant to FWCC Section 20-152(d). The short plat must be reconfigured so that Lot 2 and Lot 3 abut either public right-of-way or a Cross Section Y in-fill cul-de-sac(see Public Works Traffic comments below for further details). 4. Lot Size—The zoning for the subject site is Residential Single Family,RS 7.2. Minimum lot size for each lot is 7,200 square feet. Public right-of-way may not be included in the lot area calculations. According to King County Assessor's records,the combined square footage of the existing two lots is 30,032. As depicted,the proposed lots satisfy the minimum lot size requirements;however,as discussed above,the lots must reconfigured to provide approved access, and lot size cannot include dedicated right-of-way or a private access tract. Please be certain to maintain the minimum 7,200 square foot lot size for each proposed lot. 5. Setbacks—Existing and future residences must conform to the following structural setback requirements of FWCC Section 22-631,"Detached Dwelling Units"(enclosed): front yard at 20 feet, side yard at five feet,and rear yard at five feet.The formal short plat drawing must depict these typical building setback requirements. Lot coverage for residential uses is limited to 60 percent and includes all impervious surfaces such as gravel or asphalt driveways,walkways,patios,and roof overhangs. 6. Landscape Plan—A landscape plan prepared by a licensed landscape architect must be provided with the short plat application. The plan must identify landscape features and must show open space and significant trees. The FWCC defines significant trees as being 12 inches in diameter, in good health,and not detrimental to the community or obscuring safe sight distance requirements. Significant trees shall not include red alder, cottonwood,poplar,or big leaf maple.Trees that do not meet the definition of significant should not be represented on either the short plat map or the landscape plan. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION(Kim Scattarella,253-661-4132, kim.scattarel la(a,cityoffederalway.com) Land Use Issues—Stormwater 1. If future construction on this proposed site creates 5, 000 square feet or more of new impervious surface, surface water runoff control will be required per the 1998 King County Surface Water Design Manual(KCSWDM)and the City of Federal Way Addendum to the 1998 KCSWDM. If future construction creates more than 5,000 square feet of new Pollution Generating Impervious File#03-103433-00-PC Doc.I .24477 Mr. Ron Heins Page 4 September 19,2003 Surface(PGIS),water quality treatment will be required per the 1998 KCSWDM and the City of Federal Way Addendum to the 1998 KCSWDM. This project meets the requirements for a Targeted Drainage Review. The project lies within a Level 1 flow control area;thus the applicant must design the flow control facility to meet this performance criteria.The project also lies within a Resource Stream Protection Water Quality Area. Water Quality Treatment shall be designed to meet the treatment criteria of the Resource Stream Protection Menu. 2. At the time of land use site plan submittal, a preliminary Technical Information Report(TIR), addressing the relevance of the project to the eight core and five special requirements of the KCSWDM will be required.A Level 1 downstream analysis shall also be provided in the preliminary TIR. The City has 1"= 100',five-foot contour planimetric maps that may be used for basin analysis. If drainage facilities are required, connection to an existing conveyance system will be required.This may require a drainage easement from adjacent property owner(s) in the Mirror Lake Terrace Subdivision. 3. This proposal meets the definition of"redevelopment"as set forth in FWCC Section 22-337. Therefore, stormwater treatment must be provided for the entire site, including new and existing pollution generating impervious surfaces.Treatment options must be selected from the Resource Stream Water Quality Menu provided in the KCSWDM,which includes bioswale, filter strip, linear sand filter, storm filter,basic wetpond,wetvault, stormwater wetland,or combined detention/ wetpond facility. 4. Soil logs will need to be provided to verify infiltration suitability. 5. For private commercial developments and short subdivisions,the flow control and water quality facilities may be placed underground. 6. Show on the preliminary plans,with dimensions,the proposed location of the detention and water quality facilities. Right-of-Way Improvements 1. See the Traffic Division comments from Traffic Analyst Sarady Long for traffic related items. 2. If dedication of additional right-of-way is required to install street frontage improvements,the dedication shall be conveyed to the City through a statutory warranty deed.The dedicated area must have clear title prior to recording. 3 All stormwater treatment and detention requirements outlined above will be applied to new impervious area within the public right-of-way. 4. Frontage improvement requirements apply to the parcel's entire street frontage, not just the portion of the site that is being developed. 5. FWCC Section 16-47 requires that overhead utility lines be relocated underground if over 500 feet, or three spans,are affected by a public works project. This condition will be applied to SW 312t Street. File#03-103433-00-PC Doc.I .24477 Mr.Ron Heins Page 5 September 19,2003 Building(or EN)Permit Issues 1. The"Federal Way Development Standards Manual"(including standard detail drawings, standard notes, and engineering checklists) is available on the City's website at www.cityoffederalway.com to assist the applicant's engineer in preparing the plans and TIR. 2. A final TIR shall be prepared for the project and submitted with the permit application.The final TIR will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 3. The applicant shall provide a geotechnical report that addresses design pavement thickness for the roadways. 