Loading...
20-101872--TIR Report-2-17-2021-V1AP CONSULTING ENGINEERS PLL4 CIVIL ENGINEERING FEBRUARY 12,2021 d'i kwim PREPARED FOR: KARNAFEL RESIDENCE PARCEL #6143600450 FEDERAL WAY, WA I hereby state that these Drainage Calculations have been prepared by me or under my supervision and meet the standard of care and expertise which is tisual and customary in the community for professional engineers. I understand that City of Federal Way does not and will not assume liability or the sufficiency, suitability, or performance of drainage facilities prepared by me. 91MEMOM TABLE OF CONTENTS PAGE 1.0 PROJECT OVERVIEW 1 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 3 3.0 OFF -SITE ANALYSIS 5 4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN 5 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN 8 6.0 SPECIAL REPORTS AND STUDIES 9 7.0 OTHER PERMITS 9 8.0 ESC ANALYSIS AND DESIGN 9 9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT 9 10.0 OPERATIONS AND MAINTENANCE MANUAL 9 TABLE OF APPENDICES APPENDIX SOIL INFORMATION A DRAINAGE PLAN B EROSION AND SEDIMENT CONTROL PLAN C OPERATIONS AND MAINTENANCE MANUAL D DRAINAGE CALCULATION E SPECIAL REPORTS F KARNAFEL RESIDENCE TECHNICAL INFORMATION REPORT 1.0 PROJECT OVERVIEW This report accompanies the drainage review plan prepared for the Karnafel Residence project on parcel 6143600450 in City of Federal Way, Washington. The site location is shown in Figure 1, below. The project has been designed to meet the requirements of the 2016 King 1 Countv Surface Water Design Manual (KCSWDM). FIGURE 1 - Vicinity Map The existing site is approximately 1.14-acres. It has an existing shared driveway and the remaining area is in a forested condition. The neighboring parcels are also single-family residential lots. Historic land cover characteristics are provided below in Table 1. One wetland was found and delineated on this lot in the previous application for the Pierson Driveway as described in according to the Technical Information Report prepared by Edward McCarthy, P.E., dated January 31, 2013. The property slopes toward the east edge of the property based on topographic information provided Axis Survey & Mapping on a survey, dated November 16, 2020. 11 Pa g e TABLE 1 — PREDEVELOPED AREAS Area I Total Description I (ft2) I (ft2) Public Road 3,041 3,041 —Impervious Pervious Forest 9,225 9,225 Total � 12,266 The developed site will consist of a new single-family residence, a new sidewalk, a new driveway, and the required frontage improvements along South 334th Street. The developed areas are tallied below in Table 2. The developed sub -basin map is included in Appendix E. The soils present on the project site are identified as being underlain by Alderwood gravelly sandy loam (AgB) soils in the geotechnical report provided by GeoResources LLC, dated February 1, 2021. The project area is also divided into two threshold discharge areas. The developed areas draining to these threshold discharge areas are described below. The northern threshold discharge area will consist of the frontage improvements which have an estimated area of 460 square feet of impervious surfaces, and a landscaped area of aproximately 861 square feet. The developed land cover characteristics are tallied below in Table 2. Impervious Sidewalk Drivewai Pervious Area (ft2) Total (ft2) 366 460 94 861 861 1,321 The southern threshold discharge area will consist of the new single-family residence, which has an estimated roof area of 3,916 square feet, a 75 square -foot sidewalk, and a 1,146 square -foot driveway, and a landscaped area of aproximately 2,767 square feet. The developed land cover characteristics are tallied below in Table 3. 21 Page TABLE 3 - SOUTHERN THRESHOLD DISCHARGE AREA - DEVELOPED AREAS Description Area (ft2) Total (ft2) Roof Area 3,916 Impervious Driveway 1,146 5,137 Sidewalk 75 Pervious Landscaping 2,767 2,767 7,904 2.0 CONDITIONS AND REQUIREMENTS SUMMARY Within the limits of construction, the predeveloped project site is assumed to have consisted of 9,225 square feet of forest. The developed site will contain 5,597 square feet of new impervious surfaces for the new structures and driveways. The developed site will also contain 3,628 square feet of landscaping area. There are two threshold discharge areas found within this site. Since the project proposes 2,000 square feet of new impervious surface, does not qualify for Simplified Drainage Review, and is not subject to Large Project Drainage Review, Directed Drainage Review will be required for this project. This report will show how the project complies with Core Requirements 1 through 9 and Special Requirements 1 through 5, as follows: Core Requirement #1: Discharge at Natural Location Under existing conditions, stormwater runoff from the project site is naturally dispersed toward the east edge of the property. According to the Technical Information Report prepared by Edward McCarthy, P.E., dated January 31, 2013, the property contains two threshold discharge areas. A wetland on the northern portion of the property collects on -site runoff and flows to the north and discharges to a public closed storm system that continues to flow to the north, discharging to North Lake within 700 feet from the site. An on -site wetland on the southern portion of the property drains through off -site forested properties to the south. Adjacent properties to the west contribute minor sheet flow runoff to the site but no stormwater structures were identified on the property. Runoff from the east is largely collected in the stormwater system for North Lake Ridge development and conveyed around the project site. Core Requirement #2: Off -site Anal The off -site system analysis is included in Section 3.0 of this report. Core Requirement #3: Flow Control Stormwater runoff from the developed site will not increase the 100-year peak flow rate by more than 0.15 cfs over the predeveloped, 100-year peak flow rate and, therefore flow control will not be required for this project. Core Requirement #4: Conveyance System The conveyance system for this project includes pipes on the property that convey the stormwater to the rock pad. They are sized appropriately to handle the stormwater that is anticipated. Core Requirement #5: Erosion and Sediment Control Erosion and sediment control requirements will be met for this project as described in Section 8.0. Core Requirement #6: Maintenance and Operations The conveyance system, splashblock, and dispersion trench will be maintained privately by the property owner. Operations and Maintenance guidance is addressed in Section 10.0. Core Requirement #7: Financial Guarantees and Liability Financial guarantees are not expected to be required by the City of Federal Way. Core Requirement #8: Water Quality The project will be exempt from the requirement to provide water quality treatment because less than 5,000 square feet of new or replaced pollution -generating impervious surface (PGIS) is proposed. Core Requirement #9: Flow Control BMPs This project will be constructed on a lot that greater than 22,000 square feet but less than 5 acres in size and inside the Urban Growth Area and will, therefore, be subject to Large Lot BMP Requirements, as discussed in Section 1.2.9.2.2 of the 2016 KCSWDM. This project will implement the BMPs found in the list in Section 1.2.9.2.2. Special Requirement #1: Other Adopted Area -Specific Requirements There are no known area -specific special requirements that apply to this project site. 4 1 P a g e Special Requirement #2: Flood Hazard Area Delineations There are no known flood hazard areas on or adjacent to this project. Special Requirement #3: Flood Protection Facilities Flood protection facility special requirements do not apply to this project. The project does not propose to construct a new or modify an existing flood protection facility. Special Requirement #4: Source Controls Since the proposed project is a single-family residence, source control measures are not expected to be required in conjunction with this project. There is no proposed outside - use or storage of significant quantities of pollutants. Special Requirement #5: Oil Control The proposed project does not require oil control measurements. The site is not considered high -use since it is a single family residence. 3.0 OFF -SITE ANALYSIS Downstream Basin of Threshold Discharge Area: A Level 1 downstream analysis was completed by Edward McCarthy, P.E., that is dated January 31, 2013. The same downstream analysis is applied in this project and included in Appendix F. In summary, runoff leaves the north basin through a conveyance connected in a public closed storm system and it flows north, to an open channel and ultimately discharges to North Lake approximately 740 feet from the site. Runoff leaves the south basin in an open channel and it enters to the large forest wetland. At about 1,500 feet from the site, it enters a public closed storm system. Upstream Tributary Basin: There are no known concentrated sources of stormwater discharge to this property. 4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Flow Control A WWHM analysis of the historic and developed surfaces has been completed and included with this report. This analysis shows that the 15-minute, 100-year peak flow 5 1 Pegs rate under historic conditions (forest on type C soils) from the areas that will be disturbed by this project will not be surpassed by the 100-year peak flow rate under developed conditions by more than 0.15 cfs. This project is, therefore, exempt from providing flow control facilities. Credits from Table 1.2.9.A of the KCSWDM were applied to the analysis. The runoff from all of the project areas will be modeled in two separate threshold discharge areas (TDA). The northern TDA includes all the frontage improvements. The southern TDA includes the roof area, driveway, sidewalk, and the landscaping area around the house. The runoff from southern TDA areas will be collected in a system of catch basin before it discharges to the proposed rock pad located to the east of the shared driveway. The model inputs for these TDAs are summarized below. Under developed conditions, in the northern TDA, the portion of the property that will be disturbed for construction will be covered by 366 square feet of sidewalk (0.008 acres, modeled as impervious, flat), 94 square feet of driveway (0.002 acres, modeled as impervious, flat), and 861 square feet of lawn and landscaping (0.020 acres, modeled as lawn on type C soils, moderate slope). The public road is not new or replaced, but because of existing topography, it will discharge to the same existing catch basin that it did before the development. In the southern TDA, the portion of the property that will be disturbed for construction will be covered by 3,916 square feet of roof (0.090 acres, modeled as impervious, flat), 75 square feet of sidewalk (0.002 acres, modeled as impervious, flat),1,146 square feet of driveway (0.026 acres, modeled as impervious, flat), and 2,767 square feet of lawn and landscaping (0.064 acres, modeled as lawn on type C soils, moderate slope). The table below summarizes the inputs to the WWHM model for this project. Developed Modeled as Impervious Lawn Pasture Forest Sidewalk 0.008 acres 0.008acres 0.000 acres 0.000 acres 0.000 acres Driveway 0.002 acres 0.002 acres 0.000 acres 0.000 acres 0.000 acres Landscaping 0.020 acres 0.000 acres 0.020 acres 0.000 acres 0.000 acres Totals 0.030 acres 0.010 acres 0.020acres 0.000 acres 0.000 acres The results of the analysis of the northern threshold discharge area indicates a 15- minute,100-year peak flow of 0.003 cfs. This is less than a 0.15 cfs increase over the predeveloped 15-minute,100-year peak of 0.016 cfs. Therefore, this TDA will be exempt from providing flow control facilities. 6 1 P a WWHM MODEL SUMMARY SOUTHERN TDA) Developed Modeled as Impervious Lawn Pasture Forest Roof 0.090 acres 0.089 acres 0.001 acres 0.000 acres 0.000 acres Sidewalk 0.002 acres 0.002 acres 0.000 acres 0.000 acres 0.000 acres Driveway 0.026 acres 0.024 acres 0.002 acres 0.000 acres 0.000 acres Landscaping 0.064 acres 0.000 acres 0.064 acres 0.000 acres 0.000 acres Totals 0.182 acres 0.115 acres 0.067 acres 0.000 acres 0.000 acres The results of the analysis of the northern threshold discharge area indicates a 15- minute,100-year peak flow of 0.017 cfs. This is less than a 0.15 cfs increase over the predeveloped 15-minute,100-year peak of 0.113 cfs. Therefore, the northern threshold discharge area is exempt from providing additional flow control facilities. Section 1.2.9.2.2 of the KCSWDM requires that a project that must comply with Core Requirement #9 and which is on a lot that has a size greater than 22,000 square feet and less than 5 acres either demonstrate compliance with the LID Performance Standard or implement BMPs on the property in the order identified in the Large Lot BMPs list in Section 1.2.9.2.2. This project will implement BMPs from the list in Section 1.2.9.2.2. Mitigation of New and Replaced Impervious Surface: Full Dispersion: Full Dispersion BMPs are not feasible. There is no 100-foot long native vegetated flowpath available on this project site with slopes of less than 15%. Therefore, Full Dispersion BMPs are not feasible. Full and limited infiltration: It is infeasible to apply infiltration BMPs as detailed in Appendix C, Section C.2.2. of the 2016 KCSWDM. A stormwater feasibility evaluation for infiltration was provided in the geotechnical report provided by GeoResources LLC, dated February 1, 2021, and is included in Appendix A. The soil type determined by the GeoResources LLC for the stormwater management facility is loamy sand. A high groundwater was found on -site which was about 2 feet below the existing surface while 1 foot of cover over the facility and 1 foot of separation from groundwater is required for an infiltration facility. Therefore, it is not feasible to provide an infiltration facility that complies with Section C2.2 of the KCSWM. Bioretention: Bioretention BMPs are not feasible. The test pits investigated by GeoResources LLC indicate that the subsoils were silty loamy sand. It became dense and cemented at depths of about 3 to 4 feet below the surface. The groundwater elevation 71 was approximately 2 feet below the existing surface. For these reasons, Bioretention BMPs are not feasible per Section C.2.6 of the KCSWDM. Permeable Pavement: Permeable Pavement BMPs are not feasible. The test pits investigated by GeoResources LLC indicate that the subsoils were silty loamy sand. It became dense and cemented at depths of about 3 to 4 feet below the surface. The groundwater elevation was approximately 2 feet below the existing surface. For these reasons, Permeable Pavement BMPs are not feasible per Section C.2.6 of the KCSWDM. Basic Dispersion: Basic Dispersion BMPs are feasible. In the southern threshold discharge area, the new roof (700 square feet; 0.016 acres) will be mitigated in accordance with Section C.2.4.2 of the KCSWDM. The proposed driveway (776 square feet; 0.018 acres) will be mitigated by sheet flow dispersion in accordance with Section C.2.4.5 of the KCSWDM. According to Section 1.2.9.2.2 of the KCSWDM requires that BMPs must be implemented, at a minimum, to mitigate an impervious area equal to 50% of the impervious surface coverage when less than 45% of the site will be covered by impervious surface. The proposed site has a buildable area of 17,262 square feet. The total proposed impervious area is approximately 5,597 square feet and which equates to a coverage of about 32%. Therefore, 2799 square feet of the proposed impervious surface (50%) must be mitigated. The total proposed impervious area being mitigated by the proposed BMPs will be 1,476 square feet. The remaining area that is required to be mitigated,1,323 square feet, will be mitigated with the Native Growth Retention Credit. 4,631 square feet of native growth retention area will be set aside on -site incompliance with Section C.2.10 of the KCSWDM. The impervious area of the northern TDA cannot be collected and mitigated. It will be bypassed. Water Qual&i This project is exempt from providing water quality treatment because less than 5,000 square feet of PGIS is proposed as part of this project. 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN Conveyance pipes for this project will consist of 6-inch pipes to the rock pad. These pipes are adequately sized to handle the flows that are anticipated from this project. 81e 6.0 SPECIAL REPORTS AND STUDIES The geotechnical assessment prepared by GeoResources LLC, dated February 1, 2021 is included in Appendix A. The Technical Information Report prepared by Edward McCarthy, P.E., dated January 31, 2013 is included in Appendix F. 7.0 OTHER PERMITS Building, water and sewer permits for the proposed home will be required in conjunction with this project. 8.0 ESC ANALYSIS AND DESIGN Erosion and sediment control requirements will include the delineation of clearing limits via flagging, proper cover measures for the protection of disturbed areas, perimeter protection with silt fencing on an as -needed basis, and a stabilized construction entrance per the City of Federal Way standards. The Erosion and Sediment Control Plan has been included as part of the construction plans and is included in Appendix C. 9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT A bond is not expected to be required by the City for this single-family project. 10.0 OPERATIONS AND MAINTENANCE MANUAL The on -site dispersion systems and associated elements will be maintained privately by the property owner. The operations and maintenance guidelines for the private facilities are provided in the Operations and Maintenance Manual found in Appendix D. APPENDIX A: 11111111111111111 Mr. DmitriyKamafe| 136-24mStreet Southeast, Apt A Auburn, Washington 9O002 Drnitriy_2004@hotrnai|.corn (253)736-5256 February 1, 2021 StorrnvvoterFeosibi|hx Soils Report Proposed Single -Family Residence xxx-South 334thStreet Federal Way, Washington PN:6143600450 Doc ID: Karnafe|.53341hSL5R INTRODUCTION This stormwater soils report addresses the feasibility of the site soils to support infiltration of collected runoff from the proposed single-family residence to be constructed on the parcel referenced above. The site is located adjacent and north of3633 South 334!