Loading...
23-101492City nf Feder.al Way CoJllJnunity Development Dept. 3332S Sch Ave S Federal Way, WA 98003 Ph: (253) 835·2607 Fax: (253) 835-2609 Project Name: MAHAR Fl E Electrical Permit #:23-101492-00-EL Inspection Request Line: (253) 835-3050 Project Address: 135 S 308TH ST Parcel Number: 339210 0330 Project Description: Altered circuit for furnace replacement Owner Applicant Contractor ADRIAN MAHAR JENNIFER MASTERSA A A HF.A TING & A A A HEATING/REFRIGERATION INC 135 S 308TH ST AIR CONDITIONING (ELECTRICAL) FEDERAL WAY WA 22641 83RD AVES AAAHEHR975M2 (8/11/23) 98003 K F.NT WA 98032 22641 83RD A VE S KENT WA 98032 Additional Permit Information ls this an Online or 0.T.C. application?.-............... Yes Circuits -Residential Electr:ical Fixtures Thennostat PERMIT EXPIRES Tuesday, 19 September, 2023 Permit Issued on Thursday, March 23, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of · Washington and the City of Federal Way. Owner or agent: 0 NL 11\11= Date: __ ("'; fYN} <STY o• Fe deral Way .S CARD IS TO RE:\U.l:.'\ O~-SITE . ~ ... );tr u ction Inspection Record I:'-SPECTIO:'-REQl"'ES T S: (253) 835-3050 Scheduled inspections may be failed if this card is not on-site. DO ~OT LOSE TIDS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bonom). Please sdiedule inspectiollS as appropriate Wort must not be co\·ered until it is appro\·ed. Check with your inspector if you are unsure about any of the inspections or the ilb-pection sequence. On-going inspections are logged on the back of this card. ELECTRICAL [!] UF:ER Groand (4295) [ii Ditch co,·er {4030) IT] Slab/Concrete Floor (4255) App(cn.-ed Appro"-ed Approved to place concrete By Date By Date By Date 0 Poo1Bondiug(4l95) [I] Temporary Power (4275) 0 Senice (4235) Appro\-ed Appro\-ed Approved By Date By Date By Date [1] F~ders/Sub-panels (4045) [fil Rough Electrical (4225) III Ceiling Conr (4020) Approvt<I Appro,-ed Approved By Date By Date By Date fill Final -Elect&ical (4055) ro\·ed By MECHANICAL GJ Mechanical Rough-in (4165) IL] Gas PipiDg (4125) [II -Final -l\lechaniral (4065) Apptovl!d Appto\'ed to meue t~ Approved B~-Date By Date By Date PLUMBING [iJ Plumbing Groandwork (4190) [II Rough Plumbing (4230) [II Final -Plumbing {407S) Appn>\"M to co,-er Approwd Approved By Date By Date By Date