4. The applicant shall reimburse the City for the cost of all required regulatory,warning, and street name signs that are installed, prior to acceptance by the City of all other required improvements. 5. Bonding is required for all improvements associated with the project.The bond amount shall be 120 percent of the estimated costs of the improvements.An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called.Upon completion of the installation of the improvements,and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount for a two-year maintenance period. 6. The developer will be responsible for the maintenance of all storm drainage facilities(including the detention and water quality facilities), and street systems for the two-year maintenance period. During that time,the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. 7. When topographic survey information is shown on the plans, as may be required,the vertical datum block shall include the phrase"DATUM:N.G.V.D.-29"or"DATUM: K.C.A.S.,"on all sheets where vertical elevations are called out. 8. All drawings shall be drafted/plotted on 24"x 36"or 22"x 34"mylar sheet with permanent black ink. Drawings submitted for plan review shall be printed on 24"x 36"or 22"x 34"paper. Site plans shall be drawn at a scale of 1"=20', or larger.No architectural scales are permitted on engineering plans. 9. Provide cut and fill quantities on the clearing and grading plan. Erosion control measures,per Appendix D, 1998 KCSWDM, must be shown on the building set plans. 10. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC WORKS TRAFFIC DIVISION(Sarady Long,253-661-4139,Sarady.long4i cityoffederalway.com) 1. Per FWCC Section 22-1474,the applicant/owner would be expected to construct half-street improvements consistent with the planned roadway cross-sections as shown in Map III-7 of the Federal Way Comprehensive Plan(FWCP)and Capital Improvement Program(CIP), shown as Table File II03-103433-00-PC Doe.I .24477 Mr. Ron Heins Page 6 September 19,2003 I1I-19. Based on the materials submitted, staff conducted a limited analysis to determine the required frontage improvements in meeting the FWCC. Based on the analysis and FWCC,the applicant would be expected to construct half-street improvements on SW 312`h Street,which is a Type A street, consisting of a 44-foot street with curb, gutter, six-foot planter strip with trees,eight-foot sidewalk, and street lights in a 78-foot right-of-way.The improvements shall be from street centerline.The applicant may make a written request to the Director of Public Works to modify, defer,or waive the street improvements requirements. 2. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety purposes,taper rate shall be based on WSDOT Design Manual; WS^2/60,or AASHTO as directed by the Public Works Director. 3. Assuming a symmetrical cross section,an additional nine feet of right-of-way on SW 312th Street would need to be dedicated to the City.Right-of-way dedication shall be conveyed to the City through a Statutory Warrant Deed,and must have clear title prior to recording. 4. The proposed 30-foot easement is not an acceptable access.A cross section"Y"street less than 150 feet in length should be constructed to serve the proposed three lots. The lot would need to be reconfigured to meet this requirement. Please see enclosed type"Y" street. BUILDING DIVISION(Scott Sproul,253-661-4122,scott.sproulnu,cityoffederalway.com) Codes 1. Uniform Building Code(UBC), 1997 edition Washington State Amendments,WAC 51-40 2. Uniform Mechanical Code(UMC), 1997 edition Washington State Amendments, WAC 51-42 3. Uniform Plumbing Code(UPC), 1997 edition Washington State Amendments,WAC 51-46& WAC 51-47 4. Uniform Fire Code(UFC), 1997 edition Washington State Amendments 5. National Electric Code(NEC), 2002 edition 6. Accessibility Code, WAC 51-30 7. Washington State Energy Code, WAC 51-11 8. Washington State Ventilation and Indoor Air Quality Code, WAC 51-13 Building Criteria 1. Occupancy Classification: File#03-103433-00-PC Doc.I .24477 Mr. Ron Heins Page 7 September 19,2003 2. Type of Construction: 3. Floor Area: SF 4. Number of Stories: 5. Fire Protection: 6. Wind/Seismic: Basic wind speed 80 Mph, Exposure 25# Snow load, Seismic Zone 3 Building Permit Requirements 1. Submit complete application obtained from packet. 2. Submit two sets of drawings and specifications. Specifications shall include: Soils report x Structural calculations x Energy calculations x Ventilation calculations. 3. Submit x copies with King County Health Department approval stamp for all projects that include food service facilities, septic systems,or other elements within the project which require health department approval. 4. Wet stamp and signature on all sheets of plans and cover of calculations at submittal. 5. First comment letter can be expected within three to five weeks of submittal date. 6. Recheck will occur in one to three weeks after resubmittal. 7. Federal Way has an expedited review process. Information is available at the front counter. 8. Plans for all involved departments will be forwarded from Community Development Services. 9. Separate permits are required for electrical, mechanical,plumbing, fire suppression systems,and signs. Applicant may apply for separate permits at any time prior to commencement of construction. 10. Changes to documents shall be accomplished by one of the following methods: redline, 81/4"x 11", or full size sheets and submitted prior to plan approval. 11. When required, special inspections shall be performed by WABO approved agencies, or by agencies approved by the Building Official prior to permit issuance. Construction must be approved by all reviewing departments prior to final building division inspection. 