^ Street in Federal Way, Washington. The general location ofthe site is shown on the attached Site Location Map, Figure 1. Our understanding of the project is based on our conversations with you, our understanding of the City of Federal Way development codes, and our experience in the area. We understand that you propose to construct single-family residence at the site. We anticipate that the proposed construction will consist of 1 to 2 story wood -framed structures, founded on conventional shallow foundations. We understand that the site will be developed with typical underground residential utilities, concrete driveway, and landscaping areas. A copy of the proposed site plan isattached asFigure 2. We understand that the City of Federal Way uses the 2016 version of the King County Surface Water Design Manual (2016 K[SVVDk4)vvith addendum that requires the confirmation of subsurface conditions to address the feasibility of the onsi1e infiltration of storrnvvater runoff generated bythe proposed development. SCOPE The purpose of our services was to evaluate the surface and subsurface conditions across the site, as a basis for providing geotechnica| recommendations and design criteria for the proposed single-family residential development. Specifically, the scope of services included the 1. Reviewing the available geologic, hvdrogeo| ic,andgeotechnica|datafor1heske Karnafe|.B34thSt.Se February 1.2021 Page 2 2. Exploring subsurface conditions across the site by excavating 2 test pits at select locations onthe site; 3. Describing surface and subsurface conditions, including soil type, depth to groundwater, and anestimate ofseasonal high groundwater levels; 4. Providing our opinion about the feasibility of onsite infiltration, including a preliminary design infiltration rate based on grain size data per the 2016 King County Stormwater Design Manual, ifapplicable; 5. Preparing this written Stonnwoter Feasibility Soils Report summarizing our site observations and conclusions, and our geotechnical recommendations and design criteria' along with the supporting data. The above scope of work was completed in accordance with our Contracting Agreement dated January 12, 2021. We received written notification to proceed January 13, 2021. Surface Conditions The site consists of single tax parcel that is generally "L" shaped. The parcel measures approximately 100 to 290 feet wide (east to west) by about 100 to 310 feet deep (north to south) and encompasses about 1.14acres. The site bounded isbvsingle-family development tothe west, northwest, and south, bvundeveloped land and wetlands tothe east, and bvSouth 3]4 Ih Street to the northeast. Based on topographic information obtained from the Site Plan by Architects Northwest dated April 13, 2020 and generally confirmed during our site visit, the ground surface of the parcel is relatively flat at an elevation of about 410 feet. The existing site configuration is shown on the Site Vicinity Map, Figure3. The subject site is generally well vegetated with second growth forest with a moderate understnry ofsa|a|' ferns' and evergreen huckleberries. No evidence of soil erosion or movement was observed atthe time ofour site visit. Site Soils The Natural Resource Conservation Service (NR[S) Web Soil Survey maps the site as underlain bvA|denwood gravelly sandy loam (Ag8) soils. A|denwood soils are derived from are a glacial drift and/or glacial outwash over dense g|acinnnarine deposits' form on slopes of to 8 percent, have a^s|ighi"erosion hazard when exposed, and are included in hydrologic soils group B. Acopy ofthe NR[Ssoils map isincluded asFigure 4. Site Geology The Lidar-revisedgeologic map of the Poverty bay 75' quadrangle, King and Pierce Counties, Washington by R.W. Tabor, D.B. Booth, and K.G. Troost (2014) indicates that the site is underlain by ice -contact ((}vi)deposits. The ice -contact and advance outwashdeposits are glacially derived soils that were deposited during the Vashon S1ade of the Fraser Glaciation, approximately 12'000 to 15,000 years ago. Typically, the ice -contact deposits consist of poorly sorted, unstratified mixtures of silt, sand, gravel, cobbles, and boulders. The deposits are commonly encountered in a similar texture to recessional outwash soils but contain lenses of till. These glacial sediments were ManIkokold in"= Karnafel.S334thSt.SR February 1, 2021 Page 3 originally deposited through fluvial processes on or within the continental ice mass, then lost support and slumped as the ice receded, causing mixing of the material and disturbance of the stratification. The ice -contact deposits generally were not overridden by the continental ice mass and are considered normally consolidated. Infiltration feasibility is dependent on the gradation of the soils, and can be highly variably in ice contact deposits. An excerpt of the above reference geologic map is attached as Figure 5. Subsurface Explorations On January 19, 2021 we visited the site and monitored the excavation of two test pits to depths of approximately 4 feet below the existing ground surface in the upper, northern portion of the site. Our representative logged the subsurface conditions encountered in each test pit, and obtained representative soil samples. Our test pits were excavated by a small track -mounted excavator operated by you. The specific number, locations, and depths of our explorations were selected based on the configuration of the proposed development and were adjusted in the field based on consideration for underground utilities, existing site conditions, site access limitations, and encountered stratigraphy. Representative soil samples obtained from the test pits were placed in sealed plastic bags then taken to a laboratory for further examination and testing as deemed necessary. The test pits were then backfilled with the excavated soils and bucket tamped, but not otherwise compacted. The subsurface explorations excavated as part of this evaluation indicate the subsurface conditions at specific locations only, as actual subsurface conditions can vary across the site. Furthermore, the nature and extent of such variation would not become evident until additional explorations are performed or until construction activities have begun. The approximate locations and numbers of our test pits are shown on the attached Site & Exploration Plan, Figure 2. The soils encountered were visually classified in accordance with the Unified Soil Classification System (USCS) and ASTM D2488. The USCS is included in Appendix A as Figure A-1, while the descriptive logs of our test pits are included as Figure A-2 and A-3. Subsurface Conditions Our explorations encountered subsurface conditions that generally confirmed the mapped stratigraphy. Our test pits on site generally encountered about half a foot of topsoil/duff mantling about 3 feet of brown to black silty sand with gravel in a loose to medium dense, moist to wet condition. Underlying these surficial soils, we encountered grey with some mottling cemented silty sand with gravel in a dense to very dense, moist condition. We interpret these soils to be consistent with weathered ice -contact overlaying undisturbed ice -contact deposits. Laboratory Testing Geotechnical laboratory tests were performed on a select sample retrieved during test pit explorations to determine soil index and engineering properties encountered. Laboratory testing included visual soil classification per ASTM D2487 and ASTM D2488, moisture content determinations per ASTM D2216, grain size analyses per ASTM D6913, and No. 200 wash per ASTM D1140 standard procedures. Test results are included in Appendix B. GORGES earth m n€.e,,v.;.�;�.7t��,7',9ts. Karnafe|.B34thSt.Se February 1.2021 Page 4 Groundwater Conditions Nngroundwater seepage was observed intest pit TP-1 atthe time ofexcavation; however, iron -oxide staining, a form of soil mottling, was observed at about 3.5 to 4feet below the existing ground surface. At test pit explorations TP'2 we observed rapid groundwater seepage at approxirnabe|y3.5 feet below the existing grade. Similarly, iron -oxide staining was also observed in test pitTP'I as shallow as 2feet from the existing ground surface. Based on these observations made during our subsurface explorations, we interpret that the site is prone to perched groundwater during periods ofprolonged wet weather. Perched groundwater develops when the vertical infiltration of precipitation through a sha||uvv, more permeable soil is slowed at depth by deeper' less permeable material, such as the encountered ice -contact deposits. We anticipate fluctuations in the local groundwater levels will likely occur in response to precipitation patterns, off site construction activities, and site utilization. Analysis or modeling of anticipated groundwater levels during construction isbeyond the scope ofthis report. CONCLUSIONS Based on our site reconnaissance and subsurface explorations, it is our opinion that the onsitoinfiltration ofs1nrrnvva1errunoff generated bvthe proposed residential development isnot feasible given the shallow depth to evidence of seasonal high groundwater. Infiltration Recommendations Per the 2016 K[SVVOM Appendix C, Section [.2.2.2, a nnininnunn vertical separation of3feet is required from the bottom of an infiltration facility to seasonal groundwater and a nninirnunn of feet ofpermeable soil is required below the facility bottom. Additionally, infiltration facility bottoms must be located within native soils in accordance with Chapter 5' Section 52 and Appendix [. Section [.2.2.2. Groundwater seepage was encountered at2.5feet be|nvv existing grade in test pit TP-2 and evidence of seasonal high groundwater was observed at 2 feet below existing grade. Based on the above rnininnurn vertical separation requirements and the observed subsurface conditions, Infiltration is not feasible at the site. We recommend that alternative storrnvvater management BMPs be implemented to manage the roof runoff from the proposed residential development. All rninirnurn setback requirements and infeasibility criteria should be considered prior to the selection of any stornnvvaterfacility for the proposed development. All stormwater facilities should be designed and constructed in accordance with the 2016 KCSWIDM. If there is insufficient room at the site to meet the nninirnunn setback requirements or if onsite storrnvvater management is not feasible for the proposed development, the proposed storrnvvater system should be connected directly to the existing municipal stormwater system, as appropriate. LIMITATIONS We have prepared this report for Mr. Drnitri Kornafe[ and other members of the design team for use inevaluating aportion ofthis project. The data used inpreparing this report and this report should be provided to prospective contractors. Our report, conclusions and interpretations are based ondata from others and limited site reconnaissance, and should not beconstrued as warranty ofthe subsurface conditions. Variations in subsurface conditions are possible between the explorations and may also occur with time. A contingency for unanticipated conditions should be included in the budget and Karnafe|.B34thSt.Se February 1.2021 Page 5 schedule. Sufficient monitoring, testing and consultation should be provided by our firm during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated' and to evaluate whether earthwork and foundation installation activities comply with contract plans and specifications. The scope of our services does not include services related to environmental rennediation and construction safety precautions. Our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except asspecifically described in our report for consideration indesign, If there are any changes in the loads, grades, locations, configurations or type of facilities to be constructed, the conclusions and recommendations presented in this report may not be fully applicable. If such changes are made, we should be given the opportunity to review our recommendations and provide written modifications or verifications, as appropriate. ��� Karnafe|.B34thSt.Se February 1.2021 Page 6 We have appreciated working for you on this project. Please do not hesitate to call at your earliest convenience if you have any questions or comments. es SCOTT KEITH Kyle E.Billingsley, pE KebhS. Schernbs,LEG Project Engineer Principal JZ:KEB:KSS/jz Doc ID: xamafei6334thSt.SR Attachments: Figure 1:Site Location Map Figure l:Site & Exploration Plan pigure3: Site Vicinity Map Figure 4:mmS Soil Map Figure S:Geologic Map Appendix /tSubsurface Explorations Appendix n:Laboratory Test Results Approximate Site Location Map created from King County iMap (https://gismaps.kingcounty.gov/iMap/) "TOffm 707�a GEORESOURCES earth science & geotechnical engineering 4809 P—lfic Hwy, F. I Fife, VVA 98424 1 253.896A01 1 1 -- Site Location Map Proposed Single Family Residence xxx - South 334 Ih Street Federal Way, Washington PN:6143600450 Not to Scale - - - - - - ---- A, - - - - - - - - - T FENCE:'� FT P 21 410 410 Z K) M r L— — — — — — — — — — — Notes: Excerpt from the Site Plan, Sheet AO prepared by Architects Northwest dated April 13 th 2020. FW TP-XX Approximate Test Pit Location IN 5_5L — — — — — — — — — — — — — — — — — — — 41' Na-765--T Scale: 1" = 20' UTILITY EA5EMENTS I 0111111111"T"Mow—an 00 wwwftw!� _.aM00'0 0-.0 M WMM E S "' earth science & geotechnical engineering 4809 Pad fit Hwy- E.. I Fife, WA 98424 1 253.896A011 1 www- georesources.rocks IN Z X, vl WETLAND 2 PER BLA L04L0030 REC. NO, 20050630900012 Site & Exploration Plan Proposed Single -Family Residential xxx - South 334 th Street Federal Way, Washington PN:6143600450 DocID: Karnafel.S334thSt.F I February 2021 1 Figure 2 Approximate Site Location Map created from King County iMap (https://gismaps.kingcounty.gov/iMap/) "TOffm 707�a GEORESOURCES earth science & geotechnical engineering 4809 P—lfic Hwy, F. I Fife, VVA 98424 1 253.896A01 1 1 -- Site Vicinity Map Proposed Single Family Residence xxx - South 334 Ih Street Federal Way, Washington PN:6143600450 Not to Scale Approximate Site Location Map created from Web Soil Survey (http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx) Soil Hydrologic Type Soil Name Parent Material Slopes Erosion Hazard Soils Group AgB Alderwood gravelly sandy Glacial drift and/or glacial outwash 0 to 8 Slight B loam over dense glaciomarine deposits GEORESOUROES earth science & geotechnical engineering 4809 Pa lfic Hwy, F. I Fife, VVA 98424 1 253.896A01 1 1 ­­ NRCS Soils Map Proposed Single -Family Residence xxx - South 334 th Street Federal Way, Washington PN:6143600450 Not to Scale {Yt vS J,Stt tti, . ,, ., , S i} x}: � }Y ,'z,. S t� ..'C,... ? L. d. r \ �. 5:•. :'i{it, l ))��ii t\ 9 , t. �rr?~',-^-,,.. �:,� 'r •, e.,£.c.tii z �'Y .a} `\i �'1 t \� �S �.., S��t�ti� 7�. 4i.t l.tti`,l ;r, �t .t F,.�tfir "h\3i . �".��� �:. «S..,t1 `,•: % >ft's 1�4., �. i �. , �» t„ tolr Kr §``s kr ': u. rYi t,:;v t.i lF£� `Y'„�a.�.3 ,. ,'.. ���fi�• f Yt .<::it 2t`P',.G }. � ,} t,:.xi� Y '.. t, � :a; `: `�, uS�, }y \,�{ ,1o•+,`. �E}i�, ?' ":.�tSs Y��4 �i :tf r`�.. ,,,r� s,.`+.i`tti,. . �.,xF '4 tiR e ,`\. trikr. �, .' :��; ,tt .'�., t,3t 4. {'•,.tiiskf{} rzt f,j,`'',, ,anr �:'r,v t ..�,. r< `+;,��: r �i "\�i\, t,'�i11! f � }'tt ��1�`.v �:, fSs`�Si�,'t'+ §�'it e., ,,; 5•sC,4S, 1l lilt? ttF `} \?:f �,��""�tr2 ,tii, � +2 '', � A'4r}� {k`��9. }� :31�t tG;2}it ,t;. £ ��}a,�\, )f14.i;r ,�il•S\lc,,,r ��.a ;}4f1'',, AF /.. `S}:) '� � i,r}:` `t it A,��f vA::" fi,,} ? vlr. .��v2 ,;i7"I 1 '. ,., .`t.,'! ��' ��''\\\'„\rs" �� �:; � #t} } ,r s : C\ 4, ? ' ? S S .°s',S',it�{ l ' t �S z � U d � S �s' i � , `"w a•" }?u •?{, 5 ,.,`< 'r ��tz S\'4{li` fs"i$ �`»C i:zr b) 55....t%{} } SR$4��{?Sz ... �Ftft `„ -inf t;?y <., } `P�h ' � kf}Ty{\�L ,"4`� 5 tt �� �' 41 t �v �"§2 '} � � \ `�� V,, � {'ti.. :7i'. 4 $.ER �rniA E5, v 11 t : y �Siv::1 } . ., i ' ?• a?+.y ,. kf ( t; p`ti„ ,..., 5.. {a�� 41. ,. ki l'`.•s,� (,}SC n `r ).,t l +tr�4v { � t - �, #J ,..3� ri C ;•~:' �X t .. ,c , :� '.l .� �� (.tit.. 4.�r, Y't,: , „l r {{��, Z '{S\s. #S. ys�•,ti\ ''� {? ?\; ...t % .t. �?tFtst �} t�}� ,fa, ., �3, �.t" .+d1Yt;}S\ {s�� 4t ti. :.. Y; frt `St, fi{ VS4��»1•�T"'ryt i��t`y}:»4�r a�:r�. i ;elt `;t} t ., b:1. ,+1 tt1.2 ✓� rR"t§l t.;`}�yt\ "\i ,, P§}f,`„}k�� \\`:J.t ti\,t,Z'iit#tC ��k}��'. ? ?§S.2 7�}} •3 I' `f'kr ti?; Y "r}\2'ti �, �. `n,.,,b :}1t~3i�,.,; S •t;1 r £ .{ {i tt3 1rr}r,}�y,+u, '1\, 2 ,, � :fit U i "v11�. `Y, " "r� i t 4 a ti. , rt �Y , ,�._. ,.'. �#.' } 1? 3kti fzt, L?�\�. rr1 Iti t ✓ °f { s � {"�r , 2 si,> '. � S? \ `\''t.. { ,& t ��. � � �y . t t � t. '\�{'}. 'z ;u, � , rtr Sk 4'?: , ; r t i��� :' , "4•.t i19 . F,akra}} ,'.34 2,fi,. ti ,.� . �ti i ,-�•r,i,. } S F } 3 � Z .. `igt$S � , , �i4 t1., ttt t :,, , e`t xt..,,. ,.o tr<Szs~"•k. e.�, t?. s, .7�.. :t .ti.2 } '\ +rrna .'.\ 1, .,. •. e ,.w yy �i2. �; � �,.ac }•`tia3:.. l:.\., lr�t�{t :l Z,1t } 1 }.L:, al, ,# tw`i ti ,t � �,, ,, ��b{..,. �=;'az,� it\ti,§+; ?.g+FrtiY�t4 \1 ...t`,. `, 4i, }�fr ...,? � +1 t i':, •, ,,t, .tt. \ t 1 : },st�� �1 �.. !•e ,.\ � {t i ,{»S ��,.1 ,»ti .z !tli e.? .}?C. ty. e 1 Zh?��`..0 s'yl`�'t,. `,' tlY;. s; `':t =. ,n,>S. : ,:Ulna Sal{,� \ .., ',.l} \. {. Z.. x'�r , t•,}:,: 3i ehZ', F , .{ tt £� .:: �'£. 1\t `� �1...' ,,k � :..4 :.+, ,,.,.. �, a ,$ e., .va, n.. c �� ?\'. G .�1rr4 �'e � , •}n zti(N 3} h 1"S11 `Y ?'} �..? EY R %1,i �lr :: i,rht% U ����\'\�:, i3 t iM P, `'r�SS i? rs� t.ti� ate .. i } y"., i �}',�{;.r,Sstf„f,, 'tt � lr f?,, +: 2 `2!',`a\:i }}Z,a ,,, , �. � Ge.{rY � \� � tFe zi ,Ukt 'r S. r.. t {1 :r 11 tti`. srs ;i 51�7:' "t± ��:': ..,. }, \ }, t l �,1 ;,. �. : ,, t.§, 2 if}} ?.. ' � H +a: 6{.€>•>,t�?:}�2'.� �,, �.. � t fJ ;::: R��,},2 er+tl' „,r:,,,-.»i Ji4�`�""k�� .��u�&4�a�r� :5 v'' t'Stiat"•th'o�$}MYtc'w",�Yo- t',4h 5',: ..,,, "�,r�rw ;< �. �"`,., x�*,v..a ;,:'� r r,":3. r,r tki}},,y }l'?�-Yt`�}) f1��:��rstr�\2 §d$, , ,'�� ;'.ti�rt�*;'��,5\'t�.`•a\{� iilhirf �{ `.: t :;, :� �?��\ss ,` ��'� � �"� ,':�;,.. .,, t(! Y �Sr 1 } tU?{ f S2t5'de i'. fS tti3 Y, v� 4 i S tU ?t E k elf gyp? { r �fT 1i )•i {,'{ } , r 1 4v ''i� V H"�`'�� . a a { { ,{�A� }tea: t, 3'» u f U � ?s Itt??t rF t r4Gk t t4it Approximate Site Location An excerpt from the Lidar-revised geologic map of the Poverty bay 7.5' quadrangle, King and Pierce Counties, Washington by R.W. Tabor, D.B. Booth, and K.G. Troost (2014) Ya{t�iil i�SS i{ittlk`i,t?t`l Ice Contact deposits n Glacial Till Not to Scale Geologic Map Proposed Single -Family Residence xxx - South 334t" Street G E O R E S O U R C E S Federal Way, Washington earth science & geotechnical engineering PN: 6143600450 4809 Pact Fic Hwy, F. I Fife, VJA 98424 1 253. 896,1011 1 www.. geo resources.r®cks DocID: Karnafel.S334thSt.F February 2021 Figure 5 Appendix Subsurface Explorations SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GRAVEL CLEAN GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GRAVEL GP POORLY -GRADED GRAVEL COARSE GRAINED More than 50% GRAVEL GM SILTY GRAVEL SOILS Of Coarse Fraction WITH FINES Retained on GC CLAYEY GRAVEL No. 4 Sieve SAND CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND More than 50% SP POORLY -GRADED SAND Retained on No. 200 Sieve More than 50% SAND SM SILTY SAND Of Coarse Fraction WITH FINES Passes Sc CLAYEY SAND No. 4 Sieve SILT AND CLAY INORGANIC ML SILT CL CLAY FINE GRAINED SOILS Liquid Limit ORGANIC OL ORGANIC SILT, ORGANIC CLAY Less than 50 SILT AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY More than 50% Passes No. 200 Sieve Liquid Limit ORGANIC OH ORGANIC CLAY, ORGANIC SILT 50 or more HIGHLY ORGANIC SOILS PT PEAT NOTES: SOIL MOISTURE MODIFIERS: 1. Field classification is based on visual examination of soil Dry- Absence of moisture, dry to the touch in general accordance with ASTM D2488-90. Moist- Damp, but no visible water 2. Soil classification using laboratory tests is based on ASTM D2487-90. Wet- Visible free water or saturated, usually soil is obtained from below water table 3. Description of soil density or consistency are based on interpretation of blow count data, visual appearance of soils, and or test data. Qan GEORESOURCES earth science & gecftechnnical engineering 4809 Pacific Hwy, F. I Fife, WA 98424 1 253.896,1011 I www. georesources.rocks Unified Soils Classification System Proposed Single -Family Residence xxx - South 3341h Street Federal Way, Washington PN: 6143600450 DocID: Karnafel.S334thSt.F February 2021 Figure A-1 ■ LOG OF TEST PIT Karnafel.S334thSt xxx - South 334th Street Federal Way, Washington 1. Refer to log key for definition of symbols, abbreviations, and codes Excavation Company: Client Porovided 2. USCS disination is based on visual manual classification Excavation Rig: Small Track Excavator and selected lab testing 3. Groundwater level, if indicated, is for the date shown and may vary Sampler Type: Grab 4. NE = Not Encountered Mottling From: 3.5' - 4' GBS 5. ATE = At Time of Excavation Groundwater Seepage From: NE Caving From: NE Notes: Eastern portion of the site; near pro a v v Exploration v w v °/ notes o� w 0 —I— 410 1 --I— 409 2 T 408 Increase in density and moisture with depth 3--407 4 4— 406 5 4— 405 6 4— 404 Logged By: Ecavation Date: Datum: Elevation: Termination Depth: Latitude: fla 1/19/2021 NAVD 88 410 ft 4 ft NA driveway Longitude: NA sTest Results o _°Q Plastic Limit i Liquid Limit 3 Soil description o E % Fines (<0.075mm) O m 0- N % Water Content • o a � � Topsoil/duff rootzone Brown to black silty SAND with gravel (medium dense, moist)(Weathered ice -contact deposits) Grey cemented silty SAND with gravel (dense to very dense, moist)(Undisturbed ice -contact deposits) (Termination Depth - 111912021) S1 S2 nTopsoil Silty sand Sheet 1 of 1 JOB: Karnafel.S334thSt FIG. A-2 . LOG OF TEST PIT TP-2 A.r Karnafel.S334thSt G E E S E xxx - South 334th Street earth Science & g otechnical engineering Federal Way, Washington 1. Refer to log key for definition of symbols, abbreviations, and codes Excavation Company: Client Porovided Logged By: JZ 2. USCS disination is based on visual manual classification Excavation Rig: Small Track Excavator Ecavation Date: 1 /19/2021 and selected lab testing 3. Groundwater level, if indicated, is for the date shown and may vary Sampler Type: Grab Datum: NAVD 88 4. NE = Not Encountered Mottling From: 2' - 4' GBS Elevation: 410 ft 5. ATE = At Time of Excavation Groundwater Seepage From: 2.5 ft Termination Depth: 4 ft Caving From: 1 ft to 3ft Latitude: NA Notes: Western portion of the site; within proposed backyard Longitude: NA sTest Results a v o v Exploration Soil description o o v o s E Plastic % Fines Limit i (<0.075mm) O Liquid Limit 3 o° v notes m 0. N % Water Content • o w a a E i7 � Penetration - ♦ (blows per foot) 0 410 o 0 Topsoil/duff rootzone S1 Brown to black silty SAND with gravel (loose to medium dense, moist to wet)(reworked native?) 