Loading...
20-101813 - PERMIT FINALCity of Federal way y• .� Community Development Dept. Permit • SF 33325 8th Ave 8 Federal Way, WA 99003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 1 Project Name:-STEFOGIO Project Address: 2811 SW 302ND PL Parcel Number: 416660 0441 Project Description: BLUEBEAM - Construction of a 3060 square foot, 3-story single family residence with a 23 square foot covered entry, 825 square feet of decks and 186 square foot unheated storage, and indoor swimming pool. Includes plumbing & mechanical. ***3 Bedrooms; $895000 Estimated Selling Price*** Owner A -Cant Contractor Lender VIKTOR STEFOGIO COLIN MILLERAXIOM DESIGN AXIOM DESIGN BUILD OWNER IS LENDER 2811 302ND PL S BUILD 5424 BALLARD AVE NW SUITE 20,' FEDERAL WAY WA >424 BALLARD AVE NW SUITE 2G SEATTLE WA 98107 USA SEATTLE WA 98107 Census Category: 101 - New Single Family House Includes: #1 #2 #3 #4 OccuEanSX Class. R-3 Construction TV e: Tye V - B Occupancy Load: Floor Area (sq. ft.) 3,869.00 New / Additional Sq. Feet - 1st Floor 780 New / Additional Sq. Feet - 2nd Floor. .. ............ 1101 New / Additional Sq. Feet - 3rd Floor,,__. .......... 1179 Occupancy #1 - Area (Sq. Feet) ......„., ....._1...,. 3869 New / Additional Sq. Feet - Basement ................ 809 Basic Plan?............................... ......... ......... No Occupancy #1 - Construction Type..., Type V - B New / Additional Sq. Feet - Deck ........................... 825 New / Additional Sq. Feet - Garage.,,,,,.,., .... I— ...... 186 Mechanical to be Included? ....... . ......... . .........., Yes Plumbing Work Valuation?.. 63000 Mechanical Work Valuation?.. 48000 Number of Stories., ,.,. ,,.,„ » 3 New / Additional Sq. Feet - Other ......... ............ 23 Plumbing to be Included?,...-.,.-, .... . ...... ............ Yes New / Additional Sq, Feet - Total....,,.,. .,,., ,,,.:,. 4903 Will Certificate of Occupancy be Issued? ............... Yes Occupancy #1 - Use... , ..,. ,. ». . „ ..,,„, Residence (1 or family) Comprehensive flan Designation,,..„, SF - High -Density Zoning Designation.d. RS 7.2 Residential Total Valuation: 494,554.96 Mechanical Fixtures Air Handling Units 2 Boilers 1 Fans Plumbing Fixtures Bathtubs 2 Dishwashers 1 Drains 4 Laundry Washer Outlets 1 Lavatories 4 Other Plumbing Fixtures 1 Showers 3 Sinks 3 Water Closets 4 Water Heaters 2 Hose Bibbs 2 No framing inspection until an approved fire sprinkler system is permitted, installed and inspected. A separate permit is required for the automatic fire sprinkler system. PERMIT EXPIRES Sunday, 31 October, 2021 Permit Issued on Thursday, October 1, 2020 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the"State of Washington and the City of Federal Way. Owner or agent: 4VO&iD a t e: 2 City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section III of the International Building Code or Section 11110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by Cityqaff. Tenant Name: STEFOGIO Permit # 20-101813-00-SF Address: 2811 SW 302ND PL Includes: # 1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 3,869.00 Owner Name: VIKTOR STEFOGIO Owner Address: 2811302NDPLS FEDERAL WAY WA USA r. Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner! occupant or to any otherperson that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and lor occupant of the premises. J) I I I Isfa Q Blvd I ruil a Kau PERMIT #: 2010181300 Address: 2811 SW 302ND PL Project: VIKTOR STEFOGIO FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) 2 Initial Erosion Control (4365) Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date El Foundation all (4115) El Drainage/Downspout (4040) El Plumbing Groundwork (4190) Approved to place concrete Approved to backfill Approved to cover By Date By A i Date By Date El Slab/Concrete Floor (4255) Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date BY Date By Date Shear Walls (4245) 11 Roof Sheathing (4220) Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved BY Date By Date By Date Mechanical Rough -in (4165)- Gas Piping (4125) Fire raft Stops (4095) Approved Approved to release test Approved By Date By Date By Date Interim Erosion Control (4370) Prior to scheduling a Framing in8pedi Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in 7: E Approved to insulate and Fire/Draft Stop inspections must signed- c Sig., By Date o . and off and approved. IBC 109.3.4 By Date Insulation (4150) Gypsum Wallboard Nailing (4130) Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved By Date By Date By Date E] Final - Mechanical (4065) 22 Final - Plumbing (4075) El Final - Building (4050) Approved Approved Approved By Date -7 By Dat By Date /-", e (J E] Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date