12. All concerned departments must sign off before the Building Division will final.Building final must be approved prior to the issuance of a Certificate of Occupancy(CO).The City of Federal Way does not issue temporary CO's. File#03-103433-00-PC Doc.I .24477 Mr. Ron Heins Page 8 September 19,2003 13. All construction projects may be required to have a pre-construction conference. If a pre-con meeting is required, all subs,the general or representative, the architect or representative,the engineer or representative,electrical contractor, and any other interested party, should attend this meeting. Meetings will occur at the Building Division and will be scheduled by the inspector of record for the project. Site-Specific Requirements None. LAKEHAVEN UTILITY DISTRICT(Mary E.Young,253-946-5400,myoung(alakehaven.org) Water Issues Water service will be provided from SW 312`h Street.Private utility easements will need to be provided for the building supply lines. Sewer Issues A developer extension agreement will be required to extend mainline sewer facilities to serve the site.The owner should apply separately to the District for this process at the same time formal application is submitted to the City of Federal Way to avoid delays in construction. Please allow three to four months for plan review and approval. General Comments The District's Capital Facilities Charges are calculated on the basis of Equivalent Residential Units (ERU). One single-family residence is equal to one ERU. The District's current Capital Facilities Charges are$3,205/ERU for water and$2,721/ERU for sewer.A credit of one ERU is allowable from connection charges paid for water and sewer service to the existing house on the site. FEDERAL WAY FIRE DEPARTMENT(Assistant Fire Marshal Greg Brozek,253-946-7241, gteg.brozek iifederalwayfire.org) Water Supplies For Fire Protection A Certificate of Water Availability shall be provided indicating the fire flow available at the site. Fire hydrants shall be spaced 700 feet or less apart. Every building lot shall have a fire hydrant within 350 feet. All measurements shall be made as vehicular travel distance. Fire hydrants shall be in service PRIOR to and during construction. Fire Apparatus Access Roadway Fire apparatus access roadways shall be required for every building when any portion of an exterior wall of the first story is located more than 150 feet from fire apparatus vehicle access. File#03-103433-00-PC Dec.I .24477 • Mr.Ron Heins Page 9 September 19,2003 Fire apparatus access roads: 1) Shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet, six inches. 2) Shall be designed and maintained to support the imposed load of a 25 ton fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 3) Shall be not less than a 20-foot inside turning radius and not less than a 40-foot outside turning radius. With a dead-end in excess of 150 feet in length shall be provided with a cul-de-sac or Fire Department approved alternative at the dead end.All such cul-de-sacs shall be not less than 80 feet in diameter. Gradient shall not exceed 15 percent. Serving a single residential property which have a dead end in excess of 150 feet in length shall be provided with a turn around approved by the chief(KCFD#39 Administrative Policy Guideline No. 1006). Exception: When buildings are completely protected with an approved automatic fire sprinkler system, these provisions may be modified by the chief. Fire apparatus access road gates shall comply with KCFD#39 Administrative Policy Guideline No. 1001 (copy attached). Automatic Fire Sprinkler Systems An automatic fire sprinkler system shall be installed in Group R, Division 3 occupancies: 1) When the occupancy exceeds 2,500 square feet(including attached garages)without adequate fire flow. 2) Without approved fire department access. • 3) When the occupancy exceeds 10,000 square feet. 4) When the building is classified as an over-water structure. Comment: The minimum fire flow for one-and two-family dwellings shall be 1,000 gallons per minute. If the slope of a building lot does not allow the building(s)on the site to comply with the"life safety/ rescue access" requirement,the building(s)shall be provided with an approved automatic fire sprinkler system. Life safety/rescue access shall mean an unobstructed access to all floor levels and each roof level of a building on not less than 20 percent of the building perimeter by utilizing a 35- foot ladder.An alternate method would be at least one stairway enclosure with exit doorways from each floor level and with a door opening onto each roof level that conforms to the requirements of the Uniform Building Code. File#03-103433-00-PC Doc.I .24477 Mr. Ron Heins Page 10 September 19,2003 PLEASE NOTE,FIRE DEPARTMENT COMMENTS ARE VALID FOR 180 DAYS FROM REVIEW AND ONLY FOR THE PLANS REVIEWED. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application. The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWCC Section 22-1657. As you know,this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWCC and other relevant codes carefully.Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment,please contact the appropriate department representative noted above.Any general questions can be directed towards the key project contact,Jane Gamble,253-661-4120. We look forward to working with you. Sincerely, N4/Pike— J ne Gamble Associate Planner a enclosures c: Sarady Long,Public Works Kim Scattarella,Public Works File#03-103433-00-PC Doc.1.D.24477 f I I L ri .,' :,-',..-:..ii. ..,..,,.*,.,:,,',.,:,,,,,:,.:.,' ,,-,,,,,. : ' : :• -,•,• , ,j,.--;',.:,','..c:HH'''.'. '.i: . ', .•'',. '-Y';' ';';' 'Itit' ''',,A'1'''''t''lltit LANIIVSE: -:, .P,',:,:'...i..':A-'?:,;''.'P4,k'..:-':.,.!:.',.,,;,.,;'.-±-,1.,,•..:.;11•.•.••.-'','i,,.'.,'a,*,,'j:':''''''2,::•':,'.,::.':,.:.':1,:.-'.:..'::.,.:::f:'f:i:..',:1'.,:l..•.l,,-i,-.,.':•,..1:,::.i.',:•i.:f,,,:i..,.i..,'i.::,'i.,:,'',.i'„':,,..•.:,.:..,..,.,:,'.;,..;-.,-..::,',',::,_'A;:,,'.:-;-:,:',•:.,,.,,ii..' ..-';...,.,:.•••:-,,..:...";...,::'::,,.•,-..:-.•.--..'.,-,•.::";•,-',.ii..;',':,'-,'•,•..',:,'.''-.„.::..,:,.,.::,::..'::..:._:::'..-.:I:'1;.,:,.-.',,1;.:1:'ii'.!'::',:'':k'',.' ,0:,,:','.',1',,,;,.,,';:'':.'',-''•,;:..H.:',:!:.:.:..'.,-.:,',;:,.:,•..,•E,• •,•,':,I-;,,::..:::::)::--.::''.:'....'•: ,,,,:Z.,j':.,:',;•'-,'•1,-,.':''-'',.•,',',•.,,,•.1:,0":.4:..