1 409 2 408 Rapid groundwater ATE seepage @ 2.5 ft BGS 3 407 Grey cemented silty SAND with gravel (dense to very dense, moist)(Undisturbed ice -contact deposits) 4 406 (Termination Depth - 111912021) 5 405 6 404 Topsoil Silty sand Silty sand and gravel Sheet 1 of 1 JOB: Karnafel.S334thSt FIG. A-3 Appendix B Laboratory Test Results ly W Z H Z W U ly LLJ IL 100 90 80 70 60 50 40 30 20 10 0 Particle Size Distribution Report GRAIN SIZE - mm. % Gravel % Sand % Fines %Coarse Fine Coarse Medium Fine Silt Clay i 0.0 5.9 28.8 8.1 14.6 26.7 15.9 Test Results (ASTM D 6913 & ASTM D 1140) Opening Percent Spec.* Pass? Size Finer (Percent) (X=Fail) 1.25 100.0 1 97.4 .75 94.1 .5 82.6 .3125 76.7 #4 65.3 #10 57.2 #20 50.6 #40 42.6 #60 32.1 #100 23.5 #200 15.9 F (no specification provided) Sample Number: S2 Depth: 3.511 E GeoResources, LLC Fife, WA Material Description Grey cemented silty SAND with gravel (dense to very dense, moist)(Undisturbed ice -contact deposits) Atter_berg—Limits A( STM D 43101 PL= NP LL= NV PI= NP Classification USCS (D 2487)= SM AASHTO (M 145)= A-1-b Coefficients Dgo= 16.3436 D85= 13.9190 D60= 3.2269 D50= 0.7984 D30= 0.2235 D15= D10= Cu= Cc= Remarks Natural Moisture: 12.0% Test Pit: TP-1 Date Received: 1/18/2021 Date Tested: 1/18/2021 Tested By: JZ Checked By: KSS Title: LEG Client: Dmitriy Karnafel Project: Karnafel.S334thSt Date Sampled: 1/18/2021 Tested By: Checked By: APPENDIX B: DRAINAGE PLAN APPENDIX C: APPENDIX D: KARNAFEL FAMILY RESIDENCE STORM DRAINAGE FACILITIES This Operation and Maintenance Manual is for the dispersion facilities serving the single family residence located on parcel number 6143600450. The purpose of the stormwater facilities is to provide management of stormwater runoff generated by the residence and the proposed driveway. The storm drainage facilities include the splash -block for the roof downspouts and the dispersion trench for the driveways. A catch basin will be installed between the surfaces to provide a point for some trash and any other substances that could clog the systems to be removed from the runoff. Sediment and trash should be prevented from entering the dispersion facilities to keep the rock and native soils from clogging. The following pages identify and describe the maintenance tasks associated with the storm drainage facilities. This Operation and Maintenance Manual shall be kept on the premises of the home on parcel number 6143600450 and must be made available for inspection by the City of Federal Way. The operation and maintenance of the storm drainage facilities will be the responsibility of the home owner. Long-term maintenance shall be performed as described hereinafter. All conveyance systems shall be inspected for sediment and blockages on an annual basis or after large storm events. Catch basin sumps shall be removed of sediment and debris on an annual basis or if a blockage occurs. The main contributors of sediment to the storm system are total suspended solids (TSS) and detritus from trees. The debris collected shall be placed in the trash, not the roadway catch basins. Long-term maintenance of the storm drainage system shall be completed in accordance with the following checklists. Instructions for Use of Maintenance Checklists The following pages contain maintenance needs for most of the components that are part of your drainage system, as well as for some components that you may not have. Ignore requirements that do not apply to your system. You should plan to complete a checklist for all system components on the following schedule: 1. Monthly from November through April. 2. Once in late summer (preferably in September). 3. After any major storm (use 1-inch in 24-hours as a guideline), for items marked "S" only. Using photocopies of the checklist pages, check off the problems that you looked for each time you conducted an inspection. Add comments on problems found and remedy actions taken. Keep these "checked" sheets in your records. Some items do not need to be looked at every time an inspection is done. Use the suggested frequency at the left of each item as a guideline for your inspection. APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES CATCH Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no bottom of the catch basin to the invert of the sediment. lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Trash and debris Trash or debris of more than '% cubic foot which No Trash or debris blocking or is located immediately in front of the catch basin potentially blocking entrance to opening or is blocking capacity of the catch basin catch basin. by more than 10%. Trash or debris in the catch basin that exceeds No trash or debris in the catch '/s the depth from the bottom of basin to invert basin. the lowest pipe into or out of the basin. Dead animals or vegetation that could generate No dead animals or vegetation odors that could cause complaints or dangerous present within catch basin. gases (e.g., methane). Deposits of garbage exceeding 1 cubic foot in No condition present which would volume. attract or support the breeding of insects or rodents. Damage to frame Corner of frame extends more than % inch past Frame is even with curb. and/or top slab curb face into the street (If applicable). Top slab has holes larger than 2 square inches Top slab is free of holes and cracks. or cracks wider than '/4 inch. Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab. separation of more than % inch of the frame from the top slab. Cracks in walls or Cracks wider than '/2 inch and longer than 3 feet, Catch basin is sealed and is bottom any evidence of soil particles entering catch structurally sound. basin through cracks, or maintenance person judges that catch basin is unsound. Cracks wider than inch and longer than 1 foot No cracks more than inch wide at at the joint of any inlet/outlet pipe or any the joint of inlet/outlet pipe. evidence of soil particles entering catch basin through cracks. Settlement/ Catch basin has settled more than 1 inch or has Basin replaced or repaired to design misalignment rotated more than 2 inches out of alignment. standards. Damaged pipe joints Cracks wider than 1/2-inch at the joint of the No cracks more than 1/4-inch wide at inlet/outlet pipes or any evidence of soil entering the joint of inlet/outlet pipes. the catch basin at the joint of the inlet/outlet pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes. pipes (includes floatables and non-floatables). Damaged Cracks wider than %-inch at the joint of the No cracks more than '/4-inch wide at inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe. at the joints of the inlet/outlet pipes. 2016 Surface Water Design Manual — Appendix A 4/24/2016 A-9 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 5 - CATCH BASINS AND MANHOLES 7771 Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Metal Grates Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design (Catch Basins) standards. Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. footnote to guidelines for disposal Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design Any open structure requires urgent standards. maintenance. Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to Any open structure requires urgent structure. maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. Not Working maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and Remove cover/lid after applying 80 lbs. of lift. reinstalled by one maintenance person. 4/24/2016 2016 Surface Water Design Manual — Appendix A A-10 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 6 - CONVEYANCE PIPES AND DITCHES Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Pipes Sediment & debris Accumulated sediment or debris that exceeds Water flows freely through pipes. accumulation 20% of the diameter of the pipe. Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes. water through pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced. coating or corrosion is weakening the structural integrity of any part of pipe. Damaged Any dent that decreases the cross section area Pipe repaired or replaced. of pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from square feet of ditch and slopes. ditches. Sediment Accumulated sediment that exceeds 20% of the Ditch cleaned/flushed of all accumulation design depth. sediment and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Vegetation Vegetation that reduces free movement of water Water flows freely through ditches. through ditches. Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding. slopes Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards. place or missing (If area 5 square feet or more, any exposed native Applicable) soil. 2016 Surface Water Design Manual — Appendix A 4/24/2016 A-11 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES . — Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site. per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a height. height no greater than 6 inches. Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility. potential to fall and cause property damage or threaten human life. A hazard tree identified by a qualified arborist must be removed as soon as possible. Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5% broken which affect more than 25% of the total of total foliage with split or broken foliage of the tree or shrub. limbs. Trees or shrubs that have been blown down or No blown down vegetation or knocked over. knocked over vegetation. Trees or shrubs free of injury. Trees or shrubs which are not adequately Tree or shrub in place and supported or are leaning over, causing exposure adequately supported; dead or of the roots. diseased trees removed. 4/24/2016 2016 Surface Water Design Manual — Appendix A A-16 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 32 - RAINWATER HARVESTING BMP Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Preventative Storage volume No rain water in storage unit at the beginning of Maximum storage available at the the rain season. beginning of the rain season (Oct. Collection Area Trash and debris Trash of debris on collection area may plug filter Collection area clear of trash and system debris. Filter Restricted or plugged Filter is partially or fully plugged preventing water Filter is allowing collection water from getting in to the storage unit. into storage unit. Inspection Frequency Annually and after large storms Rain harvesting equipment is functioning normally. Maintenance log A Maintenance log must be kept and available for Maintenance log is kept and is review by KC staff. available to KC staff. NO. 3 - ROCK PAID BMP Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Site Trash and debris Trash and debris accumulated on rock pad site. Rock pad site free of any trash or debris. Rock Pad Area Rock pad size Rock pad is not 2 feet by 3 feet by 6 inches thick Rock pad is 2 feet by 3 feet by 6 or as designed. inches thick or as designed. Vegetation Vegetation is seen growing in or through rock No vegetation within rock pad area. pad. Rock Exposed soil Soil can be seen through the rock pad. Full thickness of the rock pad is in place, no soil visible through rock pad. Inspection Frequency Annually and after large storms Rock pad is functioning normally. NO. 34 - SHEET FLOW BMP Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Site Trash and debris Trash and debris accumulated on the sheet flow Sheet flow site free of any trash or site. debris. Sheet flow area Erosion Soil erosion occurring in sheet flow zone. Soil erosion is not occurring and rills and channels have been repaired. Concentrated flow Sheet flow is not occurring in the sheet flow zone. Sheet flow area is regraded to provide sheet flow. Inspection Frequency Annually and after large storms Rain harvesting equipment is functioning normally. 4/24/2016 2016 Surface Water Design Manual — Appendix A A-40 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO.35 - SPLASH BLOCK BMP Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Site Trash and debris Trash and debris accumulated on the splash Splash block site free of any trash or block. debris. Splash Block Dislodged Splash block moved from outlet of downspout. Splash block correctly positioned to catch discharge from downspout. Channeling Water coming off the splash block causing No erosion occurs from the splash erosion. block. Downspout water Water coming from the downspout is not Water is discharging normally to the misdirected discharging to the dispersal area. dispersal area. Inspection Frequency Annually and after large storms. Rain harvesting equipment is functioning normally. 2016 Surface Water Design Manual — Appendix A 4/24/2016 A-41 APPENDIX E: DRAINAGE CALCULATIONS S 334TH ST EXISTING PGIS = 3,041 SF (0.070 AC) (COLLECTOR STREET) I- PROPOSED OFFSITE PGIS 94 SF (0.002 AC) or rr �� OFFSITE PERVIOUS AREA= %�/'%%fir / 861 SF (0.020 AC) ON SITE SIDEWALK AREA = 75 SF----- (0.002 AC) ONSITE PERVIO ROOF ARE A=3,9185E LI I L1 I .. LI I LI LLLLL LLI LI I LI LLLLLL - -I LLI u I LI LLLLLLL � LLLLLL �`. 1 LI LI LI I L1 I LI LI LI I LI LLI LI I LI I LI L _ LI ..L _LI LI I Ll LLI LI I LI I Ll t - .. LI L1 .I LI I LI L LLLLLLLLI- N SITE BASIN MAP W*—E SCALE 1" =2D FT S 0 10 20 40 UNIT OF MEASUREMENTINUSFEET TOTAL DISTURBED AREA (INCLUDING REPAVED ASPHALT) =12,266 SF (0.282 AC) 2,767 SF Project Name: 2021.2.1 -Karnafel Site Name: Site Address: City: Report Date: 2/3/2021 Gage: Seatac Data Start: 1948/10/01 Data End: 2009/09/30 Timestep: 15 Minute Precip Scale: 1.000 Version Date: 2019/09/13 Version: 4.2.17 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POCII: 50 Year 20212 1 -Karnafel 2/3/2021 5:06:14 PM Page 2 Landuse Basin Data Predeveloped Land Use Predeveloped Bypass: No GroundWater: No Pervious Land Use acre C, Forest, Mod 0.182 Pervious Total 0.182 Impervious Land Use acre Impervious Total 0 Basin Total 0.182 Element Flows To: Surface Interflow Groundwater 20212 1 -Karnafel 2/3/2021 5:06:14 PM Page 3 Mitigated Land Use Basin 2 Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Mod 0.067 Pervious Total 0.067 Impervious Land Use acre ROADS MOD 0.024 ROOF TOPS FLAT 0.089 SIDEWALKS MOD 0.002 Impervious Total 0.115 Basin Total 0.182 Element Flows To: Surface Interflow Groundwater 20212 1 -Karnafel 2/3/2021 5:06:14 PM Page 4 Routing Elements 20212 1 -Karnafel 2/3/2021 5:06:14 PM Page 5 20212 1 -Karnafel 2/3/2021 5:06:14 PM Page 6 Analysis Results POC I )x + Predeveloped Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.182 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 4 x Mitigated Total Pervious Area: 0.067 Total Impervious Area: 0.115 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.005419 5 year 0.00888 10 year 0.011105 25 year 0.013752 50 year 0.015585 100 year 0.017297 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.050418 5 year 0.065817 10 year 0.076548 25 year 0.090748 50 year 0.101807 100 year 0.113292 AnnualPeaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 0.006 0.071 1950 0.007 0.065 1951 0.012 0.043 1952 0.004 0.032 1953 0.003 0.036 1954 0.005 0.041 1955 0.007 0.046 1956 0.006 0.044 1957 0.005 0.053 1958 0.005 0.041 20212 1 -Karnafel 2/3/2021 5:06:14 PM Page 7 1959 0.005 0.039 1960 0.008 0.045 1961 0.004 0.044 1962 0.003 0.036 1963 0.004 0.045 1964 0.005 0.040 1965 0.004 0.055 1966 0.003 0.034 1967 0.008 0.062 1968 0.005 0.073 1969 0.005 0.050 1970 0.004 0.047 1971 0.004 0.057 1972 0.009 0.063 1973 0.004 0.032 1974 0.004 0.054 1975 0.006 0.054 1976 0.004 0.042 1977 0.001 0.040 1978 0.004 0.050 1979 0.002 0.067 1980 0.011 0.076 1981 0.003 0.051 1982 0.007 0.076 1983 0.006 0.057 1984 0.004 0.037 1985 0.002 0.051 1986 0.009 0.044 1987 0.008 0.065 1988 0.003 0.038 1989 0.002 0.052 1990 0.020 0.106 1991 0.010 0.083 1992 0.004 0.037 1993 0.004 0.032 1994 0.001 0.033 1995 0.006 0.045 1996 0.014 0.056 1997 0.011 0.050 1998 0.003 0.046 1999 0.012 0.108 2000 0.004 0.050 2001 0.001 0.052 2002 0.005 0.067 2003 0.007 0.057 2004 0.008 0.100 2005 0.006 0.044 2006 0.006 0.040 2007 0.015 0.096 2008 0.018 0.080 2009 0.008 0.060 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predevelloped Mitigated 1 0.0196 0.1076 2 0.0181 0.1065 3 0.0148 0.1000 20212 1 -Karnafel 2/3/2021 5:06:55 PM Page 8 4 0.0137 0.0963 5 0.0118 0.0826 6 0.0116 0.0797 7 0.0106 0.0760 8 0.0106 0.0757 9 0.0104 0.0726 10 0.0093 0.0709 11 0.0090 0.0670 12 0.0084 0.0670 13 0.0083 0.0648 14 0.0082 0.0648 15 0.0082 0.0625 16 0.0076 0.0621 17 0.0074 0.0597 18 0.0074 0.0572 19 0.0072 0.0570 20 0.0069 0.0568 21 0.0064 0.0564 22 0.0062 0.0554 23 0.0061 0.0542 24 0.0059 0.0541 25 0.0059 0.0535 26 0.0059 0.0519 27 0.0057 0.0515 28 0.0054 0.0512 29 0.0053 0.0508 30 0.0048 0.0504 31 0.0048 0.0504 32 0.0047 0.0503 33 0.0046 0.0502 34 0.0046 0.0474 35 0.0046 0.0464 36 0.0045 0.0464 37 0.0044 0.0455 38 0.0044 0.0453 39 0.0042 0.0446 40 0.0041 0.0440 41 0.0041 0.0437 42 0.0041 0.0436 43 0.0040 0.0435 44 0.0038 0.0430 45 0.0037 0.0417 46 0.0037 0.0412 47 0.0037 0.0406 48 0.0036 0.0401 49 0.0035 0.0399 50 0.0035 0.0396 51 0.0033 0.0392 52 0.0032 0.0379 53 0.0030 0.0369 54 0.0028 0.0369 55 0.0026 0.0364 56 0.0022 0.0360 57 0.0021 0.0341 58 0.0021 0.0327 59 0.0014 0.0324 60 0.0007 0.0324 61 0.0006 0.0320 2021.2.1-Karnafel 2/3/2021 5:06:55 PM 20212 1 -Karnafel 2/3/2021 5:06:55 PM Page 10 Flow(cfs) Predev mit Percentage Pass/Fail 0.0027 17079 110666 647 Fail 0.0028 15490 106431 687 Fail 0.0030 14072 102474 728 Fail 0.0031 12801 98731 771 Fail 0.0032 11569 95159 822 Fail 0.0034 10519 91715 871 Fail 0.0035 9567 88443 924 Fail 0.0036 8752 85299 974 Fail 0.0037 8040 82304 1023 Fail 0.0039 7343 79459 1082 Fail 0.0040 6733 76829 1141 Fail 0.0041 6188 74262 1200 Fail 0.0043 5726 71802 1253 Fail 0.0044 5309 69449 1308 Fail 0.0045 4924 67204 1364 Fail 0.0047 4569 65022 1423 Fail 0.0048 4235 62926 1485 Fail 0.0049 3951 60937 1542 Fail 0.0051 3643 58969 1618 Fail 0.0052 3388 57065 1684 Fail 0.0053 3133 55311 1765 Fail 0.0054 2915 53643 1840 Fail 0.0056 2706 51953 1919 Fail 0.0057 2490 50349 2022 Fail 0.0058 2314 48809 2109 Fail 0.0060 2136 47291 2213 Fail 0.0061 1973 45836 2323 Fail 0.0062 1822 44510 2442 Fail 0.0064 1702 43141 2534 Fail 0.0065 1577 41858 2654 Fail 0.0066 1442 40617 2816 Fail 0.0067 1325 39334 2968 Fail 0.0069 1232 38136 3095 Fail 0.0070 1147 37045 3229 Fail 0.0071 1083 35955 3319 Fail 0.0073 1020 34949 3426 Fail 0.0074 947 33944 3584 Fail 0.0075 886 33003 3724 Fail 0.0077 824 32105 3896 Fail 0.0078 760 31163 4100 Fail 0.0079 725 30244 4171 Fail 0.0080 674 29388 4360 Fail 0.0082 623 28575 4586 Fail 0.0083 589 27741 4709 Fail 0.0084 549 26928 4904 Fail 0.0086 506 26137 5165 Fail 0.0087 469 25389 5413 Fail 0.0088 427 24747 5795 Fail 0.0090 388 24084 6207 Fail 0.0091 356 23357 6560 Fail 0.0092 328 22715 6925 Fail 0.0093 297 22095 7439 Fail 0.0095 270 21496 7961 Fail 0.0096 241 20923 8681 Fail 20212 1 -Karnafel 2/3/2021 5:06:55 PM Page 11 0.0097 218 20375 9346 Fail 0.0099 197 19851 10076 Fail 0.0100 173 19344 11181 Fail 0.0101 152 18820 12381 Fail 0.0103 130 18326 14096 Fail 0.0104 119 17819 14973 Fail 0.0105 104 17321 16654 Fail 0.0106 95 16867 17754 Fail 0.0108 83 16448 19816 Fail 0.0109 74 16035 21668 Fail 0.0110 69 15614 22628 Fail 0.0112 61 15182 24888 Fail 0.0113 53 14805 27933 Fail 0.0114 46 14476 31469 Fail 0.0116 39 14106 36169 Fail 0.0117 29 13738 47372 Fail 0.0118 25 13406 53624 Fail 0.0119 22 13079 59450 Fail 0.0121 20 12767 63834 Fail 0.0122 17 12444 73200 Fail 0.0123 14 12145 86750 Fail 0.0125 12 11849 98741 Fail 0.0126 8 11567 144587 Fail 0.0127 7 11274 161057 Fail 0.0129 7 10998 157114 Fail 0.0130 7 10729 153271 Fail 0.0131 6 10453 174216 Fail 0.0132 6 10202 ' 170033 Fail 0.0134 6 9986 166433 Fail 0.0135 6 9728 162133 Fail 0.0136 6 9522 158700 Fail 0.0138 5 9317 186340 Fail 0.0139 5 9129 182580 Fail 0.0140 5 8921 178420 Fail 0.0142 5 8688 173760 Fail 0.0143 5 8481 169620 Fail 0.0144 5 8271 165420 Fail 0.0145 5 8076 161520 Fail 0.0147 4 7892 197300 Fail 0.0148 4 7694 192350 Fail 0.0149 3 7507 250233 Fail 0.0151 3 7343 244766 Fail 0.0152 3 7155 238500 Fail 0.0153 3 6996 233200 Fail 0.0155 3 6838 227933 Fail 0.0156 3 6669 222300 Fail The development has an increase in flow durations from 1 /2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. 