Community Development Dept. Permit #:21-104975-00-CO
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: EDWARDJONES
Project Address: 720 S 320TH ST Parcel Number: 082104 9266
Project Description: BLUEBEAM - All work is nonstructural interior in an existing tenant space. Work includes
.demo of 54 If interior wall, install 57 If new interior wall to bottom of existing ceiling grid,
rework of some ceiling grid, add ADA compliant doors/hardware, paint, carpet and add 3
return air grills to an existing HVAC system. Fire alarm modification's and electrical permits
and work by others.
Owner Alicant Contractor Lender
WANG BROTHERS INVESTMENTS KIRK FIGENSHOWLINN- LINN-DOUGLAS CONSTRUCTION OWNER IS LENDER
600 108TH AVE NE UNIT 340 DOUGLAS CONSTRUCTION LLC LLC
BELLEVUE WA 98004 PO BOX 8019 PO BOX 8019
COVINGTON WA 9803 COVINGTON WA 98042
I
Census Category: 437 - Commercial alt / add / conversion
Includes: # 1
#2
_F_
#3
#4
OssuanaLlass: B
ConstrEjj2a RE_ Type V - B
_IX
Occupancy Load: 8.00
Floor Area (sq. ft.) 5760
Occupancy # I -Area (Sq. Feet)-, ........ ...... ____
781
Occupancy #1 - Construction Type ..... ...
Type V -B
Mechanical to be Included? ................. ...................
Yes
Plumbing Work Valuation?..... ......... .......1....
0
Mechanical Work
3000
Number of Stories ...................................................
I
Is this an Online or O.T.C. application? ..................
No
Permit for Building Shell Only?__ ..... ____ .........
No
Plumbing to be Included? ...............
No
Occupancy #I - Use ................................................ <Professional
Services/Offices
Comprehensive Plan Designation-- 11-I.- ...... "
Professional Office
Zoning
PO
Total Valuation: 59,223.58
3
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the us th the lws, rules and go reulations•f the State of
Owner or agent: P" aof Federal Way. Date:
1
PERMIT : 2110497500
Address:
720 S 320TH ST Unit
Project: WANG BROTHERS
INVESTMENTSA
3
Scheduled inspections may be failed if this card is not on -site.
DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule
inspections
as appropriate. Work must not be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the
inspection sequence. On -going inspections are logged on the back of this card.
Footings/Setback (110)
F11Re-steel
(4215)
Slab/Concrete Floor (4255)
Approved to place concrete
Approved
to place concrete or grout
Approved to place concrete
By
Date
By
ate
By Date
4
Underfloor Framing (285)
Floor Sheathing (4105)
MechanicalRough-in (4165)
Approved to sheath floor
Approved to install flooring
Approved
By
Date
By
Date
By Date
7
Gas Piping (4125)
Fire! raft Stops (4095)
Prior to scheduling a Framing inspection;
g g P
Approved to release test
Approved
Electrical, Plumbing &Mechanical Rough -in
and Fire/DraftStop inspections must be signed- i
By
Date
By
Date
off and approved. IBC 109.3.4
9
Framing (120)
10
Insulation (150)
17 Gypsum Wallboard Nailing (130)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
By
62 Date
By
Date
By Date
l
Suspended Ceiling Grid (4265)
Final - S K F & R (4060)
14 Final - Mechanical (4065)
Approved to drop tile
Approved
Approved
By
Date
By
Date
By Date
t s
Final - Building (050)
Approved
Ct
By
ate
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
y
Date
B y
Date
By
Date