*:'':*',0.84 140 ors Pof i:' .16 3� 9 i lv r l�t�1 c wi'i y cg tV Y3O P1rst Way Sputh PO'iprt gf1 t e 'ral 2 aQ F eral Via I�VA DB �718 Z 3 66 t 40UQ 1~ax 2 3;6 •1 41 9 P, Li1rIA` , federalw ' In ahc Yr o NC4EP1. �UlQ '. I • � et _.'l' ICATXON o(s) • • /f Prroperty:Address/LoEattott ' g`t� 6, ,, ,3 f . '� �•' � .t9 . Pa:reeM NUiiiber(s) a! .a*1 ` ;:,1 4` ' & 7Zf 9 : r:oje+at r escription : gR� 4; bt u/5hifl . .;z i, ,f ' �r: 1P ,1A'SE PRJN `X'$''''';,r:%7'7'1,g-•:':'',:'t.'''',7,.;''7:;.,..!.''"! e'Qf 'eri ntt'Jttegt rett' ' , _�_Annexation ..:!,;H...;..:.';:_,...•,-,.,:'•:..'..1,.-:...7,..!.•:'0.::••::,',!!,,'...'!1'-,:,•,•.r,,,.-:'.,':.!.,„.'!,.,E:•'',.'",r,,-!i.•:'•.,,..'L•..,..'_•,..,.'.':'::'',.': Appiic•atit ,.-.--'*.1:.17:,•7'..:-'._.•:.1:',.':,. ;.i''::.",.':i-:-.-.-:'.:.;-.-:'':!.,-: i' ., •'::,.:'-,:•..,,...:'!,, 13inding`Site•Plan !Qw j,,:,.,•::•-,,:"-!:.'.o// /„$ :,!,,...,.-H-i,.,:•.:,--•(:•7!.,.•,:•,';:,!.:':':.;•!;',.,-',-..-.::,.,..•!•. .:],•;..-•.'-!;'„,-,.;'.,..:''.,-.-:''-!!,;7,.'',,'..-I;::.';:;;‘-.-,;.,:,.'•:'!,;,':,-.J':,,'':,,,•:,.:.:',';•`,1, Roundal` ClueAci ti ttnent : Naane • Comp>Gilsti/ e Adj Address 9 ql 1- S.U) a a.M G/ L P. , 2-2 S` Ctty/State: t- I $'c..,.,;;':j.'.,,.,,;'''-:':...•,..!,:.,,',..!:,..'•::;:..:.,-1...,.i:,,:.,,''':'.:!.',::•!.,,•!/,.,::,:-:-,..,,,.,,,:..,;,:''':.,,:!..,,',,:!....2,3 ..:!::!,!-,,.,;.'.!,.-...,--,-..;.-.-...!,'',,-•:-;.,-;'..,,l;'..:!'',•.,;.-'.-...!.,-.,..:(,:,,',•!,!:,•;'.':.„,:i...;:!..:,,.,',.:-'_,:.,.!..,'.:,,'•.,'.-,': .,r•.,,.-:i,•-i':;,.,,.,.:',.,:,!.;.,:..,::,,:H,,:r,, T�and ii'rface Nlpdifcation L. !'4 ,e. l.:,'•..':..,,.,:,_.h',:..,'-!,,;,.,I.:,,.i.'::.:,.,.,"• Lot Ltnt;fltmii atlQn Zip; area Batton Gpioti ttce Phone: , Fax fir- c Process�°(J)lrect6t s Approvals 53 r 9, J�-. 6/ A'$e , ( !., Process ii(Sae Plan Tleview) Email Process III(Project Approval] 'Signature:' I��r��// Process IV(13eti�ing t xaniiher's Decision)' C'r' y.:. Process V(Quasi»Judicial Rezone) ' ' ',Agent.(if.different than Applicant): Process VI SEPA w/Prof ect 'Name. . SEPA Cni'Y Addtess Shoielfii.e: Variance/Condttioiial Use City/State; Short Stlbdtvision • Zl.pi Subdivision' ' Phone: Variance: 'Coiniriercial/Residentta] Fax ,'-••.-.,;,,;,„•,.,,:,.::,.i:.,.!'1-.:,:',•,..,,j,',::;:;..:.::•?.,;!-,:,:-,,,,,..,.•,.,,:':,!,:.:,.:,:....,,..;..:..'.:•.',-,j:,„',..':...,.-,',.'''.,,..,,.„.::,.•:.,r.,,,,,',..':.,.'':--,:r';.p..,;,.:,::'.,,''''•::,,-,,,.:.f...,,,:':,:.:,,;.::,;,,,.',,.::i!,,',,,.::.,:,..,.'':.„,::;.i:'::,::,:-:,,,::HL:';„.,,:,,,:..::•!,.':--";,:.....,-.'',,,-_.,'.'..,.-''',,.,..,':'.:.-.,,..-,.:,,?:.:,!:i,,-•l''-;':!:,,;.,.,,„,:,.,,',,''.:'..,!•_,:1,,,Ic:,::.,.' �, r Email: uirctl( YIttOI',Irisltion Sigi atut'e . i,,.:,-..::1,...,.:.,,,:.,• ,:,. •.,:_.•.,.::.:,,,..;';.':,,•:.:, , ,,...-::;,.-.,.:::,, 'Z2.0O onif g Designation. ' Owner .c G.r / •• 7 GI 14 y /� D Comprehensive Plan Designation /4''i //f�I/,G/' �° ' j ,Flam'e: •w• 1—i?.g' 600...Value of Existing Improvements' ' Address: ZL� i2 faj f � � CitylBtate:� 7 v�'.vo 'Q t9G6i2•�l.u14 y�I.V A- q$c9,•',,,::t,•,::-.;,,-.:,.-,,,Z3 Value of Prppased 1►i�provements Zip: :':.•,_,_,,,,,,,.::.,H.7,. Phone': 1. p -. ��' y lJnii`arni tioildit g Code(UliC): .+ ! i woe lM. I SIr f[�- Fax:. ,,,„:,i•,,"::-,.,''::•:,:',,:,.,..,::,,:...,..:I:;,.;.:•:',E.:,,,,,,-:,,,,,'.,i::,,!::,-,‘'.:,,,',.::',,,'.,',.,,,,,,7,.','',,.; cctipancytyp6• Email R./ari Constrlictfoti,'TYPe Sitiature: /0 : '.....,.,,,..,.'.„.',,,,,,,"!,,,,..,:",,,,,,:''; 3u11etut,op3 March 3 2003 Page 1 of 1 k\Hindeuts• Itevised\Master 1 and'Use Apphcatioit;' • I I)i9T �-Q- w a .Q+v1 ee -1-"P S4eletr F/20,42TV/ _ % .q-) `-' -'` 3, egk% �, i �1 Ss. °3 C\I \ \ ;,--, tr _ ` co (n O V vV21 98S021, L0c9 900Z99 dSOA oo f f M rn rl1 87-m3 N C� _ %. >r. O N N 0 �J� L 5980 Z80LL 9 LOLL9 dSOyl I M , / U il 1.:. jAd„b N i.J Lo r7 N 1 J ! T'kJ)1\itaaikl} N .. On M -- iV .. :...: ;) / \\Cfl,./ ,, I Jy / I Zil ( ' '' -).-'' ')--'\\'— if) ,,,,,C;11X) M u c z 7.5 2B Ocil 3 . /NIA 1 , 1 i i • 1,_ co a>-) L� /1. \ oI OJ/ QI end _ � O end :g ,. RECEIVED . I ,IJC 2 2003 1 CITY OF FEDERAL WAY OAd::8 7 I BUILDING DEPT. -\ 11 7,�\ �� I ���Cl� OS In �I� �S A , CITY OF CITY HALL �. Fe d e ra I Way 335301st Way South • O Box 9718 Federal 980al Way,WA 9 (253)661-4000 www.cityoffederal wa y.corn August 22, 2003 Mr. Ron Heins I liars 1911 Campus Drive, Suite 225 Federal Way, WA 98023 Re: File No: 03-103433-00-PC; NOTICE OF PREAPPLICATION CONFERENCE Mirror Lane Short Plat; 849 SW 312`h Street,Federal Way Dear Mr. Heins: The above referenced proposal has been assigned to me as project planner. At this time,the application and preliminary site plan have been routed to the members of the Development Review Committee. A meeting with the project applicant and Development Review Committee has been scheduled as follows: Thursday,September 11,2003—9:00 a.m. Mt. Adams Conference Room, City Hall,First Floor 33530 First Way South PO Box 9718 Federal Way, WA 98063-9718 We look forward to meeting with you. Let me know if you will have more than four people attending the preapplication conference so I can make arrangements for a larger room. Please call me at 253-661-4120 if you have any questions. Sincerely, hit Jane Gamble Associate Planner Doc.1.D.24390 vY4 e •o Q�e p oCrr. • Qa�7 me � ��vc 4 ce, GeV� 9y Q � c1l � `9 Q,_ , 4104, Y/ qtr.1"..7%,===77'';;"$"7".";'.'gr.1$ -,4, ..--.- „ ,_..4.,,, , ,,..:-..,,,,,,, ,,ztvar....zsz,......m.,..t,..t.,,,,, „,n_ ‘,00.is rift .Lis iv , is a. . , 1 jl _•��--- C C�'�=. �= as vccy .A,` t.�Alit,,, f=—=_u)Ir 17..— • 111III= I �1�I■l��.l■■I.. Ii ';:.' ' • .- Q4.1 in Mr _ _ E j .Ir`��AZ ,.,A,-_-.----____.11�1 7, U" 111=1. ■I. I L- : r - 3 _ Et IIIsue-. .,t ./'',�; s," t _ itl '' G '%� _- ' - . Win`' :xi",.. 'r/..tr r 1 J T'- KITCHEN NOOK 8-0 x 15-4 9-4 x 10-0 MSTR$EDRM MSTR 6A ;;_ 13-4 x 15-8 ., r DINING ; pp FAMILY 4-8 x 13-4; J 13 8 x 17-4 10 libi LiES j EMI 1 ii_-_.n� 1 1 I im 'DM 11111 y _ .. lir I I I 15EDRM 3 ,LIVING 9-4 x 12-0 11-4 x 13-8 _ Up OPEN FOYER BEDRM 2 ' DEN 9-8 x II-8 9-4 x 13-4r...