2021.2.1-Karnafel 2/3/2021 5:06:55 PM Page 12 Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. 20212 1 -Karnafel 2/3/2021 5:06:55 PM Page 13 M� M LID Technique Usedfor Total Volume Volume Infiltration Cumulative Percent Water Quality Percent Comment Treatment'? Needs Through Volume Volume Volume Water Quality Treatment Facility (ac-ft) Infiltration Infiltrated Treated (a c-ft) (a c-ft) Credit Total Volume lnflltrated 10.00 U10 0.00, 04D 0.00 0% No -Treat Credit Compliance withILID Duration StandardS%02-yrto, 50% of Analysis Z-Yf Result= Failed 20212 1 -Karnafel 2/3/2021 5:06:55 PM Page 14 Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. 141PLI1Changes • IMPLND changes have •- mada 20212 1 -Karnafel 2/3/2021 5:07:25 PM Page 15 Wei =0 Predeveloped Schematic 20212 1 -Karnafel 2/3/2021 5:07:25 PM Page 16 20212 1 -Karnafel 2/3/2021 5:07:26 PM Page 17 r .ice op.d UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 END GLOBAL 2009 09 30 FILES <File> <Un#> END FILES OPN SEQUENCE UNIT SYSTEM 1 <----------- File Name---- -------------------------->*** *** INGRP INDELT 00:15 PERLND 11 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #<---------- Title ----------- >***TRAN PIVL DIG1 FILL 1 Predeveloped MAX END DISPLY-INF01 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE FARM # # K *** END FARM END GENER PERLND GEN-INFO PYR DIG2 FIL2 YRND 1 2 30 9 <PLS ><------- Name ------- >NBLKS Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** 11 C, Forest, Mod 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC *** 11 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC ********* 11 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 18 PWAT-PARMl <PLS > PWATER variable monthly parameter value flags *** # - # CSNO RTOP UZFG VCS VUZ VNN VIEW VIRC VLE INFC HWT *** 11 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 11 0 4.5 0.08 400 0.1 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 *** # - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 11 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 *** # - # CEPSC UZSN NSUR INTFW IRC LZETP *** 11 0.2 0.5 0.35 6 0.5 0.7 END PWAT-PARM4 PWAT-STATEI <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** # - # *** CEPS SURS UZS IFWS LZS AGWS 11 0 0 0 0 2.5 1 END PWAT-STATEI END PERLND IMPLND GEN-INFO <PLS ><------- Name ------- > Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW IWAT SLD IWG IQAL *** END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR # - # ATMP SNOW TWAT SLD IWG IQAL ********* END PRINT -INFO TWAT-PARM1 <PLS > IWATER variable monthly parameter value flags *** # - # CSNO RTOP VRS VNN RTLI *** END TWAT-PARM1 IWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC END IWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN END IWAT-PARM3 TWAT-STATEI <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS END TWAT-STATEI GWVS 0 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 19 END IMPLND SCHEMATIC <-Source-> <Name> # Predeveloped*** PERLND 11 PERLND 11 ******Routing****** END SCHEMATIC <--Area--> <-Target-> MBLK <-factor-> <Name> # Tbl# 0.182 COPY 501 12 0.182 COPY 501 13 NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** # - #<------------------ >< --- > User T-series Engl Metr LKFG *** in out *** END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG,HTF'G SDFG GQFG OXFG NUFG PKFG PHFG *** END ACTIVITY PRINT -INFO <PLS > **********'******* Print -flags ******************* PIVL PYR # - # HYDR ADCA CONSHEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section *** # - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 *** <------ ><-------- ><--------><--------><--------><--------><--------> *** END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <---><---><---><---><---> *** <---><---><---><---><---> END HYDR-INIT END RCHRES SPEC -ACTIONS END SPEC -ACTIONS FTABLES END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # *** WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 20 WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL END EXT TARGETS MASS -LINK <Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** MASS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 12 MASS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS -LINK 13 END MASS -LINK END RUN 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 21 Mitigated UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 END GLOBAL 2009 09 30 FILES <File> <Un#> END FILES OPN SEQUENCE UNIT SYSTEM 1 <----------- File Name---- -------------------------->*** *** INGRP INDELT 00:15 PERLND 17 IMPLND 2 IMPLND 4 IMPLND 9 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #<---------- Title ----------- >***TRAN PIVL DIG1 FILL 1 Basin 2 MAX END DISPLY-INF01 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE FARM # # K *** END FARM END GENER PERLND GEN-INFO PYR DIG2 FIL2 YRND 1 2 30 9 <PLS ><------- Name ------- >NBLKS Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** 17 C, Lawn, Mod 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC *** 17 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC ********* 2021.2.1-Karnafel 2/3/2021 5:07.26 PM Page 22 17 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO PWAT-PAP.Ml <PLS > PWATER variable monthly parameter value flags # - # CSNO RTOP UZFG VCS VUZ VNN VIEW VIRC VLE INFC HWT 17 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 17 0 4.5 0.03 400 0.1 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 # - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 17 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 # - # CEPSC UZSN NSUR INTFW IRC LZETP 17 0.1 0.25 0.25 6 0.5 0.25 END PWAT-PARM4 PWAT-STATE1 <PLS > Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 # - # CEPS SURS UzS IFWS LZS AGWS GWVS 17 0 0 0 0 2.5 1 0 END PWAT-STATE1 END PERLND IMPLND GEN-INFO <PLS >< ------- Name ------- > Unit -systems Printer # - # User t-series Engl Metr in out 2 ROADS/MOD 1 1 1 27 0 4 ROOF TOPS/FLAT 1 1 1 27 0 9 SIDEWALKS/MOD 1 1 1 27 0 END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > Active Sections # - # ATMP SNOW IWAT SLD IWG IQAL 2 0 0 1 0 0 0 4 0 0 1 0 0 0 9 0 0 1 0 0 0 END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR # - # ATMP SNOW TWAT SLD IWG IQAL 2 0 0 4 0 0 0 1 9 4 0 0 4 0 0 0 1 9 9 0 0 4 0 0 0 1 9 END PRINT -INFO TWAT-PARM1 <PLS > IWATER variable monthly parameter value flags # - # CSNO RTOP VRS VNN RTLI 2 0 0 0 0 0 4 0 0 0 0 0 9 0 0 0 0 0 END TWAT-PARMl 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 23 IWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC 2 400 0.05 0.1 0.08 4 400 0.01 0.1 0.1 9 400 0.05 0.1 0.08 END IWAT-PARM2 TWAT-PARM3 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN 2 0 0 4 0 0 9 0 0 END TWAT-PARM3 IWAT-STATEI <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS 2 0 0 4 0 0 9 0 0 END IWAT-STATEI END IMPLND SCHEMATIC <-Source-> <--Area-=> <-Target-> <Name> # <-factor--> <Name> # Basin 2*** PERLND 17 0.067 COPY 501 PERLND 17 0.067 COPY 501 IMPLND 2 0.024 COPY 501 IMPLND 4 0.089 COPY 501 IMPLND 9 0.002 COPY 501 ******Routing****** END SCHEMATIC MBLK Tbl# 12 13 15 15 15 NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** # - #<------------------ >< --- > User T-series Engl Metr LKFG *** in out *** END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG *** END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ******************* PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section *** 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 24 # - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 *** <------ ><-------- ><--------><--------><--------><--------><--------> *** END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <---><---><---><---><---> *** <---><---><---><---><---> END HYDR-INIT END RCHRES SPEC -ACTIONS END SPEC -ACTIONS FTABLES END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # *** WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> #'#<-factor->strg <Name> # <Name> tem strg strg*** COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL COPY 501 OUTPUT MEAN 1 148.4 WDM 801 FLOW ENGL REPL END EXT TARGETS MASS -LINK <Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** MASS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 12 MASS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS -LINK 13 MASS -LINK 15 IMPLND IWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 15 END MASS -LINK END RUN 2021.2.1-Karnafel 2/3/2021 5:07:26 PM Page 25 lmm�� 20212 1 -Karnafel 2/3/2021 5:07:26 PM Page 26 20212 1 -Karnafel 2/3/2021 5:07:26 PM Page 27 Legal Notice This program and accompanying documentation are provided 'as -is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright @ by: Clear Creek Solutions, Inc. 2005-2021; All Rights Reserved. Clear Creek Solutions, Inc. 6200 Capitol Blvd. Ste F Olympia, WA. 98501 Toll Free 1(866)943-0304 Local (360)943-0304 0 0 • 20212 1 -Karnafel 2/3/2021 5:07:26 PM Page 26 Project Name: 2021.2.1 -ROW Site Name: Site Address: City: Report Date: 2/3/2021 Gage: Seatac Data Start: 1948/10/01 Data End: 2009/09/30 Timestep: 15 Minute Precip Scale: 1.000 Version Date: 2019/09/13 Version: 4.2.17 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POCII: 50 Year 202121-ROW 2/3/2021 8:09:08 AM Page 2 Landuse Basin Data Predeveloped Land Use Pre Exg (Exclude Exg Imp) Bypass: No GroundWater: No Pervious Land Use acre C, Forest, Mod 0.03 Pervious Total 0.03 Impervious Land Use acre Impervious Total 0 Basin Total 0.03 Element Flows To: Surface Interflow Groundwater 202121-ROW 2/3/2021 8:09:08 AM Page 3 Mitigated Land Use ROW (Exclude Exg Imp) Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Mod 0.02 Pervious Total 0.02 Impervious Land Use acre ROADS MOD 0.002 SIDEWALKS MOD 0.008 Impervious Total 0.01 Basin Total 0.03 Element Flows To: Surface Interflow Groundwater 202121-ROW 2/3/2021 8:09:08 AM Page 4 Routing Elements 202121-ROW 2/3/2021 8:09:08 AM Page 5 202121-ROW 2/3/2021 8:09:08 AM Page 6 Analysis Results POC I 00 0,5 1 2 5 10 n 50 70 00 N 95 w 39 n,� ido Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.03 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0.02 Total Impervious Area: 0.01 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.000893 5 year 0.001464 10 year 0.00183 25 year 0.002267 50 year 0.002569 100 year 0.002851 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.00612 5 year 0.008457 10 year 0.010158 25 year 0.012488 50 year 0.014358 100 year 0.016346 AnnualPeaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 0.001 0.009 1950 0.001 0.009 1951 0.002 0.005 1952 0.001 0.004 1953 0.000 0.004 1954 0.001 0.005 1955 0.001 0.005 1956 0.001 0.005 1957 0.001 0.006 1958 0.001 0.005 202121-ROW 2/3/2021 8:09:08 AM Page 7 1959 0.001 0.004 1960 0.001 0.006 1961 0.001 0.005 1962 0.000 0.004 1963 0.001 0.006 1964 0.001 0.005 1965 0.001 0.007 1966 0.001 0.004 1967 0.001 0.009 1968 0.001 0.009 1969 0.001 0.006 1970 0.001 0.006 1971 0.001 0.007 1972 0.001 0.008 1973 0.001 0.003 1974 0.001 0.007 1975 0.001 0.007 1976 0.001 0.005 1977 0.000 0.005 1978 0.001 0.006 1979 0.000 0.007 1980 0.002 0.012 1981 0.001 0.006 1982 0.001 0.010 1983 0.001 0.006 1984 0.001 0.004 1985 0.000 0.005 1986 0.002 0.005 1987 0.001 0.006 1988 0.001 0.004 1989 0.000 0.006 1990 0.003 0.015 1991 0.002 0.012 1992 0.001 0.005 1993 0.001 0.004 1994 0.000 0.004 1995 0.001 0.005 1996 0.002 0.008 1997 0.002 0.006 1998 0.000 0.006 1999 0.002 0.014 2000 0.001 0.006 2001 0.000 0.006 2002 0.001 0.008 2003 0.001 0.008 2004 0.001 0.013 2005 0.001 0.005 2006 0.001 0.005 2007 0.002 0.014 2008 0.003 0.011 2009 0.001 0.007 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predevelloped Mitigated 1 0.0032 0.0153 2 0.0030 0.0142 3 0.0024 0.0140 202121-ROW 2/3/2021 8:09:40 AM Page 8 4 0.0023 0.0130 5 0.0020 0.0117 6 0.0019 0.0116 7 0.0017 0.0109 8 0.0017 0.0096 9 0.0017 0.0093 10 0.0015 0.0091 11 0.0015 0.0089 12 0.0014 0.0087 13 0.0014 0.0085 14 0.0014 0.0083 15 0.0013 0.0082 16 0.0013 0.0080 17 0.0012 0.0071 18 0.0012 0.0070 19 0.0012 0.0069 20 0.0011 0.0069 21 0.0011 0.0067 22 0.0010 0.0067 23 0.0010 0.0065 24 0.0010 0.0065 25 0.0010 0.0065 26 0.0010 0.0065 27 0.0009 0.0062 28 0.0009 0.0061 29 0.0009 0.0060 30 0.0008 0.0060 31 0.0008 0.0059 32 0.0008 0.0058 33 0.0008 0.0057 34 0.0008 0.0056 35 0.0008 0.0056 36 0.0007 0.0055 37 0.0007 0.0055 38 0.0007 0.0055 39 0.0007 0.0054 40 0.0007 0.0054 41 0.0007 0.0053 42 0.0007 0.0053 43 0.0007 0.0051 44 0.0006 0.0051 45 0.0006 0.0051 46 0.0006 0.0050 47 0.0006 0.0050 48 0.0006 0.0050 49 0.0006 0.0049 50 0.0006 0.0047 51 0.0005 0.0045 52 0.0005 0.0043 53 0.0005 0.0042 54 0.0005 0.0041 55 0.0004 0.0040 56 0.0004 0.0038 57 0.0004 0.0038 58 0.0003 0.0037 59 0.0002 0.0036 60 0.0001 0.0035 61 0.0001 0.0032 2021.2.1-ROW 2/3/2021 8:09:40 AM 202121-ROW 2/3/2021 8:09:40 AM Page 10 Flow(cfs) Predev mit Percentage Pass/Fail 0.0004 17139 88272 515 Fail 0.0005 15548 83202 535 Fail 0.0005 14095 78112 554 Fail 0.0005 12838 73813 574 Fail 0.0005 11582 69514 600 Fail 0.0006 10555 65771 623 Fail 0.0006 9574 62049 648 Fail 0.0006 8778 58819 670 Fail 0.0006 8036 55525 690 Fail 0.0006 7362 52723 716 Fail 0.0007 6759 49986 739 Fail 0.0007 6194 47333 764 Fail 0.0007 5747 45002 783 Fail 0.0007 5313 42692 803 Fail 0.0007 4934 40639 823 Fail 0.0008 4569 38650 845 Fail 0.0008 4250 36874 867 Fail 0.0008 3961 35142 887 Fail 0.0008 3645 33431 917 Fail 0.0009 3397 31912 939 Fail 0.0009 3133 30351 968 Fail 0.0009 2924 29025 992 Fail 0.0009 2706 27698 1023 Fail 0.0009 2492 26501 1063 Fail 0.0010 2314 25260 1091 Fail 0.0010 2137 24169 1130 Fail 0.0010 1978 23121 1168 Fail 0.0010 1827 22116 1210 Fail 0.0010 1706 21062 1234 Fail 0.0011 1578 20035 1269 Fail 0.0011 1445 19175 1326 Fail 0.0011 1325 18296 1380 Fail 0.0011 1235 17535 1419 Fail 0.0012 1147 16816 1466 Fail 0.0012 1086 16129 1485 Fail 0.0012 1022 15466 1513 Fail 0.0012 948 14803 1561 Fail 0.0012 888 14224 1601 Fail 0.0013 825 13625 1651 Fail 0.0013 764 13062 1709 Fail 0.0013 725 12581 1735 Fail 0.0013 675 12138 1798 Fail 0.0013 627 11665 1860 Fail 0.0014 589 11154 1893 Fail 0.0014 552 10739 1945 Fail 0.0014 506 10329 2041 Fail 0.0014 470 9982 2123 Fail 0.0015 427 9616 2251 Fail 0.0015 388 9272 2389 Fail 0.0015 356 8932 2508 Fail 0.0015 328 8609 2624 Fail 0.0015 298 8325 2793 Fail 0.0016 270 8014 2968 Fail 0.0016 242 7717 3188 Fail 202121-ROW 2/3/2021 8:09:40 AM Page 11 0.0016 218 7428 3407 Fail 0.0016 198 7184 3628 Fail 0.0016 173 6924 4002 Fail 0.0017 152 6669 4387 Fail 0.0017 130 6438 4952 Fail 0.0017 119 6203 5212 Fail 0.0017 104 6017 5785 Fail 0.0018 95 5826 6132 Fail 0.0018 84 5636 6709 Fail 0.0018 74 5441 7352 Fail 0.0018 69 5268 7634 Fail 0.0018 61 5082 8331 Fail 0.0019 53 4945 9330 Fail 0.0019 46 4768 10365 Fail 0.0019 39 4607 11812 Fail 0.0019 30 4470 14900 Fail 0.0019 25 4295 17180 Fail 0.0020 22 4141 18822 Fail 0.0020 20 3985 19925 Fail 0.0020 17 3859 22700 Fail 0.0020 14 3728 26628 Fail 0.0021 12 3621 30175 Fail 0.0021 9 3508 38977 Fail 0.0021 7 3401 48585 Fail 0.0021 7 3298 47114 Fail 0.0021 7 3185 45500 Fail 0.0022 6 3084 51400 Fail 0.0022 6 3001 50016 Fail 0.0022 6 2900 48333 Fail 0.0022 6 2817 46950 Fail 0.0022 6 2712 45200 Fail 0.0023 5 2627 52540 Fail 0.0023 5 2554 51080 Fail 0.0023 5 2488 49760 Fail 0.0023 5 2421 48420 Fail 0.0024 5 2355 47100 Fail 0.0024 5 2299 45980 Fail 0.0024 5 2239 44780 Fail 0.0024 4 2182 54550 Fail 0.0024 4 2119 52975 Fail 0.0025 3 2061 68700 Fail 0.0025 3 2000 66666 Fail 0.0025 3 1942 64733 Fail 0.0025 3 1887 62900 Fail 0.0025 3 1840 61333 Fail 0.0026 3 1787 59566 Fail The development has an increase in flow durations from 1 /2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. 2021.2.1-POW 2/3/2021 8:09:40 AM Page 12 Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. 202121-ROW 2/3/2021 8:09:40 AM Page 13 M� = LID Technique Usedfor Total Volume Volume Infiltration Cumulative Percent Water Quality Percent Comment Treatment'? Needs Through Volume Volume Volume Water Quality Treatment Facility (ac-ft) Infiltration Infiltrated Treated (a c-ft) (a c-ft) Credit Total Volume lnflltrated 10.00 U10 0.00, 04D 0.00 0% No -Treat Credit Compliance withILID Duration StandardS%02-yrto, 50% of Analysis Z-Yf Result= Failed 202121-ROW 2/3/2021 8:09:40 AM Page 14 Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. 141PLI1Changes • IMPLND changes have •- mada 202121-ROW 2/3/2021 8:09:49 AM Page 15 Wei =0 Predeveloped Schematic 202121-ROW 2/3/2021 8:09:49 AM Page 16 202121-ROW 2/3/2021 8:09:50 AM Page 17 r .ice op.d UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 END GLOBAL FILES <File> <Un#> END FILES OPN SEQUENCE 2009 09 30 UNIT SYSTEM 1 <-----------File Name ------------------------------>*** *** INGRP INDELT 00:15 PERLND 11 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #<---------- Title -------- >***TRAN PIVL DIG1 FILL 1 Pre Exg (Exclude Exg Imp) MAX END DISPLY-INFO1 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE FARM # # K *** END FARM END GENER PERLND GEN-INFO PYR DIG2 FIL2 YRND 1 2 30 9 <PLS ><------- Name ------- >NBLKS Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** 11 C, Forest, Mod 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC *** 11 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC ********* 11 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO 2021.2.1-ROW 2/3/2021 8:09:51 AM Page 18 PWAT-PARMl <PLS > PWATER variable monthly parameter value flags *** # - # CSNO RTOP UZFG VCS VUZ VNN VIEW VIRC VLE INFC HWT *** 11 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 11 0 4.5 0.08 400 0.1 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 *** # - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 11 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 *** # - # CEPSC UZSN NSUR INTFW IRC LZETP *** 11 0.2 0.5 0.35 6 0.5 0.7 END PWAT-PARM4 PWAT-STATEI <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** # - # *** CEPS SURS UZS IFWS LZS AGWS 11 0 0 0 0 2.5 1 END PWAT-STATEI END PERLND IMPLND GEN-INFO <PLS ><------- Name ------- > Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW IWAT SLD IWG IQAL *** END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR # - # ATMP SNOW TWAT SLD IWG IQAL ********* END PRINT -INFO TWAT-PARM1 <PLS > IWATER variable monthly parameter value flags *** # - # CSNO RTOP VRS VNN RTLI *** END TWAT-PARM1 IWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC END IWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN END IWAT-PARM3 TWAT-STATEI <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS END TWAT-STATEI GWVS 0 20212.1-R OW 2/3/2021 8:09:51 AM Page 19 END IMPLND SCHEMATIC <-Source-> <Name> # Pre Exg (Exclude Exg Imp)*** PERLND 11 PERLND 11 ******Routing****** END SCHEMATIC <--Area--> <-Target-> MBLK <-factor-> <Name> # Tbl# 0.03 COPY 501 12 0.03 COPY 501 13 NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** # - #<------------------ >< --- > User T-series Engl Metr LKFG *** in out *** END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG,HTF'G SDFG GQFG OXFG NUFG PKFG PHFG *** END ACTIVITY PRINT -INFO <PLS > **********'******* Print -flags ******************* PIVL PYR # - # HYDR ADCA CONSHEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section *** # - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 *** <------ ><-------- ><--------><--------><--------><--------><--------> *** END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <---><---><---><---><---> *** <---><---><---><---><---> END HYDR-INIT END RCHRES SPEC -ACTIONS END SPEC -ACTIONS FTABLES END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # *** WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC 2021.2.1-ROW 2/3/2021 8:09:51 AM Page 20 WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL END EXT TARGETS MASS -LINK <Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** MASS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 12 MASS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS -LINK 13 END MASS -LINK END RUN 2021.2.1-POW 2/3/2021 8:09:52 AM Page 21 Mitigated UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 END GLOBAL FILES <File> <Un#> END FILES OPN SEQUENCE 2009 09 30 UNIT SYSTEM 1 <-----------File Name ------------------------------>*** *** INGRP INDELT 00:15 PERLND 17 IMPLND 2 IMPLND 9 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INF01 # - #<---------- Title ---------- >***TRAN PIVL DIG1 FIL1 1 ROW (Exclude Exg Imp) MAX END DISPLY-INF01 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE FARM # # K *** END PARM END GENER PERLND GEN-INFO PYR DIG2 FIL2 YRND 1 2 30 9 <PLS ><------- Name ------- >NBLKS Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** 17 C, Lawn, Mod 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR RHOS TRAC *** 17 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR RHOS TRAC ********* 17 0 0 4 0 0 0 0 0 0 0 0 0 1 9 2021.2.1-ROW 2/3/2021 8:09:52 AM Page 22 END PRINT -INFO PWAT-PARM1 <PLS > PWATER variable monthly parameter value flags *** # - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT *** 17 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 17 0 4.5 0.03 400 0.1 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 *** # - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 17 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 *** # - # CEPSC UZSN NSUR INTFW IRC LZETP *** 17 0.1 0.25 0.25 6 0.5 0.25 END PWAT-PARM4 PWAT-STATEI <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** # - # *** CEPS SURS UZSIFWS LZS AGWS GWVS 17 0 0 0 0 2.5 1 0 END PWAT-STATEI END PERLND IMPLND GEN-INFO <PLS ><------- Name ------- > Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** 2 ROADS/MOD 1 1 1 27 0 9 SIDEWALKS/MOD 1 1 1 27 0 END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW IWAT SLD IWG IQAL *** 2 0 0 1 0 0 0 9 0 0 1 0 0 0 END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR # - # ATMP SNOW TWAT SLD IWG IQAL ********* 2 0 0 4 0 0 0 1 9 9 0 0 4 0 0 0 1 9 END PRINT -INFO IWAT-PARM1 <PLS > IWATER variable monthly parameter value flags *** # - # CSNO RTOP VRS VNN RTLI *** 2 0 0 0 0 0 9 0 0 0 0 0 END IWAT-PARM1 TWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC 2 400 0.05 0.1 0.08 9 400 0.05 0.1 0.08 2021.2.1-ROW 2/3/2021 8:09:52 AID Page 23 END IWAT-PARM2 TWAT-PARM3 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN 2 0 0 9 0 0 END IWAT-PARM3 IWAT-STATEl <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS 2 0 0 9 0 0 END TWAT-STATEI SCHEMATIC <-Source-> <--Area--> <-Target-> MBLK *** <Name> # <-factor-> <Name> # Tbl# *** ROW (Exclude Exg Imp)*** PERLND 17 0.02 COPY 501 12 PERLND 17 0.02 COPY 501 13 IMPLND 2 0.002 COPY 501 15 IMPLND 9 0.008 ' COPY 501 15 ******Routing****** END SCHEMATIC NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # *** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** # - #<------------------ >< --- > User T-series Engl Metr LKFG *** in out *** END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG *** END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ******************* PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section *** # - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 *** <------ ><-------- ><--------><--------><--------><--------><--------> *** END HYDR-PARM2 2021.2.1-POD! 2/3/2021 8:09:52 AM Page 24 HYDR-INIT RCHRES Initial conditions for each HYDR section *** # - # *** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <---><---><---><---><---> *** <---><---><---><---><---> END HYDR-INIT END RCHRES SPEC -ACTIONS END SPEC -ACTIONS FTABLES END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # *** WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** COPY 1 OUTPUT MEAN 1 1 48.4. WDM 701 FLOW ENGL REPL COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL END EXT TARGETS MASS -LINK <Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** MASS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 12 MASS -LINK 13' PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS -LINK 13 MASS -LINK 15 IMPLND IWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 15 END MASS -LINK END RUN 2021.2.1-POW 2/3/2021 8:09:52 AM Page 25 lmm�� 202121-ROW 2/3/2021 8:09:52 AM Page 26 202121-ROW 2/3/2021 8:09:52 AM Page 27 Legal Notice This program and accompanying documentation are provided 'as -is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright @ by: Clear Creek Solutions, Inc. 2005-2021; All Rights Reserved. Clear Creek Solutions, Inc. 6200 Capitol Blvd. Ste F Olympia, WA. 98501 Toll Free 1(866)943-0304 Local (360)943-0304 0 0 • 202121-ROW 2/3/2021 8:09:52 AM Page 28 APPENDIX F: SPECIAL REPORTS PIERSON DRIVEWAY TECHNICAL INFORMATION REPORT FILE No. 12-101 079-00-PC Rreparect t))/- Ed McCarthly. R.E., P.S. 9957 1.71st Avenwe SE Renton. WA 98059 TeL (425) 271-5734 Fax (425) 271-3432 PreparecIf" r" Rich,ard Pierson 35:1-6 & 336th Street Federa� Way, WA 98198 J an u a ry 3,1-, 2 0,',1- 3 Pierson Driveway TECHNICAL INFORMATION REPORT FILE No. 12-101079-00-PC Prepared by: Ed McCarthy, P.E., P.S. 9957 171st Avenue SE Renton, WA 98059 Tel. (425) 271-5734 Fax (425) 271-3432 Submitted to: City of Federal Way Community and Economic Development Department 33325 8th Avenue South Federal Way, WA 98003 January 31, 2013 C P war 0 TABLE OF CONTENTS LProject Overview .............................................................................................................. l-1 2. Conditions and Requirements Summary ------------------------.. 2-1 l(lffsite Analysis -------------------------------------. 3-1 4. Flow Control and Water Quality [uoUitn Analysisand Design -------------4-1 5. Conveyance System Analysis and Design ------------------------5-] 6.8oeciu1 Reports and Studies .............................................................................................. 0-1 7. Other Permits .................................................................................................................... 7-L 0.ESC Analysis and Design --------------------------------.N-1 9.I3ond Quantities and Facility Summary -------------------------.9-1 \O. Operationsand Maintenance Manual ........................................................................... |0-| \LRekereocey --------------------------------------- ll-\ \2. Appendices Appendix A. Photos ofthe Project Site AnnendixB. Flow Control Design Appendix C. KCRTSDocunentutioo AnpeudizD. Hydrologic Model Documentation A»peudixl3. Special Reports and Studies AnpoudixF. Stoonvvo1ecPollution Prevention and Spill Plan LIST OF TABLES Table 1. Existing and Developed Site Basin Conditions ................................................ 4-1 Table 2. Summary of Performance Standards................................................................ 4-5 Table 3. Summary of Special Reports and Studies......................................................... 6-1 Table 4. Summary of Other Permits Required................................................................ 7-1 Table 5. Summary of Maintenance Requirements for Stormwater Facilities ............... 10-1 LIST OF FIGURES Figure1. TIR Worksheet................................................................................................ 1-2 Figure2. Vicinity Map.................................................................................................... 1-7 Figure3. Basin Map........................................................................................................ 1-8 Figure4. Soils Map......................................................................................................... 1-9 Figure 5A. Predeveloped Basins..................................................................................... 4-3 Figure 5B. Developed Basins......................................................................................... 4-4 Figure 6. Stormwater Dispersion.................................................................................... 4-7 Figure7. TESC Plan..................................................................................................... 8-11 Figure 8. Site Improvement Bond Quantity Worksheet................................................. 9-2 Figure 9. Summary of Onsite Stormwater Facilities.................................................... 9-11 1. PROJECT OVERVIEW Project Description This report provides details for the stormwater design of the Pierson Driveway project. A summary of the project is provided in the TIR Worksheet (Figure 1). This technical information report (TIR) addresses the design of stormwater facilities and the offsite drainage analysis for the project. The project is required to comply with the 2009 King County Surface Water Design Manual with City of Federal Way amendments. Flow control best management practices (BMPs) including dispersion have been adopted for the drainage plan and follow Appendix C of the 2009 King County Surface Water Design Manual. The property includes Tax Parcel Nos. 06143600657, 6143600451 and 6143600450, that will be accessed off 334th Street. The project is located east of 33rd Place South, South of 3341h Street and north of South 336rh Street. The proposal for redevelopment includes constructing a private driveway to access two lots (Tax Parcel Nos. 61.43600451 and 6143600450) from South 334th Street. The driveway will be constructed within an existing easement on the property. Stormwater BMPs will also be constructed to meet the City's design requirements for flow control and water quality treatment. A 16-foot wide driveway pavement width within a 20-foot wide easement will be used to access the two parcels. Site Description The site has a total area of 2.74 acres. Two wetlands have been delineated in Lot C on the site. A northerly wetland collects onsite runoff and flows to the north and discharges to a storm system that continues to flow to the north, discharging to North Lake within 700 feet from the site (Figure 3). An onsite southerly wetland drains through offsite forested properties to the south. Adjacent properties to the west contribute minor sheet flow runoff to the site but no stormwater structures were identified on the property. Runoff from the east is largely collected in the stormwater system for North Lake Ridge development and conveyed around the project site. Based on the county's Sensitive Areas Map Folio (King County Department of Parks, Planning, and Resources, 1990), the site does not have inventoried wetlands, streams, flood hazard areas, seismic hazard areas, or coal mine hazard areas. Federal Way's critically sensitive areas maps identify wetlands associated with North Lake along the drainage course from the site's north basin. The downstream drainage courses from both the north and south onsite basins are tributary to Hylebos Creek (Figure 3). Stormwater Design The drainage plan includes dispersing stormwater by sheet flow from the edge of the driveway into the adjacent buffer. A flow path having at least 20 feet of native vegetation will be provided before runoff reaches the onsite wetland in the north basin. A portion of the driveway will be pervious pavement. The proposed driveway has an impervious area of less than 5,000 square feet. Water quality treatment is therefore not required. 1-1 Pierson Driveway TIR TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Figure 1. TIR Worksheet Project Owner Richard Pierson Phone (253) 927-7465 Address 3516 South 3361h Street Federal Way, WA 98198 Project Engineer Ed McCarthy Company Ed McCarthy, PE, PS Phone (425)271-5734 ❑ Landuse Services Subdivison / Short Subd. / UPD ❑- Building Services M/F / Commerical IK Clearing and Grading ❑ Right -of -Way Use ❑ Other Project Name Pierson Driveway Permit # Location Township 21 Range 4 Section 15 Site Address South 334th Street; Parcels 6143600657,6143600450,6143600451 ❑ DFW HPA ❑ COE 404 ❑ DOE Dam Safety ❑ FEMA Floodplain ❑ COE Wetlands 0 Other Wetland ❑ Shoreline Management ❑ Structural/ Rockery/Wall ❑ ESA Section 7 Part 5 PLAN AND REPORT INFORMATION Technical Information Report Site Improvement Plan (Engr. Plans) Type of Drainage Review Full / Targeted / Type (circle one): Full / Modified / (circle): Large Site Small Site Date (include revision 1-31-13 Date (include revision 1-31-13 dates): dates): Date of Final: Date of Final: Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket Description: (include conditions in TIR Section 2) Date of Approval: 1-2 TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes / No Start Date: Completion Date: Describer Community Plan: N/A Special District Overlays: N/A Drainage Basin: Hylebos Creek Basin Plan Stormwater Requirements: Covered by KCSWDM ❑ River/Stream ❑ Lake ❑- Wetlands ❑ Closed Depression ❑ Floodplain ❑ Other Part 10 SOILS Soil Type Slopes Erosion Potential Alderwood Flat Medium ❑ High Groundwater Table (within 5 feet) ❑ Sole Source Aquifer ❑ Other ❑ Seeps/Springs ❑ Additional Sheets Attached 1-3 TECHNICAL INFORMATION REPORT (TIR) WORKSHEET REFERENCE ❑ Core 2 — Offsite Analysis ❑ Sensitive/Critical Areas LIMITATION / SITE CONSTRAINT None ❑ SEPA None No 0 Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Threshold Discharge Area: North and south subbasins name or description) Core Requirements (all 8 apply) Discharge at Natural Location Number of Natural Discharge Locations: 1 Offsite Analysis Level: 1 / 2 / 3 dated: 12/10/12 Flow Control Level: 1 / 2 / 3 or Exempt after applying BMPs Incl. facility summary sheet Small Site BMPs Dispersion, pervious pavement Conveyance System Spill containment located at: N/A Erosion and Sediment Control ESC Site Supervisor: Ed McCarthy Contact Phone: 425-271-5734 Cell Phone: 425-736-6016 Maintenance and Operation Responsibility: Private / Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Provided: Yes / No Liability Water Quality Type: Not required / Basic / Sens. Lake / Enhanced Basic (include facility summary sheet) / Bog or Exemption No. Landscape Management Plan: Yes / No Special Requirements as applicable) Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None Requirements Name: Flood plain/Floodway Delineation Type: Major / Minor / Exemption / None 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: None Source Control Describe landuse: SFR (comm./industrial landuse) Describe any structural controls: N/A 1-4 TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Oil Control High -use Site: Yes / No Treatment BMP: Maintenance Agreement: Yes / No with whom? Other Drainage Structures Describe: Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION Clearing Limits Stabilize Exposed Surfaces 0 Cover Measures FX1 Remove and Restore Temporary ESC Facilities X F❑_� Perimeter Protection FX _� Clean and Remove All Silt and Debris, Ensure IK Traffic Area Stabilization Operation of Permanent Facilities L) Sediment Retention IK Flag Limits of SAO and Open Space L) Surface Water Collection Preservation Areas Ll Dewatering Control LJ Dust Control L) Flow Control Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Su mary and Sketch) Flow Control Type/Description Water Quality Type/Description L) Detention U Infiltration U Regional Facility U Shared Facility Flow Control BMPs Ll Other Ll Biofiltration LJ Wetpool U Media Filtration Ll Oil Control Ll Spill Control Other Dispersion, pervious pavementLJ 1-5 TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS ❑ Cast in Place Vault ❑ Drainage Easement ❑Retaining Wall ❑ Covenant ❑Rockery > 4' High IK Native Growth Protection Covenant Structural on Steep Slope ❑ Tract ❑Other ❑ Other Fart 17 SIGNATURE OF PROFESSIONAL ENGINEER 1, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. CclWar• d P CQrt �� 1-3i.-13 Signed/Date 1-6 > 308th St Stye/ Lake l 3p9tti:St, ., .S 370ih St ` S 31,0 : , t ` S 311th St c, N 315th St o N $315th Ln00 N S 316th Ln E S 316th PI 317th St m - LO , St m '0 _ 7� 3 ', c N y S 324th St `'�. c*? 40/7 a ��- a� ; h OIYmPic waY m GO , `V 3N, � �m 328th P c IX) _�� _ S 330 ZY North Lak1 S 33�1 t h- S 332nd St 333rd $t �. M S 336th St . ir S 340th St ' 07 5 341 st PI S 341st St,,:,, �0 � 5 344th St r N04 CO 347th P1 5,343th t c U) , S 350th St �Q S 357st St �nt Project Site .. S, 33'.. NO , Q u?; S 356th-St 11. v'C m:....r' S356thSt >' d. (. G ' a:nS 358th r nr N , S 316th St P,O , No. Vicinity Map Mz= Pierson Technical Information 11/12/12 9957171st Avenue SE Plat Report 1 2,000 Renton, Washington 98059 Federal Way, Washington Feet Phone: (425) 271-5734 Figure 2 TABLE 3, ,8 EQUIVALENCE BETWEEN S,(:.S SOIL TYPES AND KC" TS SOIL TYPES SGS Soil Type SGS Hydrologic Soil Group KCRTS Snail Group Notes Alderwood A B A C A D C Till Arents; Alderwood Material (AmB, AmC) C Till Arents; Everett Material (An) B Outwash 1 Beausite (BeC, BeD, BeF) C Till 2 Bellingham (Bh) D Till 3 Briscot (Br) D Till 3 Buckley (Bu) D Till 4 Earlmont (Ea) D Till 3 Edgewick (Ed') C Till 3 Everett (EvB, EvC, EvD, EwC) A/B Outwash 1 Indianola (InC, lnA, MD) A Outwash 1 Kitsap (KpB. KpC, KpD) C Till Klaus (KsC) C Outwash 1 Neilton (NeC) A Outwash 1 Newberg (Ng) B Till 3 Nooksack (Nk) C Till 3 Norma (No) D Till 3 Orcas (Or) D Wetland Oridia (Os) D Till 3 Ovall (OvC, OVD, OvF) C Till 2 Pilchuck (Pc) C Till 3 Puget (Pu) D Till 3 Puyallup (Py) B Till 3 Ragnar (RaC, RaD, RaC, RaE) B Outwash 1 Renton (Re) D Till 3 Salal (Sa) C Till 3 Sammamish (Sh) D Till 3 Seattle (Sk) D Wetland Shalcar (Sm) D Till 3 Si (Sn) C Till 3 Snohomish (So, Sr) D Till 3 Sultan (Su) C Till 3 Tukwila (Tu) D Till 3 Woodinville (Wo) D Till 3 Notes: 1. Where outwash soils are saturated or underlain at shallow depth (<5 feet) by glacial till, they should be treated as till soils. 2. These are bedrock sails, but calibration of HPF by King County DNR shows bedrock soils to have similar hydrologic response to till soils. 3. These are alluvial soils, some of which are underlain by glacial till or have a seasonally high water table. In the absence of detailed study, these soils should be treated as till soils. 