± ' ow L� �''� .MI BA 2 .. A O � ^ IF[51 .. ., .. >, COV'D PORCH I' \ ". \ J 6. o 3-CAR GARAGE tu W 21-4 x 53-8 K K Il = 5 / 9 ✓ O, r I O 1 /r s s I DIMENSIONS AREA SUMMARY 42'-0"wide x 68'-0"deep PLAN main floor. i�rE M2115A3S-0 upper floor. total area: 21115�s.5 ,0 2003 ARCHITECTS NORTHWEST WOODINVILLE,WASHINGTON TOLL FREE 1-888-21172-4100 IT BU LDING DEPT. AY CVO,i 4 .11 4., • .,,,,, ..." ,!,.._- .1,,,24--,-,1/4.S , .1.4t._ k,...‘,. v, ..e-t ., , , . • .4*, W... ‘..st 4, ,,..,,,,, ,,,,, ..,,_.....N,... y, „.... ............................„.„.... --__.... .........„,„ . .., ..„ ..,‘,„, ,,, �"- • .�\���.� .a aw — era. 1�i,;, .,%//// �����a�a.����a�a'����:� '..'maw ► '-.i///I ///:�'������ ��waa���a�� �� a �. ate\���a\�e��\�\�� — � _ _ i era 1 LLf101 JRl' 1 I �' i•` - ' al um I 1 I►l"I allul I lilt .. = � I�= I `�''Illwfiri- �11 Atitk . __...L._._._.„..._.r, -1.... rrs NOOK $FORM 2 4-0 x 4-4 4-4 x 15-4 . / LIVING M5TR SEDRM J14-0 x 15-0 15-4 x 15-4 III o KITG44EN 0 SA 2 10-4 x 11-s / I 8 f.w, air 1 0 MSTR I „1 SEPR 3 DINING FIIIII UTIL W Q /0 ( II-4x11-5 10-5x11-4 gNTRM /) m_ "v4 t Z 1 I W -GAR GARAGE tt ' 21-4 x 21-8 0 z F o Ill ~uu RECEIVED a —a AUG 2 9 2003 i CITY OF FFnFRAL WAY 1 AI ,L�1ftR' . ' DIMENSIONS PLAN main floor. 1660 s.f. 56r-0"wide x 54.-0"deep R1660A2F-0 total area: 1660 s.f. ARCHITECTS NORTHWEST WOODINVILLE, WASHINGTON TOLL FREE 1-888-272-4100 J .t. ,r ‘..r.-1 0/N„,,-.- • � Imo i,� ., p ✓ ` .. . . moo..► I .f.._ . i :. .,. // .. a�.........._,.. .. ,„� .■ . Sce\i "l u■a t. 011001�.`\V a � , 6 1 II i . f , ,i \\ it Iti �2 : -,. _ � h/1.41 4. '� i IC ► i�� sr��4II , � ,� ���1 : p i mt �zaia � s *awn, \/ � 0= IA il ! S = I I I, � - 0h II� me �ri1Ir� � I �. .�, `�uvIVy . � p1 . ,y■v EDEDEDFIEJ .,- .ose�n --�- - - L am.-r- - or KITGFtEN NOOK FAMILY li BEDRM 3 J BEDRM 2 1 - q-4 x q-8 10-0 x II-b II-8 x Is-e q-4 x II-4 4-4 x II-4 1 C7 I UT.;AL . 1 WIG i r-- DN MEI O LOFT X TIL r-' I DINING I i O 10-0 x II-8 O: 10-0 x D U II-8 14 MSTR BA D z imm z Am. H x I .ate tt o 1- v O UP z MSTR BEDRM Z LIVING FOY R �-GA� 2`F'—ARAC'E N OPEN TO BELOW 0 I Iq-4 x Iq-b U 13-8 x IS-4 11-8 x 13-4 IIII 1 ,\ _, /,.... , ' I I Q --,1- ____/2 Lt. ct i Jr y Q _PORGI I-- ` O 1 .. MIME RECEIVED I Ali292001 AREA St.1M A Y DIMENSIONS PLAN 0'6ERA6 36'-0"wide x 38'-0"deep CIu �p.91i"..,- per, s.f. M 1784A2F-0 total area: 1784 s.f. i ARCHITECTS NORTHWEST WOODINVILLE,WASHINGTON 'TOLL FREE 1-888-272-4100 CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE August 22, 2003 TO. Jim Femling, Development Services Manager Mary Kate Martin, Building Official Mary Young, Lakehaven Utility District Greg Brozek, Federal Way Fire Department Geri Walker, Federal Way School District FROM: Jane Gamble FOR DRCMTG. ON: September 4, 2003 - Internal September 11, 2003 , 9:00 - with applicant FILE NUMBER(s); 03-103433-00-PC RELATED FILE NOS.: None PROJECT NAME MIRROR LANE Short Plat PROJECT ADDRESS: 849 SW 312TH ST ZONING DISTRICT: RS 7.2 PROJECT DESCRIPTION: PreApp - Short subdivision of 2 lots to 3 LAND USE PERMITS: Short Plat PROJECT CONTACT: RON HEINS 1911 CAMPUS DR Suite 225 253-952-5784 (Work) MATERIALS SUBMITTED: Preliminary conceptual drawings CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT REVIEW COMMITTEE SIGN-IN SHEET PRE-APPLICATION MEETING File No. 03-103433-00-PC Mirror Lane Short Plat Pre-application Conference September 11, 2003 .a1,140.4 S►4/u I f Co - 12/a0vi i 4Gi - (Cc So/ rd g66 -a 14 -574; 1-014. -l>(o[ -`f 3c1 Crate �� V". / 2 I z�� `/q Q,- �z-c 1 MA-RY Dl/Al6 /KIJ A AgAJ v7/L/Ty I>15-,e/c-7 253—946-s-,-/LtxD K/fri Sc 77 REZ-14 ptv- I7ev, 5e-rv,ccs 2 3 -4M -y13Z (",6- reati/Af5 ��� -i -eS /Qeizri S Svsz-S 7s/ LAKEHAVEN UTILITY DISTRICT 31627 1st Avenue South • P. O.Box 4249 • Federal Way,WA 98063 COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: September 11, 2003 (JG) SUBJECT: Agenda Item No. 1 - Mirror Lane Short Plat 03-103433-00-PC MAJOR ISSUES: • Sewer main will need to be extended to the far edge of the property, where adjacent uphill property can be served. (see section V, item 2) V. Lakehaven Utility District(Mary E.Young,253-946-5400,myoung@lakehaven.org) Water Issues: 1. Water service will be provided from SW 312th Street. Private utility easements will need to be provided for the building supply lines. Sewer Issues: 2. A developer extension agreement will be required to extend mainline sewer facilities to serve the site. Owner should apply separately to the District for this process at the same time formal application is submitted to the City of Federal Way to avoid delays in construction. Please allow 3 to 4 months for plan review and approval. General Comments: 3. The District's Capital Facilities Charges are calculated on the basis of Equivalent Residential Units (ERU). One(1) single-family residence is equal to one (1) ERU. The District's current Capital Facilities Charges are $3,205/ERU for water and $2,721/ERU for sewer. A credit of one (1) ERU is allowable from connection charges paid for water and sewer service to the existing house on the site. I 4 41 4 (n — 22 Z PVC x L`g0 42 LJ. � 1 0 4 Q CT. " 43 Q 1T _ 0...j .., , 45 44 il 10' 2-- _ w ®_ a _` 24 W ' ' TIR_!A Link 1 C A TR. A 0 25 D (1) 49 O 2` 25 22 S.W. 312TH ST. 1 Z ni T cn fV � 8'Pv6vv 1 2TH ST,_< r 14 N 1a--co F t i , _ ,_____ _ , „...., , . i . ., 28 28, -00 U QD CO w LOT TR. B a oG NLOT 1_ M 1 co 20 P 00 II J 0 - 03 o ��4 PLOT 2 oN LOT 103 CO Q. B a a 2 o U 3'80 a ON r `C` 1 9 Y Y : 6 0653 8"PVC 0( TR �� ��u > r! CM UM �;I OM I am A - g \3": 7 SEWER ULID2BO NDARY #3 20 :� 6 ) -� TR 3 L-- 15 13 � &y ' A 57 •: 2 10 : r + - 10 m C 0,4 ! c1:1)3' ;;"PVC i• . 1 .''A40S � `t�� W 313TH CT v, 74, •_ Y, v y 1357 12 /� 1� 8„PVC 405' 850'- •u o -�— 9C�C�: O ~ 23 10 i as' \ 12 18 co, 8 \ o TR 13 14 15 16 17 n TR. C 90 1.4' 4"[� 41 C 3( a 16 15 14 TR. 13 4 , 11 10 g 8 7 6 5 1 12 17' r3 j 'o0 n 194I 1 0941 11110111- ; •v '".1: 8"DI / 3 Nv,t /0.--7 K SW314TH PI�� zz &41 03-103433-00-PC i \4r A r 4 6 27� Z =42 V 'PVC i1 2 90 \ 1 ml 4 Q 7 \ I T1- CT. 43 7, I ).- 23 e 0 �i , , 45 441:4- W �- 10r Ill I 2— -- 214 ICI i TR. A a 1 TR. A -co 0 zr o T 25 1 CD CD O 2. 