4. Buckley soils are formed on the low -permeability Osceola mudflow. Hydrologic response is assumed to be similar to that of till soils. 1-10 Pierson Driveway TIR 2. CONDITIONS AND REQUIREMENTS SUMMARY A summary of design requirements for the project are presented in this section. Design Requirements The following is a summary of core and special requirements from the 2009 King County Surface Water Design Manual: Core Requirement 1: Discharge at the Natural Location Runoff from the driveway project drains to the north basin on the site. The existing flow path from the site will be maintained. Core Requirement 2: Off -site Analysis A Level 1 downstream drainage analysis is presented in Section 3 of this report. Core Requirement 3: Flow Control The site is entirely within the Hylebos Creek watershed. Conservation flow control standards are required based the City of Federal Way Flow Control Maps. Dispersion, an approved flow control BMP, will provide flow control for the proposed driveway. Core Requirement 4: Conveyance System The onsite stormwater conveyance system will be designed to convey at least the 25-year storm. Core Requirement 5: Erosion and Sedimentation Control Plan Proposed erosion and sedimentation control procedures are described in Section 8. Core Requirement 6: Maintenance and Operations The proposed system for managing stormwater will be privately maintained and operated. Recommended maintenance activities are provided in Section 10. Core Requirement 7: Financial Guarantees and Liability Calculations for bonds and liability requirements are provided in Section 9 of this report. Core Requirement 8: Water Quality The proposed driveway has an impervious area of no more than 5,000 square feet. Water quality treatment is therefore not required. 2-1 Pierson Driveway TIR Special Requirement 1: Other Adopted Area -Specific Requirements The site is within the Hylebos Creek watershed. The detention standards adopted for the project are consistent with the watershed's basin plan. Special Requirement 2: Flood Hazard Area Delineation The site is not within a FEMA 100-year floodplain or flood hazard area. Special Requirement 3: Flood Protection Facilities The project does not contain nor is it adjacent to a flood protection facility. Special Requirement 4: Source Control No source controls are proposed. Special Requirement 5: Oil Control The proposed development does not meet the definition of a high -use site requiring oil control. 2-2 Pierson Driveway TIR 3. OFFSITE ANALYSIS A Level 1 Downstream Drainage Analysis was prepared for the project in :December 2012 and is presented in this section. 3-1 Pierson Driveway TIR P.erson Driveway LEVEL 1 DOWNSTREAm DRAINAGE ANALYSIS FILE No. 12-101079-00-PC Prepared by: Ed McCarthy, ,P'S. 9S57171"Avenue GE Renton, VVA98059 Tel. (425)271-5734 Fax (425)271-3432 Submitted to: City of Federal Way Community and Economic Development Department 333258"'Avenue South Federal Way, WA 98003 December 10.2012 TABLE OF CONTENTS Task 1: Study Area Definition and Maps............................................................................1 Task 2: Resource Review.....................................................................................................1 Task3: Field Inspection.......................................................................................................2 Task 4: Drainage System Description and Problem Descriptions.......................................2 Task 5: Mitigation of Existing or Potential Problems.........................................................3 References..........................................................................................................................11 Appendix A. Downstream Drainage System LIST OF TABLES Table 1. Description of Downstream Conveyance System................................................9 LIST OF FIGURES Figure1. Vicinity Map........................................................................................................5 Figure2. Soils Map.............................................................................................................6 Figure3. Basin Map............................................................................................................7 Figure 4. Downstream Drainage Course.............................................................................8 i Pierson Driveway TASK 1: STUDY AREA DEFINITION AND MAPS Site Description The Pierson Driveway project consists of constructing a private driveway to access 2 currently vacant lots located in Federal Way (Figure 1). The site has two basins including a northerly basin that drains to North Lake and a southerly basin that ultimately which drains to a tributary to Hylebos Creek. The property address is 3516 South 3361h Street (Tax Parcel Nos. 06143600657, 6143600451 and 6143600450). The project is located east of 33rd Place South, South of 3341h Street and north of South 336th Street. The site is currently forested. The site is generally flat at an average elevation of 403 feet NGVD 29. Based on the King County Soil Survey (U.S. Department of Agriculture, 1973) the site and surrounding area consists of Alderwood soils (Figure 2). The site is surrounded by single-family residential development. The proposal for development includes constructing a private driveway to access two lots from South 334th Street. The driveway will be constructed within an existing easement on the property. Stormwater best management practices (BMPs) will also be applied to meet the City's design requirements. The site is vested under the 2009 King County Surface Water Design Manual. TASK 2: RESOURCE REVIEW Based on a review of available resources, including the King County's Sensitive Areas Map Folio (King County Department of Parks, Planning, and Resources, 1990) and resources available the City of Federal Way, the site and downstream system within 1 mile from the site are characterized as follows: ■ Critical Drainage Area Map Runoff from the site's north basin drains to North Lake, within the Hylebos Creek watershed. Runoff from the site's south basin drains to an offsite forested wetland to the south. ■ Floodplain/Floodway (FEMA) Maps The site is not within a mapped 100-year floodplain. The site has two basins, each of which drains to a tributary to Hylebos Creek. ■ Offsite Analysis Reports The downstream analyses for East Campus Residential South (ESM, January 1994) and East Campus Parcel 3 (ESM, October 1998) were used in helping to assess the drainage course downstream from the south basin of the project site. ■ Basin Plans The site is within the Hylebos Creek watershed. Stormwater standards for the site include Conservation Flow Control and Enhanced Water Quality Treatment in consideration of downstream receiving waters. Pierson Driveway ■ Sensitive Area Information Based on iMAP from the King County website and the Sensitive Areas Map Folio, the site is not located within a coal mine, 100-year floodplain, seismic, landslide, or wetland area. Federal Way's critically sensitive areas maps identify wetlands associated with North Lake along the drainage course from the site's north basin. Wetlands have been delineated by others on properties to east and south. The downstream drainage courses from the site's north and south basins are tributary to Hylebos Creek. ■ SWM Drainage Complaints A map and summary of registered drainage complaints are included in Appendix A. 1. No relevant complaints within one mile from the site were filed subsequent to 2002. ■ King County Soils Map Based on the King County Soil Survey (U.S. Department of Agriculture, 1973) the site and surrounding area consist of Alderwood soils (Figure 2). TASK 3: FIELD INSPECTION A downstream drainage analysis for the site is presented in this section. The site has drainage areas referred to in this report as the north and south basins (Figure 3). The drainage courses from the site were assessed on 12/5/12. The downstream conveyance system is described below and illustrated in Figure 4. Further descriptions of drainage features are summarized in Table 1. Upstream Drainage Sheet flow from adjacent properties to the west likely contributes runoff to the site but no stormwater structures were identified on the property. The tributary area to the west is low -density residential development and forestland. Runoff from offsite tributary areas, as well as from the site is collected in the onsite wetlands (Locations 1 and 8 in Figure 4; Table 1) and conveyed to the downstream drainage courses described below. A large subdivision, known as North Lake Ridge, is located to the east of the project site (Figure 4). Stormwater from the developed areas of North Lake Ridge is collected in a pipe system and conveyed to a stormwater pond in the south portion of the plat. The stormwater pond discharges to a wetland complex south of the Pierson project site. Onsite Drainage The site has a total area of 2.74 acres with two onsite basins. The site is forested and flat. Two wetlands have been delineated in Lot C on the site. Runoff from the site's northerly basin (Location 1; Photo 1 in Appendix A.2) discharges to a storm system that continues to flow to the north, discharging to North Lake within 700 feet from the site (Figure 3). Runoff from the site's southerly basin (Location 8; Photos 5 and 6) discharges from the site in a shallow open channel and flows through an offsite forested wetland to the south. 2 Pierson Driveway Downstream Drainage Course — North Basin Runoff leaves the site's north basin through an 18-inch diameter culvert under South 334th Street (Location 3; Photo 2). Drainage is conveyed to the north in a pipe system (Location 4). The pipe system discharges to an open channel within a landscaped area (Location 5; Photo 3). The shallow open channel is lined with concrete and has rock lined sidewalls. The channel is low -gradient and meanders through the back yards of surrounding residences (Location 6; Photo 4) and ultimately discharges to North Lake (Location 7) approximately 740 feet from the site. Downstream Drainage Course — South Basin Runoff leaves the site's southerly basin in a shallow open channel (Location 9; Photo 6). The channel conveys drainage in a southerly direction along the edge of a church parking lot (Location 10; Photo 7). The channel broadens (Location 11) before entering a large forested wetland (Location 12). The wetland has dense brush undergrowth and standing water with no distinct flow path. Water collects at the southwest corner of the wetland and enters a constructed channel (Location 13; Photo 8) within the right-of-way (ROW) along SR-18. Access to the ROW channel was prevented by a chain link fence. Based on descriptions of the channel by others (ESM, January 2004), it is apparently lined with asphalt. At a distance of about 1,500 feet from the site, drainage enters a closed pipe system (ESM, October 1998). There may be a blockage in the pipe system that was causing a backwater into the ROW channel at the time of the investigation. TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS Downstream Drainage Complaints Drainage complaints along the downstream system were investigated using King County iMap. A summary of the drainage complaints is provided in Table A.1 of Appendix A.1. Based on available information, the drainage -related complaints that are relevant to the study reach would likely be classified as Type 1 problems, or conveyance system nuisance problems. No substantial drainage complaints were identified in the review of county's files. Since complaint 2003-0005 was filed, the stormwater system was re -aligned to accommodate the property owner's plans for lot development. Under the City's jurisdiction, a structure and length of pipe was added to the conveyance system. Stormwater Design The project site is in an area requiring Conservation Flow Control standards. Flow control best management practices (BMPs), including flow dispersion and pervious pavement, will be incorporated into the drainage design to meet requirements for best management practices. There are no significant drainage complaints or obvious drainage -related problems in the downstream system, other than a potentially plugged pipe along the downstream drainage course to the south. The Pierson Driveway selected BMPs will maintain natural drainage paths and help sustain the hydrology of onsite wetlands. Water Quality Treatment The site is in an area mapped for Enhanced Water Quality Treatment. The surface area of pollution generating impervious surfaces associated with the driveway project will be kept to less than 5,000 square feet. Therefore, no water treatment, other than that provided by dispersion is required. Based on the site topography and organics present in the upper soil horizon, it is expected that dispersion will be an effective measure in improving water quality before stormwater reaches wetlands on the site. 4 Pierson Driveway S 332nd Proip(-t 3�O S 31Qth St >1 rt 1 .. s _ _�_ _ 3 � I rHylebos- f Green Watershed � � , _ - '- - ' cif ' _J;Jx sir f,f cE t 42 _.. - J Est: e. r xJ �. % 3rdS, .... I i \1 , \ � =V�\ ' . . r 'North � orth Basin South f m i Basin '— OSite I Table 1. Description of Downstream Conveyance System Site Visit on 12/5/12 Basin: North Lake Weather: Clear Location Drainage Drainage Slope Distance from Existing Potential Observations of Field ID Component Type, Component Site Discharge Problems Problems Inspector, Resource Name, ,and Size Description Reviewer, or Resident See Fig. 4 Type: sheet flaw, swale, drainage basin, 1/4 mile--1,320 ft ! constrictions, under capacity, ponding, tributary area, likelihood of stream, channel, pipe. vegetation, cover, depth,, C/o) (FT) overtopping, scouring, bank sloughing, problem, overflow Size: diameter, width type of sensitive area sedimentation, incision, other erosion pathways, potential impacts ' 1 Onsite north basin — Forestland/wetland 0-1 - Shallow standing water sheet flow onsite in wetland 2 Onsite — north basin — Stream/ditch 0-1 - Low gradient ditch flows channel flow to north 3 18-inch diameter Culvert crossing 1 0-40 Potential for No signs of overtopping concrete pipe plugging with leaf debris 4 18-inch diameter Storm pipe and catch 1 40-340 No signs of erosion concrete pipe basin system 5 18-inch diameter Pipe outfall to open 1 340 plastic pipe channel. 6 Open channel through Channel has concrete 1 340-740 Channel pedestrian Channel pedestrian landscaped area lining and rock crossing has crossing includes 12- Width: 1' sidewalls potential for inch diameter culvert Depth: 1' creating flow Side slope: 1:1 constrictions 7 North Lake Open water 0 740 +- I Table 1 (continued) Basin: Tributary to Hylebos Creek Location Drainage Drainage dope distance from Existing Potential Observations of Field ID Component Type, Component Site Discharge; Problems Problems Inspector, Resource Name, and Size Description Reviewer, or Resident See Fig. 4 Type: sheet flow, Swale, drainage basin, 1/4 mile=1,320 ft constrictions, under capacity, ponding, tributary area, likelihood of stream, channel, pipe. vegetation, cover, depth,; (%) (FT) overtopping, scouring, bank sloughing, problem, overflow Size: diameter, width DTe of sensitive area sedimentation, incision, other erosion pathways, potential impacts 8 Onsite — south basin — Forestland/wetland 0-1 - Shallow standing water sheet flow onsite in wetland 9 Ditch Shrub 1 0-100 Drainage from wetland Width: 1' concentrates into shallow Depth: 0.5' ditch as it flows south Side slope: 5:1 off site 10 Ditch Shrub/grass 0.5 100-300 Low -gradient channel — Width: 1' no signs of erosion Depth: 0.5' Side slope: 5:1 11 Stream channel Channel broadens as it 0.5 300-500 Width: 3' enters forested area•, Depth: 0.5' forest cover Side slope: 5:1 12 Wetland Forested wetland — 0.5 500-1,300 Width: 6' forest with underbrush Depth: 24' Side slope: 3:1 13 Constructed channel Forest/shrub 0.5 1,300-2,300 Potential blockage Width: 6' drainage course enters in downstream Depth: 2-4' ROW along north side pipe system Side slope: 3:1 of SR-18 causing backwater into SR-18 ROW channel REFERENCES ESM, January 2004. Technical Information Report for East Campus Residential South. Federal Way, Wash. ESM, October 1998. Downstream Analysis for East Campus Parcel 3. Federal Way, Wash. King County Department of Natural Resources, 2005. King County Surface Water Design Manual. Seattle. King County Department of :Parks, Planning, and Resources, 1990. Sensitive Areas Map Folio. Seattle. U.S. Department of Agriculture, Soil Conservation Service, 1973. Soil Survey of King County Area, Washington. Seattle. 11 Pierson Driveway Appendix A. Downstream Drainage System Appendix A.1 Drainage Complaints Appendix A.2 Photos of the Site and Downstream System Pierson Driveway Table A.I. Summary of Downstream Drainage Complaints (within 3. mile from site) Complaint Number Date Location of Problem Description of Complaint 1988-0343 5/13/1988 3616 S 334" St Outlet to North Lake obstructed/damaged. Existing enclosed conveyance across private 1/2/2003 property; request to move drainage from lot. Approval to relocate storm pipe system was ultimately approved under City of Federal Way 2003-0005 3632 S 334th St jurisdiction. Note: Drainage complaints prior to 2002 have been archived by the county and their retrieval was not requested. Pierson Driveway P'O" N., Drainage Complaint Map MCC= -- Pierson Downstream Drainage 11/12/12 9957 171st Avenue SE Plat Analysis 490 Renton, Washington 98059 Figure A.1 Federal Way, Washington Feet I Phone: (425) 271-5734 1 KING COUNTY DRAINAGE INVESTIGATION REPORT FIELD INVESTIGATION FILE NO: 2003-0005 NAME: Ed Irvin ADDRESS: 3632 S 3341h St, Milton, WA 98354 PHONE: 252-627-0930 TH. BROS PG: 745D6 KROLL PAGE: 728W MAINT. DIV: 3 INITIALS:MAG On site 01-08-03. The existing catch basin in the access road was not flooding at the time. It had been dry for several days prior to my site visit. Upon locating the outlet pipe I noted it was plugged with leaves and stick debris. I removed the plug and the pipe flowed normally. I could not see anything more restricting the flow. I spoke with Mr. Irvin on the telephone while at the site. He indicated he is trying to get the parcel to pass a perk test. I did see a number of holes dug for perk testing. Mr. Irvin stated the parcel would not perk because of the water being conveyed from the basin through his property. He wants to know why the county has a pipe running under his parcel. If he can get a positive perk he would like to build. He expressed concerns he won't be able to build with the pipe running under the property. Mr. Irving would like to know if there is an easement allowing roadside discharge onto his property or conveyance through his parcel. I could not locate any information indicating easements other than the road that services the parcels to the north of Mr. Irvin's parcel. North lake shore lands is an unrecorded plat. Mr. Irvin would request King County remove the outlet pipe or relocate the pipe along S. 334th St so his parcel is not impacted. 