2 22 1 S.W. 312TH ST. .,,_. 14' A.C. CL150 _ ,,QV6 YV f 12TI-1 S\ jr O N T 0 co -co r I I r-, 28 28, in jCO � 2 LOT io r TR. B in °TL�T-I d - N ar 1 6 V 0 � r. _ o Z '� - 1 Lo in 0 o LOT 22 03 ® ' 103:. LOT 2 B co Q. _ 2 � . 4,- Pi5 a_N v) 3"BG 6 Q\ � ,�'�1 9 Y ,,1� Y :62 dp 0653 da \0 ;* - 36 23' 8"PVC 100A g 8 7 SEWER ULID2 BO NDARY #3 20 \ 6 C100 WOO 3'B C TR f 1 5 13 ) �.\ moo A 57 ,, L \ 1U 2 CO c 4 = ;,"PVC �R• 5 `I 1 13 ' .- '-6 4_0 W 31 3TH CT 5 12 11 a 74 1357 oh XII--1K s" VC 405'-8 01 6 Ire . 50y4., r 11 - 91' }� 9 10 0 45 12 18 co 8 TR .0 13 14 15 16 17 TR. C 1.a'-4"C."41 C fi �-- ''� 3( 0 TR. 41 A13 12 > 11 10 9 � 8 7 6 ,5 16 1 J T� i7 3 \ 1941 1_ _ Y\ 0941 2 gall ff 8„DI \ 3 i Nv� _N . 1L2_i SW 314TH P A n 4 Al 1, Z , 03-103433-00-PC fr —7/4--r7; x►slNc //off. 1 �ax3vr \11:', ��CI h`oc.-6 f_._. \r It AR. DcWfv _ _ i LBT I \� 1, z6• s.F. Ni, �95/ 7 -i- . 1' r\ ,, ,_._ A , , E:,ii;,-- --- \ -„aws... ._ -, i________ifir,....... riL.51—elct:::/,:;:i r N LOT `1,' r t ' '. -.1-: ,n1•• •• -=..ter -, .926.0 " viri A,/or _____._,/ _ , A... Ne . V T �� l _ ..„...__________„_aiwr__t nu A Una je: LVT 3 too �2,5 RE �IV�® 200 $. !6. 2 2 2003 WAY CITY GILD NG DEP„DERALT• BU ,P _� � �' KC 16 A�, R THE FU P 'S� 0� qt-lo WV . V ye ]dAP IB PO N i8T1NG IN LOCATING. U��TEED �� S W , IPURTY -. --- .ate. • 7 /HOW ApQU'RATN ILRA..0tTREItiRNTEI -- - i ' "" -- 1001 4- goo• I SCALE I t • tA o. Bey. eSun 1316.05 "AV P.C, ?4 s 69.9< e N ,12' oep. eY 41SW, 12-TH. ST. . , 671Ree-1 InTtRs �iQ76 d- - Al so-57.-09Ki 194.0 -- 260 - - - - 134.sD0 N ioo 3 �6-56E /6 ^^ '!! A !1'�. o �2.�21 m 7$ O;�I �� CO /f 13 LIQIIY€uiA' t I $:0 3 - -...` 29.763 Sc) 263.10 r \ ® Nu' .0 o T / N 0 (A1 t rg"i'//✓ J J d' 67 F • UNO. i/V7-: v /34.50 N 2 �' 1 In nr/A, e- to . )/2 7 6i corn,Ti Bo, t "' � \n1BD- s7 o,K/« /\ 9AG• ', 5 LOT of SP GE ,, 1 4-, ' ° o. ,, K) I _� a1 N coomoti STY m o n 20 \O o to coku qa m ((F5'.S ` .. 2 • m /�,I 2? • p , o o v- 1 13 0 // d ( ,\\/J OS-57-09h/ fi\ i �r ii jv 0 'C085 2 gMOoF ale 1 T 134.50 0 , t a-56-56E h ti 4B��FQ� ; ro ; h . �0\gk IA LOT 2 � 0 I- 8? o �,q �tih NI Za 5e° 1 N� e9 � . € vi /.188-57-09XJ tJ co LOT ��0' 3t� / Off`, o'ilr, ``` 134.so �N AG, or,Q 2 �$ 1}a. I '-i 7- Zoe 00.E ��y\ `,� ti>. l ti188-°;6-5zv1 fro .p Cn b r08 L 5 ' .3�, go 0 I 83.08 4, p. a1 / ! 0 a 00 �� e 4,15'R c;5'�190 g/ 19 0{:,,,__ 3° �U C-g;-�°�-..\ . `,% 0 ,113.18`6', a ' a 2 //789 I8 ioa 588-58-31.E/oo 46' A(b a !� .�:. IP4,24 .0 * /66..5 5 2/.53 '?9 .`\' .6Z.3 I 10 . -i4-44"C o N\.;. IN` 7�c2\� (1,� .v88 s w 658./G(P.) KriG t14.°lAti�io ,, J. cua1;.;` 1,0l.�G c. • " v �, >�rci � 7 qo� �` 3 Z N I 3 ` - h„' a b' l.- JO6./s.. ..0 16 161 9 •. (r 8 °9 , (PI' �9 _ 1,4119 1 d TR /Ps.�, g N , a ` s ,P . oo ti9P'920 t R , 4T 1c6:-79 ,010 F o 'mooSffc •o h1 00 v :; / N 1 eo co4P O rmrm 15 ,pl� m � - el \ yd G�o� 86 0 I •� 6A. NI 0 m 0-m IO6.73 W Z p 0 `• /t 4 P ;gu), 14 0$P� &a-0 . ,�. 14/ 0 40� ' °' I • Tj�654 `�� " . U R•r6.i2 ,gu90 �-� l 2- (d 5 O wi , ~ OD t ��6 4 2.a % >z-z; 13 ?901 aJ n g7 32 (\ 5 ..,.. � R'5• 5 w c %. eb.o3 5.5 0 3 � ,47 s .7.: `.g?, '' 3�1°1•°' a , 'm ee 09 3 78 6 3•03 `225 �,�� \go p t-- 8 s 4 �r o\20m r:a 11 y SY ''�6°5 1 1�AO .�.c.2e.0 ti ,,,,se,_jel.5i,v : N' 5i F 10 �m �ze5- -'� 01 n�i =. �� S� 4tr"s - 7 ' ' tv? 43 vs 6o _ \ c7. 'Z77' • • I (o 0 5 3 79.8/ =27• 3 1n8.0 `- 6 2% 0 m 6�4ZzctaN .,:. ,_'` w� -i s 45.z2 V6, -r�s ''e 7 °° vs; v e 3a90 40(6p `r- N • t\ 57.05 a ' -363a 10 :'-.;_ °Hu N 1 n T R. C n •-3< '*' d,: ode °s e 9 � -01CO,u. i� I I2 13 14 0 15 v 16 t tiiLl."‘,,`'-„'AXt'° O i '13�/.a�'� ;'L` �' .. p(o ti f1 ��d Q� Oh � 3�° �2s � TR:G / .,.(„.S �9 3�0ISIq0 6,11� a3o,3 y4a ' l016i° i! �00 Ss0. a 22e0N • 'I .(c 0 °I 0 D 0 i U H Ccrv1M0iJ Ort*ii 5 ,. �, ' '51,,0 </B9-oa-aow 57.98CP� 1.189-00-26, • .320 9� (P.) u /Z5.0/ 69.44 GAZ/ 63.0 . 1 Co!" /a� 3 5��� p3.22 "/ 'O 36 GO bO 60 60 60 �� . Coo 67 \I �� .,4•5 W 75 1 r 16 N 15 , 0 14 TR. 13 12 11 10 9 . , 8 m ° 1,7r tu �� 2�3. N 5 t �., ;4 d) r ' Ul N A _ ' ,\sj (AN'A U G 4 Rt IZ t� g ki t K' - o 1 0 ofl 4 0 D \\ a 4 1 a`Vff • p.,Jeo 3 v % B�50 8 t?,v0 .gyp .1V3° 11 1�,IO \21100 -> ° i 00 8 ,i1!e ,F :0?, '00 0co 01 6v.o vo 38 6a (oo t ,,oNI Coo 60 60 . 3" 5¢,.37 O° e 0 IR 2-. et. to4.4 N ti169-o0=Z6W Q 1 `� 50, . 95 ( oD: 8t... .. 45 --�3216- N GFJ O SW•,. -314TF PL: q 79.z5 r' • ' 2 ' c 11` t5o� � ro�•9I 31• 39 65� III:83 15 • 83.46 � 54.54 Z.o } 84. bo W 64.88 1�b �1 30 o .oI L 1 91, O u, 320 - 3 _ 36' 37Z03 . t' b ?h 'e . 34' Q� 1) 2,„ a fit- . � r ���� 29 � J 30. e' ��` I� rnb n'h .lo�� n�rr�.� ��i' �5 � �_�7� _ �n�j .` tr1 �J �n :nE City of Federal Way Statistical Report 9/5/2003 Time of Day Vs Type of Collision Report Period: 01/01/1999 to 12/31/2002 Location: SW 312 ST between SR 509 and 1 AV S Type of Collision Time Right Side- Rear Head Fixed Appr. Ped. Back- All Hourly Of Day Angle Swipe End On Object Turn Bike ing Others Totals Mid - 12:59 1 1 1:00 - 1:59 0 2:00 - 2:59 0 3:00 - 3:59 1 1 4:00 - 4:59 0 5:00 - 5:59 0 6:00 - 6:59 2 1 3 7:00 - 7:59 3 1 4 8:00 - 8:59 1 1 9:00 - 9:59 1 1 1 3 10:00 - 10:59 1 1 11:00 - 11:59 1 1 Noon- 12:59 1 1 1 1 4 13:00 - 13:59 1 1 1 3 14:00 - 14:59 2 2 15:00 - 15:59 1 6 2 9 16:00 - 16:59 1 5 3 1 2 12 17:00 - 17:59 3 5 1 9 18:00 - 18:59 8 2 1 11 19:00 - 19:59 2 2 20:00 - 20:59 1 1 1 3 21:00 - 21:59 1 1 22:00 - 22:59 1 1 23:00 - 23:59 1 1 Totals: 10 3 40 1 9 3 0 6 1 73 Percentages: 13.70 4.11 54.79 1.37 12.33 4.11 0.00 8.22 1.37 100.00 City of Federal Way Corridor Report 9/5/2003 Report Period: 01/01/1999 to 12/31/2002 Corridor: SW 312 ST between SR 509 and 1 AV S SR 509 at SW 312 ST Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-3/30/1999 06:37 AM 9904036 Rear End E->W E->W P H 2 Fri-11/19/1999 10:06 PM 9915218 Rear End E->W E->W P 4 Yearly Totals: Number of Collisions 2 Totals: 0 0 2 1 6 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-2/2/2000 07:00 AM 0001518 Right Angle N->S W->E P 2 Mon-10/9/2000 03:09 PM 0014153 Right Angle S->E W->S P 3 Yearly Totals: Number of Collisions 2 Totals: 0 0 2 0 5 Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Mon-7/2/2001 06:11 AM 0019405 Rear End S->N S->N P 2 Sat-7/28/2001 09:24 PM 0110672 Sideswipe N->S N->S P H 2 Sun-12/23/2001 09:24 AM 0117676 Right Angle S->N E->W P 2 Yearly Totals: Number of Collisions 3 Totals: 0 0 3 1 6 Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2_ Fat Inj PDO Run Veh Mon-1/7/2002 04:31 PM 0200339 Sideswipe S->E S->N 1 1 Sat-3/30/2002 11:15 PM 0204360 Rear End E->W E->W P 2 Tue-5/28/2002 06:51 PM 0207407 Rear End N->S N->S 1 2 Yearly Totals: Number of Collisions 3 Totals: 0 2 1 0 5 Link Totals: Number of Collisions: 10 Totals: 0 2 8 2 22 SW 312 ST, 125 ft. E of SR 509 Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Page 1 Thu-10/31/2002 06:40 PM 02 ) Rear End E->W ->W P Yearly Totals: Number of Collisions 1 i'otals: 0 0 1 0 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 2,000 ft. E of SR 509 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Mon-1/10/2000 08:15 PM 0000455 Backing E->W P Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 100 ft. E of SR 509 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-7/13/2000 04:49 PM 0009789 Backing W->E P Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 150 ft. E of SR 509 Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Sun-7/4/1999 02:20 PM 9908560 Rear End E->W E->W P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-5/25/2000 12:35 PM 0007275 Approach Turn W->N E->W P 1 Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: 2 Totals: 0 0 2 0 SW 312 ST,30,000 ft. E of SR 509 Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-10/27/1999 06:40 PM 9914076 Rear End E->W E->W P Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST,300 ft. E of SR 509 Page 2 Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-10/27/1999 07:15 PM 9914086 Rear End E->W E->W P H Yearly Totals:Number of Collisions 1 Totals: 0 0 1 1 Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-5/31/2001 06:51 PM 0107774 Rear End E->W 2 Yearly Totals:Number of Collisions 1 Totals: 0 2 0 0 Link Totals: Number of Collisions: 2 Totals: 0 2 1 1 SW 312 ST, 50,000 ft. W of 14 AV SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-9/29/1999 03:20 PM 9912657 Rear End E->W E->W P Wed-9/29/1999 04:50 PM 9912660 Rear End E->W E->W P Yearly Totals:Number of Collisions 2 Totals: 0 0 2 0 Link Totals: Number of Collisions: 2 Totals: 0 0 2 0 SW 312 ST,370 ft. W of 14 AV SW Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-5/30/2001 08:00 AM 0107694 Rear End E->W P Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST,30,000 ft. W of 14 AV SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision _ Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-11/10/1999 03:39 PM 9914767 Rear End E->W E->W 1 i Yearly Totals: Number of Collisions 1 Totals: 0 1 0 0 Link Totals:Number of Collisions: 1 Totals: 0 1 0 0 SW 312 ST, 100 ft.W of 14 AV SW Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision _ Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-3/15/2001 03:13 PM 0103719 Backing E->W P H Yearly Totals: Number of Collisions 1 Totals: 0 0 1 1 Page 3 Link Totals: Number of Collisions: ils: 0 0 1 1 SW 312 ST, 75 ft.W of 14 AV SW Year: 2000 • Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-8/15/2000 06:09 PM 0011465 Fixed Object/Parked Vehicle E->W Prk P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST,30 ft. W of 14 AV SW Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-3/20/2001 03:15 PM 0103974 Backing E->W P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST,2,000 ft.W of 14 AV SW Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-10/24/2001 09:48 AM 0114595 Head On E->W W->E 2 Yearly Totals: Number of Collisions 1 Totals: 0 2 0 0 Link Totals: Number of Collisions: 1 Totals: 0 2 0 0 SW 312 ST, 15 ft. W of 14 AV SW Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-8/29/2001 04:54 PM 0112128 Fixed Object/Parked Vehicle W->E Prk P Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 1 ft. W of 14 AV SW Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat k PDO Run Veh Wed-4/12/2000 03:45 PM 99999999 Rear End E->W E->W Yearly Totals: Number of Collisions 1 Totals: 0 0 0 0 Link Totals:Number of Collisions: 1 Totals: 0 0 0 0 14 AV SW at SW 312 ST Page 4 Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-6/8/1999 05:17 PM 9907355 Rear End E->W E->W 1 2 Yearly Totals: Number of Collisions 1 Totals: 0 1 0 0 2 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-5/18/2000 06:19 PM 0006942 Other E->W B 1 2 Tue-9/19/2000 07:50 AM 0013164 Right Angle W->E N->S 1 H 1 Yearly Totals:Number of Collisions 2 Totals: 0 2 0 1 3 Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Sat-7/21/2001 03:10 PM C32001 Rear End E->W E->W P 2 Mon-10/29/2001 07:30 AM 0114828 Backing W->E P 3 Wed-11/7/2001 12:58 PM 0115298 Right Angle S->W W->E 1 2 Sat-12/1/2001 12:56 AM 1016507 Rear End E->W E->W P 2 Yearly Totals: Number of Collisions 4 Totals: 0 1 3 0 9 Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-1/10/2002 05:45 PM 0200523 Rear End E->W Prk P 3 Wed-6/5/2002 06:03 PM 027782 Rear End E->W E->W 1 3 Mon-9/16/2002 05:50 PM 0212769 Rear End W->E B 1 2 Sat-11/16/2002 06:25 PM 0215799 Fixed Object/Parked Vehicle S->W P 1 Yearly Totals: Number of Collisions 4 Totals: 0 2 2 0 9 Link Totals: Number of Collisions: 11 Totals: 0 6 5 1 23 SW 312 ST, 100 ft. E of 14 AV SW Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat I4 PDO Run Veh Wed-9/13/2000 11:45 AM 0012910 Rear End _ E->W E->W P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 7,500 ft. W of 12 AV SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat lnj PDO Run Veh Sat-9/18/1999 06:20 AM 9912150 Fixed Object/Parked Vehicle E->W P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 Page 5 SW 312 ST, 75 ft.W of 10 PL SW Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-5/15/2002 04:03 PM 0209714 Rear End W->E W->E 1 Yearly Totals:Number of Collisions 1 Totals: 0 1 0 0 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 SW 312 ST,2,000 ft. W of 10 PL SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Sun-12/12/1999 