1W S 334th St 6 From: Lazaro, Desi Sent: Thursday, January 23, 2003 11:28 AM To: Holwegner, Margaret Subject: FW: 3632 S 334th St, Milton Margaret, We did not find anything at this location. -----Original Message ----- From: Meininger, Rick Sent: Monday, January 13, 2003 12:52 PM To: Lazaro, Desi Subject: RE: 3632 S 334th St, Milton Desi: Looking thru both Trackers and the Thos Bros, I find nothing at that location. RM -----Original Message ----- From: Lazaro, Desi Sent: Monday, January 13, 2003 12:40 PM To: Jacobovitch, Jake; Meininger, Rick Cc: Holwegner, Margaret Subject: FW: 3632 S 334th St, Milton Rick, can you please check our records and help Margaret? Jake, do you happen to know if County installed the drainage system at the above location? See e-mail below. Thanks. Desi -----Original Message ----- From: Holwegner, Margaret Sent: Monday, January 13, 2003 10:07 AM To: Lazaro, Desi Subject: 3632 S 334th St, Milton Hi Desi, I have a question on some existing drainage on S 334th St. At 3632, there is a private drive on the north side of the road that serves three parcels. There is a type one catch basin in the middle of the drive on the county ROW. A 12" concrete tile outlets the basin approximately 120' cutting across parcel 6143600205. There are no easements that I can find or any indication that this was a county install or project. The property owner has owned this parcel since the early 70's. It was existing at that time. He wants to develop the lot now and can't get a positive perk on the site. The pipe from the basin cuts directly through at a diagonal on his parcel from SW to the NE corner. At the outlet it daylights to a conveyance ditch that carries flow to North Lake. I have attached a copy of my Drainage investigation report to aid with any questions. I was hoping you could tell me if this was a county install or if the county has any part in this drainage. The North Shore Lands Plat is unrecorded so I have been unable to find county involvement. I appreciate any information you can share. Many Thanks, Margaret Margaret Holwegner Engineer 1/Drainage Investigator Storm water Services Section Appendix A.2 Photos of the Downstream System Pierson Driveway Appendix A.2: Photos of the Downstream System ♦ Photo Number 1 Date of Photo: 12-5-12 Location: North basin. Near Location 1 in Figure 4. Description: The north onsite basin is flat forestland with some wetlands. ♦ Photo Number 2 Date of Photo: 12-5-12 Location: Culvert draining north basin on site. Location 3 in Figure 4. Description: An 18-inch diameter culvert conveys drainage from the site's north basin to under S. 334t' Place. Appendix A.2: Photos of the Downstream System ♦ Photo Number 3 Date of Photo: 12-5-12 Location: Location 5 in Figure 4. Description: The stormwater pipe system that starts onsite discharges to an open channel with a concrete lining. ♦ Photo Number 4 Date of Photo: 12-5-12 Location: Location 6 in Figure 4. Description: A constructed open channel conveys drainage through a landscaped area to North Lake. Appendix A.2: Photos of the Downstream System ♦ Photo Number 5 Date of Photo: 12-5-12 Location: Location 8 in Figure 4. Description: The south onsite basin is flat forestland with. some wetlands. ♦ Photo Number 6 Date of Photo: 12-5-12 Location: Location 9 in Figure 4. Description: A shallow ditch conveys drainage away from the site's south basin. Appendix A.2: Photos of the Downstream System ♦ Photo Number 7 Date of Photo: 12-5-12 Location: Location 10 in Figure 4. Description: A low gradient open channel conveys drainage further south and then enters a large forested wetland. ♦ Photo Number 8 Date of Photo: 12-5-12 Location: Location 13 in Figure 4. Description: A constructed channel within SR-18 conveys drainage to the southwest. A potentially plugged pipe in the downstream system is backing up water in the ROW channel. 4. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Part A: Existing Site Hydrology The site has a total area of 2.74 acres (Figure 5A). The site is generally flat at an average elevation of 403 feet NGVD 29. Based on the King County Soil Survey (U.S. Department of Agriculture, 1973) the site and surrounding area consists of Alderwood soils (Figure 4). The site is surrounded by single-family residential development. The site is located entirely in the Hylebos Creek watershed. The site has two basins including a northerly basin that drains to North Lake and a southerly basin that ultimately drains to Hylebos Creek. Runoff from the north basin sheet flows to a ditch located in Lot C. The ditch discharges to a storm system located at the north end of Lot C. Runoff from the south basin sheet flows to a forested wetland located in the south portion of Lot C. Small tributary areas from both the west and east sheet flow onto the site. Cover types on the site include forest. A summary of cover type areas is provided in Table 1. The project area for the proposed driveway is within the site's north basin. Table 1. Existing and Developed Site Basin Conditions Existing Conditions Basin Till Forest (AC) Till Grass (AC) Imperv. (AC) Total (AC) Project area 0.15 0.00 0.00 0.15 Total 0.15 0.00 0.00 0.15 Developed Conditions Basin Till Forest (AC) Till Grass (AC) Imperv. (AC) Total (AC) Project Area 0.00 0.03 0.12 0.15 Total 0.00 0.03 0.12 0.15 Note: Developed areas are prior to assigning credits for flow control BMPs. Flow control BMPs will include pervious pavement and dispersion. After considering flow control BMPs, the effective impervious area will be 0.06 acre. Part B: Developed Site Hydrology A driveway with a total area of 6,580 square feet will be constructed. Of this area, at least 1,316 square feet will be landscape and 2,320 square feet will be pervious pavement. No more than 5,000 square feet will be conventional asphalt. Therefore, a pollution generating impervious area of 5,000 square feet or less will be constructed. The driveway enters the site from South 334th Street and is within the north basin on the site. The north basin represents a threshold discharge area. 4-1 Pierson Driveway TIR Existing drainage flow paths on the site will be maintained. Conservation flow control standards are required based on the city's flow control applications map (City of Federal Way). Flow control best management practices (BMPs), including pervious pavement and dispersion, will be incorporated into the drainage design to meet project requirements. The driveway will be graded to sheet flow from along its east edge to native vegetation. Water flowing from the surface of the driveway will be dispersed along the driveway and will flow through at least 20 feet of native vegetation. 4-2 Pierson Driveway TIR 0 40 80 Feet 0 m —._ ,, DESIGNED Figure 5A. Predeveloped Basins �99Sartven's'F ' 1 DRANRJ Renton, Washington 98059 APPROVED Pierson Driveway 425.271.5734 Fax 425.271.3432 O T HYDROLOGY HYDRAULICS ENGINEERING PROJECT MANAGER 0 40 80 Feet $ DESIGNED Figure 5B. Developed Basins McCarthy, PE, PS .Oy m 1 DRAWN 9957771stAvenueBE Remora, Washington 98059 c APPROVED Pierson Driveway 425.271.5734 Fax 425.271.3432 O 0 HYDROLOGY . HYDRAULICS • ENGINEERING PROJECT MANAGER Part C: Performance Standards A summary of flow control, conveyance, and water quality treatment performance standards for the project is presented in Table 2, below. Table 2. Summary of Performance Standards Category Performance Standard Source Flow Control ■ Conservation Flow Control ■ Surface Water Design Manual Section 5.3; Detention Facilities ■ Flow Control BMPs — flow . Surface Water Design dispersion and pervious Manual Section 5.2 pavement will be provided Conveyance System ■ Provide conveyance for ■ :Surface Water Design Capacity developed 25-year storm Manual Section 1.2.4.1 Water Quality ■ Driveway area is below ■ Surface Water Design Treatment Menu threshold of 5,000 square feet - Manual Section 1.2 no treatment required Source Control ■ NIA ■ Stormwater Pollution .Prevention Manual Oil Control ■ The site does not meet the ■ Surface Water Design definition of a high -use site Manual Section 1.3.5 4-5 Pierson Driveway TIR Part D: Flow Control System Flow Control BMPs Flow control BMP requirements will be met by providing dispersion for the entire driveway impervious area, or for a total of 0.1.5 acre. Tn addition, a portion of the driveway will be constructed of pervious pavement. After considering the attenuation provided by dispersion, the increase in the 15-minute 100-year peak flow rate on the site was predicted to be less than 0.10 cubic foot per second. Therefore, the flow control BMPs, as proposed, are the only flow control required for the project. Design Methodoloav KCRTS was used to predict flow rates from the project area under both forested and proposed developed conditions. Procedures and design criteria specified in the 2009 King County Surface Water Design Manual were followed for the hydrologic modeling. Descriptions of the stormwater system and details of the design analysis are provided below. A plan view of the stormwater dispersion system for the project is provided in Figure 6. For the hydrology assessment, the reduced KCRTS time series data set was used for the Sea-Tac rainfall region with a correction factor of 1.0. Documentation of the KCRTS input and output including descriptions of executable files and times series are listed in Appendix D. Paved driveway areas were modeled in KCRTS as 50 percent impervious and 50 percent till grass in modeling flow control BMPs. Under forested conditions, the 1.00-year peak flow rate from the project area was predicted to be 0.017 cubic foot per second. Under proposed developed conditions, with flow control BMPs in place, the 100-year peak flow rate from the project area was predicted to be 0.116 cubic foot per second (Appendix C.2). The predicted increase with developed conditions is less than 0.10 cubic foot per second. 4-6 Pierson Driveway TIR Figure 6. Stormwater Dispersion WEST ? OR ESMT 4i -1 '5 _� —2% WALL — 16"H SEE NOTE 4 WT PROFILE POINT 4 " POROUS HMA SEE NOTE 3 4" PERMEABLE GRAVEL SEE NOTE 6 EAST ESMT 2% DISPERSION GRAVEL OUTLET EX, GRADE GEOTEXTILE SEE NOTE 7 FIRM, UNYIELDING SUBGRADE AFTER STRIPPING. SEE NOTE 7 & DET 113 Driveway cross section illustrates method in which runoff will be dispersed from the edge of the driveway surface. 4-7 Pierson Driveway TIR Part E: Water Quality System The site is in an area mapped for Enhanced Water Quality Treatment. The proposed driveway has an area of less than 5,000 square feet of pollution generating impervious surface. Water quality treatment of runoff is therefore not required. Nevertheless, since the driveway serves only two lots, the volume of traffic over the driveway surface will be low and pollutant loadings are anticipated to be insignificant. The proposed application of dispersion to provide flow control will also improve water quality as the stormwater percolates through the organic material in the upper profile of native soil. 4-8 Pierson Driveway TIR 5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN Stormwater R/D System Conveyance The stormwater system has been designed to convey at least the 100-year peak flow rate for the onsite conveyance system. The conveyance system consists of sheet flow dispersion from the edge of the proposed driveway surface. From the dispersion area, runoff flows to an area of native vegetation in the north basin on the site. 6-1 Pierson Driveway TIR G. SPECIAL REPORTS AND STUDIES A summary of special reports and studies conducted for the project is presented below. Table 3. Summary of Special Reports and Studies Geotechnical/soils Floodplains Anadromous fisheries impacts Water quality 6-1 Pierson Driveway TIR N/A N/A IMM N/A 7. OTHER PERMITS A summary of permits required for the project is listed in the table below. Table 4. Summary of Other Permits Required Onsite Sewage Disposal No — City of Federal Way proposed lots will connect to public sewer Developer/Local Agency No Washington State Department of Agreement Transportation NPDES Stormwater No Washington State Department of Ecology Section 10, 401, 404 No United States Army Corps of Engineers 7-1 Pierson Driveway TIR S. ESC ANALYSIS AND DESIGN Part A: ESC Plan Analysis and Design The project's erosion control plan was designed in accordance with the 2009 KCSWDM. The following is a description of the elements of the Erosion and Sediment Control (ESC) Plan. BMPs listed below are referenced from the Stormwater Management Manual for Western Washington (Washington. State Department of Ecology, February 2005). The ESC Plan is illustrated in Figure 7. 1. Mark Clearing Limits Description: The site will be delineated by a high visibility orange fence or silt fence with orange fabric. The fence will provide clear and physical limits for construction. Recommended BMPs: BMP C 103: High Visibility Plastic or Metal Fence BMP C233: Silt Fence or Compost Berm 2. Establish Construction Access Description: Construction access to the site will be directly off South 3341h Street. The staging areas, parking areas and other onsite vehicle transportation routes will be stabilized. Recommended BMPs: BMP C107: Construction Road/Parking Area Stabilization 3. Control Flow Rates Description: Construction stormwater will be dispersed by sheet flow from the project area. In the event that turbidity requirements for discharged water are consistently not met, construction water will be dispersed to a separate vegetated area using a temporary electric pump and flow dispersion system. Recommended BMPs: Stormwater Dispersion Construction stormwater will be dispersed by sheet flow to an onsite adjacent forested area. 8-1 Pierson Driveway TIR 4. Install Sediment Controls Description: A construction water dispersion system has been design and included on the TESC plan. Surrounding forested ground will filter and infiltrate the dispersed construction water. Silt fence has been specified at locations on the work boundaries where runoff has the potential to leave the project site or enter the onsite wetland. As an alternative to silt fence, compost berms may be substituted. This method of perimeter control is less resource intensive and can be left onsite to improve soil conditions at completion of construction. Recommended BMPs: BMP C233: Silt Fence or Compost Berm 5. Stabilize Soils Description: Disturbed soils will be stabilized with appropriate measures. The exact BMP will depend upon the final configuration of that portion of the site and the phase of construction. Areas that will ultimately become landscape will be seeded and mulched once they reach their final grade and configuration. The area of clearing will be limited where possible to minimize the amount of exposed soil surfaces, and the potential of erosion and sedimentation impacts on surface water. Temporary and permanent cover measures will be provided to protect disturbed areas. Mulching will be used to provide immediate temporary protection from erosion and to enhance plant growth. Plastic covering will be used to cover soil stock piles and trench excavations, and to protect steep slopes behind wall construction, stockpiles or to encourage grass growth in newly seeded areas. All of these features will be maintained throughout the construction effort. From October 1 through March 31, no soils shall remain exposed and unworked for more than 2 days. From April 1 to September 30, no soils shall remain exposed and unworked for more than 7 days. This stabilization requirement applies to all soils on site, whether or not at final grade. Recommended BMPs: BMP C120: Temporary and Permanent Seeding BMP C121: Mulching BMP C122: Nets and Blankets BMP C123: Plastic Covering BMP C130: Surface Roughening 8-2 Pierson Driveway TIR 6. Protect Slopes Description: Nets and blankets, seeding, and surface roughening may be used to stabilize embankments. Recommended BMPs: BMP C120: Temporary and Permanent Seeding BMP C121: Mulching BMP C122: Nets and Blankets BMP C130: Surface Roughening 7. Protect Drain Inlets Description: Existing drainage structures may collect surface runoff within the project area if constructed prior to other improvements. Sediment should not be allowed to enter any of these structures. Filter fabric or socks will be placed on or in the inlets. Recommended BMPs: BMP C220 Storm Drain Inlet Protection 8. Stabilize Channels and Outlets Description: Water will be managed such that stormwater from undisturbed areas is kept separate from construction runoff. 9. Control Pollutants Description: Pollutants other than sediment will be controlled as part of the implemented Stormwater Pollution Prevention Spill (SWPPS) Plan provided in Appendix F. Maintenance and repair of heavy equipment and vehicles that may result in discharge or spillage of pollutants to the ground or surface water runoff will be conducted using spill prevention measures. Contaminated surfaces will be cleaned immediately following any discharge or spill incident. Spills will be reported within 24 hours. Emergency repairs may be performed on -site using temporary plastic placed beneath and, if raining, over the vehicle. Concrete truck chutes, pumps, and internals shall be washed out only into formed areas awaiting installation of concrete or asphalt. Unused concrete remaining in the truck and pump shall be returned to the originating batch plant for recycling. Hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels shall be washed off only into formed areas awaiting installation of concrete or asphalt. When no formed areas are available, washwater and leftover product shall be contained in a lined container or in a sump 8-3 Pierson Driveway TIR designed to receive the materials. Contained concrete shall be disposed of in a manner that does not violate groundwater or surface water quality standards. Recommended BMPs: BMP C151: Concrete Handling 10. Control Dewatering Description: Dewatering is not currently expected to be needed. Recommended BMPs: Dewatering BMPs will be selected by the contractor. 11. Maintain BMPs Description: Sediment control BMPs shall be inspected weekly or after a runoff -producing storm during the dry season and daily during the wet season. BMPs shall be maintained according to the standards presented below. Extra erosion control materials will be kept on hand so that supplies are immediately available. A list of suggested materials is provided below: Material Measure Quantity Clear plastic, 6 mil 100-foot roll 2 Drainpipe, 6 or 8 inch diameter 25-foot section 4 Sandbags, filled Each 25 Straw bales for mulching Approx. 50# each 10 Quarry s ails Ton 2 Washed gravel Cubic and 2 Geotextile fabric 100-foot roll 1 Catch basin inserts Each 4 Steel "T" posts Each 12 Recommended BMPs: BMP C150: Materials On -Hand 8-4 Pierson Driveway TIR 12. Manage the Project Description: Project management elements related to the ESC Plan are described below. Surface water discharging from the site may need to be sampled and analyzed upon the County's request. A Certified Professional in Erosion and Sediment Control will be on -site or on -call at all times. Certification may be through the WSDOT/AGC of Washington Education Foundation Construction Site Erosion and Sediment Control Certification Program or any equivalent local or national certification and/or training program. 8-5 Pierson Driveway TIR Recommended Maintenance for Erosion Control BMPs BMP Location of BMP Maintenance Standards BMP C103: High Visibility Perimeters of ■ If the fence has been damaged or Plastic or Metal Fence construction visibility reduced, it shall be repaired or areas replaced immediately and visibility restored. BMPC 105: Stabilized Install at ■ Quarry spalls (or hog fuel) shall be Construction Entrance construction added if the pad is no longer in entrance accordance with the specifications. ■ If the entrance is not preventing sediment from being tracked onto pavement, then alternative measures to keep the streets free of sediment shall be used. This may include street sweeping, an increase in the dimensions of the entrance, or the installation of a wheel wash. ■ Any sediment that is tracked onto pavement shall be removed by shoveling and/or street sweeping. The sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not be cleaned by washing down the street, except when sweeping is ineffective and there is a threat to public safety. If it is necessary to wash the streets, the construction of a small sump shall be considered. The sediment would then be washed into the sump where it can be controlled. ■ Any quarry spalls that are loosened from the pad, which end up on the roadway shall be removed immediately. 