03:20 AM 9916267 Fixed Object/Parked Vehicle E->W P H Yearly Totals:Number of Collisions 1 Totals: 0 0 1 1 Link Totals: Number of Collisions: 1 Totals: 0 0 1 1 SW 312 ST, 12,000 ft. E of 10 PL SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-9/16/1999 01:24 PM 9912064 Fixed Object/Parked Vehicle E->W 1 Yearly Totals: Number of Collisions 1 Totals: 0 1 0 0 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 10 AV SW at SW 312 ST Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Sat-7/24/1999 04:50 PM 9909502 Rear End W->E W->E P 2 Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 2 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision - Veh 1 Veh 2 Fat In j PDO Run Veh Fri-6/23/2000 04:12 PM 0008748 Fixed Object/Parked Vehicle W->E Prk 1 2 Yearly Totals: Number of Collisions 1 Totals: 0 1 0 0 2 Link Totals: Number of Collisions: 2 Totals: 0 1 1 0 4 SW 312 ST, 90 ft.W of 8 AV SW Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-5/2/2000 06:15 PM 0006124 Rear End E->W E->W 1 Page 6 Yearly Totals: Number of Collisions 'otals: 0 1 0 0 Link Totals:Number of Collisions: 1 Totals: 0 1 0 0 SW 312 ST,25 ft.W of 8 AV SW Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Fri-3/15/2002 10:30 AM 0203573 Rear End E->W Prk 1 Yearly Totals:Number of Collisions 1 Totals: 0 1 0 0 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 8 AV SW at SW 312 ST Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-5/25/1999 08:32 PM 9906657 Rear End E->W E->W P 2 Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 2 Year: 2000 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh 1 Fri-3/10/2000 04:35 PM 0003398 Approach Turn W->N E->W P 2 Fri-6/23/2000 08:03 PM 0008959 Right Angle N->E W->E P 2 Tue-7/18/2000 05:56 PM 0010039 Rear End E->W E->W 1 2 Sun-11/26/2000 04:04 PM 0016484 Fixed Object/Parked Vehicle W->E Prk P 2 Yearly Totals: Number of Collisions 4 Totals: 0 1 3 0 8 Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh L Tue-8/7/2001 04:38 PM 0111098 Backing W->E B P 2 Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 2 Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Mon-7/8/2002 01:48 PM 029384 Approach Turn W->E N->W P 2 Mon-10/7/2002 06:40 PM 0213833 Rear End W->E W->E P 2 Mon-10/14/2002 05:25 PM 0214193 Right Angle E->W S->N 1 1 Wed-1 1/6/2002 06:44 PM 0215315 Rear End W->E W->E P 2 Yearly Totals: Number of Collisions 4 Totals: 0 1 3 0 7 Link Totals:Number of Collisions: 10 Totals: 0 2 8 0 19 SW 312 ST,3 ft. E of 8 AV SW Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inii PDO Run Veh Page 7 Wed-9/25/2002 05:47 PM 021 Rear End E->W >W P i Yearly Totals: Number of Collisions 1 .otals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 50 ft. E of 8 AV SW Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Wed-3/6/2002 07:28 PM 0203208 Rear End E->W Prk 1 Yearly Totals:Number of Collisions 1 Totals: 0 1 0 0 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 4 AV SW at SW 312 ST Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-7/10/2001 12:22 PM 0019804 Sideswipe E->W E->W P 2 I Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 2 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 2 2 AV SW at SW 312 ST Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-4/16/2002 04:30 PM 0205193 Rear End E->W Prk 1 2 Yearly Totals:Number of Collisions 1 Totals: 0 1 0 0 2 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 2 SW 312 ST, 5,000 ft. E of 2 AV SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision _ Veh 1 Veh 2 Fat Inj PDO Run Veh r Wed-12/1/1999 01:05 PM 9915700 Rear End E->W E->W P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST, 100 ft. E of 2 AV SW Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Ind PDO Run Veh Tue-6/29/1999 03:05 PM 9908308 Rear End E->W E->W P Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 Page 8 Link Totals: Number of Collisions: ils: 0 0 1 0 SW 312 ST, 025000 ft. W of 1 AV S Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Mon-4/12/1999 04:14 PM 9904661 Rear End W->E W->E P H Yearly Totals:Number of Collisions 1 Totals: 0 0 1 1 Link Totals: Number of Collisions: 1 Totals: 0 0 1 1 SW 312 ST, 100 ft. W of 1 AV S Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-I1/15/2001 05:15 PM 0115769 Fixed Object/Parked Vehicle W->E Prk 1 Fri-12/14/2001 05:35 PM 0117180 Right Angle N->E E->W P Yearly Totals: Number of Collisions 2 Totals: 0 1 1 0 Link Totals:Number of Collisions: 2 Totals: 0 1 1 0 SW 312 ST, 9,000 ft. W of 1 AV S Year: 1999 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-10/28/1999 07:21 AM 9914106 Right Angle N->E E->W P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST,50 ft. W of 1 AV S Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Sat-2/9/2002 03:12 PM 0202025 Rear End W->E W->E P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals:Number of Collisions: 1 Totals: 0 0 1 0 SW 312 ST,30 ft.W of 1 AV S Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Sun-12/9/2001 02:42 PM 0116903 Rear End W->E W->E P Yearly Totals: Number of Collisions 1 Totals: 0 0 1 0 Link Totals: Number of Collisions: l Totals: 0 0 1 0 Page 9 SW 312 ST,20 ft. W of 1 AV S Year: 2001 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Thu-3/22/2001 05:47 PM 0104093 Right Angle E->W N->S 1 Yearly Totals: Number of Collisions 1 Totals: 0 1 0 0 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 SW 312 ST, 1 ft. W of 1 AV S Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Tue-11/19/2002 09:40 AM 0215925 Rear End W->E 1 Yearly Totals: Number of Collisions 1 Totals: 0 1 0 0 Link Totals: Number of Collisions: 1 Totals: 0 1 0 0 1 AV S at SW 312 ST Year: 2002 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh Fri-9/20/2002 12:25 PM 0212995 Rear End W->E B P 2 Yearly Totals:Number of Collisions 1 Totals: 0 0 1 0 2 Link Totals: Number of Collisions: 1 Totals: 0 0 1 0 2 Totals for Corridor: Number of Collisions: 73 Total Vehicles Involved: 74 Number of Fatalities: 0 (0.00%) Number of Injuries: 24/25 32.88%) Number of PDOs: 49 (67.12% Page 10