8-6 Pierson Driveway TIR BMP Location of BMP Maintenance Standards BMP 107: Construction Staging areas ■ Inspect stabilized areas regularly, Road/Parking Stabilization especially after large storm events. ■ Crushed rock, gravel base, hog fuel, etc. shall be added as required to maintain a stable driving surface and to stabilize any areas that have eroded. ■ Following construction, these areas shall be restored to pre -construction condition or better to prevent future erosion. BMP C120: Temporary and Exposed soils ■ Any seeded areas that fail to establish Permanent Seeding that will be at least 80 percent cover (100 percent landscape cover for areas that receive sheet or concentrated flows) shall be reseeded. If reseeding is ineffective, an alternate method, such as sodding, mulching, or nets/blankets, shall be used. If winter weather prevents adequate grass growth, this time limit may be relaxed at the discretion of the local authority when sensitive areas would otherwise be protected. ■ After adequate cover is achieved, any areas that experience erosion shall be reseeded and protected by mulch. If the erosion problem is drainage related, the problem shall be fixed and the eroded area reseeded and protected by mulch. ■ Seeded areas shall be supplied with adequate moisture, but not watered to the extent that it causes runoff. BMP C121: Mulching Exposed soils ■ The thickness of the cover must be that will be maintained. landscaped ■ Any areas that experience erosion shall including be re -mulched and/or protected with a biofiltration net or blanket. If the erosion problem is swales and drainage related, then the problem shall infiltration be fixed and the eroded area re - depressions mulched. 8-7 Pierson Driveway TIR BMP Location of BMP Maintenance Standards BMP C122: Nets and Blankets Exposed soils ■ Good contact with the ground must be that will be maintained, and erosion must not occur landscaped beneath the net or blanket. including ■ Any areas of the net or blanket that are biofiltration damaged or not in close contact with swales and the ground shall be repaired and infiltration stapled. depressions If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. BMP C123: Plastic Covering Soil stock piles, ■ Torn sheets must be replaced and open trench seams repaired. excavations ■ If the plastic begins to deteriorate due to ultraviolet radiation, it must be completely removed and replaced. ■ When the plastic is no longer needed, it shall be completely removed. BMP C130: Surface Exposed soils ■ Areas that are graded in this manner Roughening that will be should be seeded as quickly as possible. landscaped ■ Regular inspections should be made of including the area. If rills appear, they should be biofiltration re -graded and re -seeded immediately. swales and infiltration depressions BMP C150: Materials On General site ■ All materials with the exception of the Hand quarry spalls, steel "T" posts, and gravel should be kept covered and out of both sun and rain. ■ Re -stock materials used as needed. 8-8 Pierson Driveway TIR BMP Location of BMP Maintenance Standards BMP C220: Storm Inlet Drain General site ■ Catch basin filters should be inspected Protection frequently, especially after storm events. If the insert becomes clogged, it should be cleaned or replaced. ■ For systems using stone filters: If the stone filter becomes clogged with sediment, the stones must be pulled away from the inlet and cleaned or replaced. Since cleaning of gravel at a construction site may be difficult, an alternative approach would be to use the clogged stone as fill and put fresh stone around the inlet. ■ Do not wash sediment into storm drains while cleaning. Spread all excavated material evenly over the surrounding land area or stockpile and stabilize as appro riate. BMP C232: Gravel Filter Inlets to catch ■ Regular inspection is required. Berm basins where the Sediment shall be removed and filter filter berm will material replaced as needed. not impede traffic flow BMP C233: Silt Fence Perimeters of ■ Any damage shall be repaired construction immediately. If concentrated flows are areas that flow evident uphill of the fence, they must offsite be intercepted and conveyed to a sediment pond. ■ It is important to check the uphill side of the fence for signs of the fence clogging and acting as a barrier to flow and then causing channelization of flows parallel to the fence. If this occurs, replace the fence or remove the trapped sediment. ■ Sediment deposits shall either be removed when the deposit reaches approximately one-third the height of the silt fence, or a second silt fence shall be installed. 8-9 Pierson Driveway TIR Part B: SWPPS Plan Design The site is in the Hylebos Creek watershed. A Stormwater Pollution Prevention (SWPPS) Plan is provided in Appendix F. 8-10 Pierson Driveway TIR ADOPT -LIONS AD AI.GEEEIRA47 DII'ERLNCI, 4-1 C BOUNDARY NE BLDG BUILDING q CE'NTE RUNE DET DETAIL EX LXISTIND GF3 (LADE BRIMS EG EXISTING GRADE ELE1 ELEVATION EX FG Ell TIN' FINISHED GRADE GEN l NERIAL. H HIGH HT HEIGHT MMA II JI MIX ASPHALT IE ! AVERT ELEVATION L. GNG, LFNALH LF LINEAR FFFT MIN NO MIN MUM AvElA IN 1, PERMEABLE I (OT MIX ASPHALT LOS LOIN) OF REVILLSE COR'VE PROP PFOPOSfD PVC POINT OF VERTICAL CUP./ATURE PVI POINT ON VERTICAL. INTI RSECIION PVT ROW POINT OF VE12 ,'CAL TANGENCY RIGHT -OF RA" A, STORM DRAIN SHT SHEET SPEC SPFGIFANDON sTA STATION STD STANDARD SS 'IDE ()IS SANITARY SERER TYP VC PICAL VERTICAL CURVE 2/3 RITAIi. NUMBER/SHEET NUMBER SP,, G301S STANDARD PLAN NUMBCR/SHEET NUMBER M AT N nHMBF.R -,�0,. FX 61 a36G0a50 IS r OR ALI, , D95I C 6 t � FAR ORVEES"T 6 A M y B FLE i z —D E ON V! �E, 21 GIAVEL -� — GL NOTC4" ` - AREGEO E E �SN DL SEE FIT 1/1 S C DE 'R SPROLOW 1. DF.1' 1/1 1 6' DRIVEWAY — POROUS HMA 1 -4 'NA APPROX STF +26 TYPICAL STA 7 GG TO S7A 2+45 ET]PONT OR ESMT B ESMT �,o a ISP / D E oN 2� z9 L T _ L i FAE NLTD TEE 0 f > � '- P GS E RASE -SUNG D F' 1 CRUS Ef. E <'E EE NOTES T ?E SEE NOUCS4 Sir NOW 6 �116' DRIVEWAY I MA 4. .s.. APPITOX_ STA 3+40 TYP CAL STA 2�A5 TO STA 4f30-2 SEE SET 2/1 // a TOE OF LOT JT �."�J t,RA EL FEE NET /^ l EARING� GPI Ll SCE SET ITIL 1 --- SSE D£T E12 tiG - COSSINICITISN En IFANCE SEE DEl2/1 FMCFl NO INI (1 \FELAN '--,i6' AI,LTL,_ RSTLs OP CIMITF F ' ARIF,' R't u i0E OF 'I MA'TOP F CU'T N A FRO AND FOR HiuA DR1PI Ar E EPT 1TOPI-IOLTEST IN FrTFPONFSinALAN ORIVEwnY EZCFPi pN REST SAGE 7I. P/R1MLNT M/RL-IL IDITS1111 IS AFTER F-PACTION- 2. FOR POROUS HMA INFO SEE SET 1/3 & NOTES ON SET 3 L- 1MASINLL DE CAS H. PD 6.1, 22 (CIAS A) 'EQU NEE° ENTS or VYSAOT o D STEP E C-11E R_ 1 ) CRUSHED SUPPAING. Ho GR E F I TAND A TEST OF Ef ISPI GFO F E OR PRODUCTAPPROVED El FOOPMER MASGI DIN OPECC 0 FRPIF, LF o ERTSI AP DAL LOTS T to ,ialCT101 P11RIT RANIRANIF URAMIN(D OF PROPOSFP SEGIS171L AOICRETF OALL FOR APEFORILB' OWNED 0 0 CO FIN E. E' 0 D 0 BO BE: 8MIN HLIGLTD SOLID, 3000 PI GSNCkS1rE INTERLOCKINC TO STINDL r SEE PLAN - . T0,4- D NEST o o.,u SEE SET s/z .DF ° E r F DAD. A55 2 1 IS C F DT E ) OR I RATER STRUCTURE SERVICE CE 11iSTORM JEOfNLRWS 3. THE DAN SHALL HAVE A DUILT-IN, HIA -FLOW REIJEF 'STEM OPPERFL0,1 T LESS). 4. THE R TRIF.unl. AISTFM MU1T A1.1.011 RFID-L OF THE DO'D WTIHOUT SPILEMG THE CD,IFCTF0 RATE ss wA1 DETEAILE - a pas C ROSE S[CTION ISOIeIET "C VIEW 5 VIA-1 P«C'TE=CHCN G ROW- I FGr- IDm • CLEARING & GRADING LIMITS UMIT — & -AR FENCE • COMPOST 6E1M L) INLET PROTECTION �PPPQIP.E AUPAwQBP NU �... I s DII PDT, L AL S ARDIN) Call 811 2 WGftD y @e—You DU CONTRACTOR SHAIL VFRAY LOCATION AND DEPTHS Of NI SE4vG INS N111ITES IN THE OLD PROD 10 COUSIRUCSON 4 Figure 7. TESC Plan. 9. BOND QUANTITIES AND FACILITY SUMMARY The onsite stormwater facilities will be privately owned and maintained. A bond quantity worksheet and summary of onsite stormwater facilities are provided in this section. 9-1 Pierson Driveway TIR Figure 8. Site Improvement Bond Quantity Worksheet King County Department of Development & Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98055-1219 206-296-6600 TTY 206-296-7217 Project Name: Pierson Driveway Location: 3516 South 336th Street, Federal Way WA 98198 Clearing greater than or equal to 5,000 board feet of timber? yes X no If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Pierson Bond Quant_02-Prices.xlsx For alternate formats, call 206-296-6600. Date: 1 /25/2013 Project No.: Activity No.: 12-101079-00-PC Note: All prices include labor, equipment, materials, overhead and profit. Prices are from IRS Means data adjusted for the Seattle area or from local sources if not included in the IRS Means database. Check out the DDES Web site at www.metrokc.pov/ddes Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 12/9/2012 Figure 8. Site Improvement Bond Quantity Worksheet ................ I2ef rence #.... Unit . , Price Jnit .Quantit of Appii : t%cns Cost ER ICON EDfl4 ENT CONTRO ` Backfill & compaction -embankment Dumber ESC-1 $ 5.62 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditching ESC-4 $ 8.08 CY Excavation -bulk ESC-5 $ 1.50 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 340 1 469 Fence, Temporary (NGPE) ESC-7 $ 1.38 LF 300 Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY 150 1 89 Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY 150 1 302 Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY Piping, temporary, CPP, 6" ESC-12 $ 10.70 LF Piping, temporary, CPP, 8" ESC-13 $ 16.10 LF Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each 1 1 2929 Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY ESC-23 SWDM 5.4.2.5 $ 6.03 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY TESC Supervisor ESC-25 $ 74.75 HR Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR WRITE-IN-Il I § see:am2 Each Page 2 of 9 Pierson Bond Quant_02-Prices.xlsx ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Check out the DDES Web site at www.metrokc.pov/ddes $ 3,787.88 $ 1,136.36 $ 4,924.24 A Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 12/9/2012 . . . . . . . . Unit Pficd ' Unit isfi�ng Future Public Private quenti y.Z mplated Rlght-of-Way Rp, Improvements Jmprovements {Bar d Rsducilan)* 8 Praina a FadlTe Quint. Quanta Goat ` (uar t.17 i t Qu , nt. ' fist trmpiet ctst I RAL iT`EM .. hlt . GI - 1 Backfill & Compaction- embankment $ 5.62 CY 50 281.00 Backfill & Compaction- trench GI - 2 $ &53 CY Clear/Remove Brush, by hand GI - 3 $ 0.36 SY Clearing/Grubbing/Tree Removal GI - 4 $ 8,876A6 Acre 0.11 976.38 Excavation - bulk GI - 5 $ 1.50 CY 100 150.00 Excavation - Trench GI - 6 $ 4.06 CY Fencing, cedar, 6' high GI - 7 $ 18.55 LF Fencing, chain link, vinyl coated, 6' hig GI - 8 $ 13.44 LF Fencing, chain link, gate, vinyl coated, GI - 9 $ 1,271.81 Each Fencing, split rail, 3' high GI - 10 $ 12.12 LF Fill & compact - common barrow GI - 11 $ 22.57 CY Fill & compact - gravel base GI - 12 $ 25.48 CY Fill & compact - screened topsoil GI - 13 $ 37.85 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 54.31 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 74.85 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 132.48 SY Grading, fine, by hand GI - 17 $ 2A2 SY Grading, fine, with grader GI - 18 $ 0.95 SY 5001 475.00 Monuments, 3' long GI - 19 $ 135.13 Each Sensitive Areas Sign GI - 20 $ 2M Each 2 5.76 Sodding, 1" deep, sloped ground GI - 21 $ 7.46 SY Surveying, line & grade GI - 22 $ 788.26 Day Surveying, lot location/lines GI - 23 $ 1,55&64 Acre Traffic control crew ( 2 flaggers) GI - 24 $ 85.18 HR Trail, 4" chipped wood GI - 25 $ 7.59 SY Trail, 4" crushed cinder GI - 26 $ 8.33 SY Trail, 4" top course GI - 27 $ 8A 9 SY Wall, retaining, concrete GI - 28 $ 44.16 SF Wall, rockery GI - 29 $ 9A9 SF Page 3 of 9 SUBTOTAL 1,888A4 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Pierson Bond Quant_02-Prices.xlsx Check out the DDES Web site at www.metrokc.povlddes Report Date: 12/9/2012 Existing Future: Public... ...iPrivate ... fight- rfi tnr y2oa ! im ov menu Tprcxir rnent & C�raina a 1=acuities Unit:Prce Unit Gluant :" Gast Q'uant Cast Quint. Cosh .... Bond Reduction* ... Qu'ant, Carnpiefe Cast ' AC Grinding, 4' wide machine < 1000s RI - 1 $ 23.00 SY AC Grinding, 4' wide machine 1000-20 RI - 2 $ 5.75 SY AC Grinding, 4' wide machine > 2000s RI - 3 $ 1.38 SY AC Removal/Disposal/Repair RI - 4 $ 41.14 SY Barricade, type I RI - 5 $ 30.03 LF Barricade, type III ( Permanent) RI - 6 $ 45.05 LF Curb & Gutter, rolled RI - 7 $ 13.27 LF Curb & Gutter, vertical RI - 8 $ 9.69 LF Curb and Gutter, demolition and dispos RI - 9 $ 13.58 LF Curb, extruded asphalt RI - 10 $ 2A4 LF Curb, extruded concrete RI - 11 $ 2.56 LF Sawcut, asphalt, 3" depth RI - 12 $ 1.85 LF Sawcut, concrete, per 1" depth RI - 13 $ 1.69 LF Sealant, asphalt RI - 14 $ 0.99 LF Shoulder, AC, ( see AC road unit price RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 7.53 SY Sidewalk, 4" thick RI - 17 $ 30.52 SY Sidewalk, 4" thick, demolition and disp RI - 18 $ 27.73 SY Sidewalk, 5" thick RI - 19 $ 34.94 SY Sidewalk, 5" thick, demolition and disp RI - 20 $ 34.65 SY Sign, handicap RI - 21 $ 85.28 Each Striping, per stall RI - 22 $ 5.82 Each Striping, thermoplastic, ( for crosswalk RI - 23 $ 2.38 SF Striping, 4" reflectorized line IRI - 24 $ 0.25 LF Page 4 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Pierson Bond Quant_02-Prices.xlsx Check out the DDES Web site at www.metrokc.povlddes Report Date: 12/9/2012 Existing Future: Public... ...iPrivato... .... Bond Reduction* ... fight- rfi tnr y Road Imppoyements rnprcxv menu Draina a 1=acuities Quarrt, Unitfce Unit Quan#, "Gast Q'uant. Cast Quin#. Cost Campiefe Cast ' � CiA[? uliRFAGING (4" t2 c 2,5 base ,1.b"'trap course} i*af'J CRS ( 6. "Rock, 5"' base 1.5"top course) For KCRS '93, (additional 2.5" base) ac IRS - 1 $ 3.60 SY AC Overlay, 1.5" AC IRS - 2 $ 7.39 SY AC Overlay, 2" AC IRS - 3 $ 8.75 SY AC Road, 2", 4" rock, First 2500 SY IRS - 4 $ 17.24 SY AC Road, 2", 4" rock, Qty. over 2500S) IRS - 5 $ 13.36 SY AC Road, 3", 4" rock, First 2500 SY IRS - 6 $ 19.69 SY AC Road, 3", 4" rock, Qty. over 2500 S IRS - 7 $ 15.81 SY AC Road, 5", First 2500 SY IRS - 8 $ 14.57 SY AC Road, 5", Qty. Over 2500 SY IRS - 9 $ 13.94 SY AC Road, 6", First 2500 SY RS - 1 $ 16.76 SY AC Road, 6", Qty. Over 2500 SY RS - V $ 16.12 SY Asphalt Treated Base, 4" thick RS - 1 $ 9.21 SY Gravel Road, 4" rock, First 2500 SY RSS - 1 $ 11.41 SY Gravel Road, 4" rock, Qty. over 2500 S RS - 1 $ 7.53 SY PCC Road, 5", no base, over 2500 SY RS - 1 $ 21.51 SY PCC Road, 6", no base, over 2500 SY RS - 1 $ 21.87 SY Thickened Edge DIS - 1 $ 6.89 LF Page 5 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Pierson Bond Quant_02-Prices.xlsx Check out the DDES Web site at www.metrokc.povlddes Report Date: 12/9/2012 Existing... F'ntni MIN*... fiV r fond T e iuotton* Might -of -way Road Jmproysments tmprt� r r en ' i7raina Fecilitias . Cuant. Unit?rieeUrrit` Quant, Cast Quart, t` 4uant. < G'pstrrrle€e ;Cast ?� {Ci P ;Cornigated 'I Access Road, R/D ti l'ip D - 1 ;N1 " ,quiva,i rit) $ 16.74 SY Fcr'Culvert pvices;:nvera ecr crueruuas ssumecl.A . p ... u e erF ratedPU issame� rice s olid 3 e.' to p p p.p Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each * (CBs include frame and lid) CB Type I D - 4 $ 1,257.64 Each CB Type IL D - 5 $ 1,433.59 Each CB Type II, 48" diameter D - 6 $ 2,033.57 Each for additional depth over 4' D - 7 $ 436.52 FT CB Type II, 54" diameter D - 8 $ 2,192.54 Each for additional depth over 4' D - 9 $ 486.53 FT CB Type II, 60" diameter D-101 $ 2,351.52 Each for additional depth over 4' D - 11 $ 536.54 FT CB Type II, 72" diameter D - 12 $ 3,212.64 Each for additional depth over 4' D - 13 $ 692.21 FT Through -curb Inlet Framework (Add) D - 14 $ 366.09 Each Cleanout, PVC, 4" D - 15 $ 130.55 Each Cleanout, PVC, 6" D - 16 $ 174.90 Each Cleanout, PVC, 8" D - 17 $ 224.19 Each Culvert, PVC, 4" D - 18 $ 8.64 LF Culvert, PVC, 6" D - 19 $ 12.60 LF Culvert, PVC, 8" D - 20 $ 13.33 LF Culvert, PVC, 12" D - 21 $ 21.77 LF Culvert, CMP, 8" D - 22 $ 17.25 LF Culvert, CMP, 12" D - 23 $ 26.45 LF Culvert, CMP, 15" D - 24 $ 32.73 LF Culvert, CMP, 18" D - 25 $ 37.74 LF Culvert, CMP, 24" D - 26 $ 53.33 LF Culvert, CMP, 30" D - 27 $ 71.45 LF Culvert, CMP, 36" D - 28 $ 112.11 LF Culvert, CMP, 48" D - 29 $ 140.83 LF Culvert, CMP, 60" D - 30 $ 235.45 LF Culvert, CMP, 72" D - 31 $ 302.58 LF Page 6 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Pierson Bond Quant_02-Prices.xlsx Check out the DDES Web site at www.metrokc.povlddes Report Date: 12/9/2012 [iRa1 a�E t7NTlNi {� Culvert, Concrete, 8" D- 32 Unit"ric $ 21.02 r LF {fight w -of -way cost Road si Draoao ti Ptilisfivr Jmproyernents Facfitas t tmprt� r r en ' Bond Quaniet,te; p Teiuotton*.... Cost Culvert, Concrete, 12" D- 33 $ 30.05 LF Culvert, Concrete, 15" D- 34 $ 37.34 LF Culvert, Concrete, 18" D- 35 $ 44.51 LF Culvert, Concrete, 24" D- 36 $ 61.07 LF Culvert, Concrete, 30" D- 37 $ 104.18 LF Culvert, Concrete, 36" D- 38 $ 137.63 LF Culvert, Concrete, 42" D- 39 $ 158.42 LF Culvert, Concrete, 48" D - 40 $ 175.94 LF Culvert, CPP, 6" D - 41 $ 10.70 LF Culvert, CPP, 8" D - 42 $ 16.10 LF Culvert, CPP, 12" D - 43 $ 20.70 LF 20 414 Culvert, CPP, 15" D - 44 $ 23.00 LF Culvert, CPP, 18" D - 45 $ 27.60 LF Culvert, CPP, 24" D - 46 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP, 36' D - 48 $ 55.20 LF Ditching D - 49 $ 8.08 CY Flow Dispersal Trench 1,436 base+) D - 50 $ 25.99 LF French Drain (3' depth) D - 51 $ 22.60 LF Geotextile, laid in trench, polypropylen D - 52 $ 2.40 SY Infiltration pond testing D - 53 $ 74.75 HR Mid -tank Access Riser, 48" dia, 6' dee D - 54 $ 1,605A0 Each Pond Overflow Spillway D - 55 $ 14.01 SY Restrictor/Oil Separator, 12" D - 56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D - 57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D - 58 $ 1,146.16 Each Riprap, placed D - 59 $ 39.08 CY 6 234.48 Tank End Reducer (36" diameter) D - 60 $ 1,000.50 Each Trash Rack, 12" D - 61 $ 211.97 Each Trash Rack, 15" D - 62 $ 237.27 Each Trash Rack, 18" D - 63 $ 268.89 Each Trash Rack, 21" D - 64 $ 306.84 Each Page 7 of 9 SUBTOTAL 648.48 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Pierson Bond Quant_02-Prices.xlsx Check out the DDES Web site at www.metrokc.povlddes Report Date: 12/9/2012 Exi tin ... E t i P lilirs Ptiy t r Bond Reriuctlon*.... Riryht-of-way Road Jmproyernents tmprt� r r enfi 'Drain. Facilities . ` Cuant. Unit ?riee Unit` Quant, Prtc ''' Quant CcRst " Gluant. ° o t ornplefe Cost R RKlN91911 URFAA IIat ' .. No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 15.84 SY 610 9662.4 2" AC, 1.5" top course & 2.5" base cot PL - 2 $ 17.24 SY 4" select borrow PL - 3 $ 4.55 SY 1.5' top course rock & 2.5" base cours PL-4 $ 11.41 SY WR T -L,N4 S - No. Crsuhed rock for dispersion WI-1 $ 40.00 CY 15 600.00 WI-2 SY WI-3 CY WI-4 LF WI-51 FT WI-6 WI-7 WI-8 WI-9 WI-10 SUBTOTAL 10,262A0 SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 C 12,799.02 3,839.71 16,63&72 D rz Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Pierson Bond Quant_02-Prices.xlsx Check out the DDES Web site at www.metrokc.pov/ddes Report Date: 12/9/2012 Original bond computations prepared by: Name: Ed McCarthy Date: 1/25/2013 PE Registration Number: 28576 Tel. #: 425-271-5734 Firm Name: Ed McCarthy, PE, PS Address: 9957 171 st Avenue SE, Renton, WA 98059 Project No: ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND* PUBLIC ROAD & DRAINAGE AMOUNT BOND* AMOUNT MAINTENANCE/DEFECT BOND* Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Road Improvements & Drainage Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash.) Performance Bond* Amount (A+B+C+D)= TOTAL Reduced Performance Bond* Total *** Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND* REDUCTION: (A) $ 4,924.2 (B) $ (C) $ (D) $ 16,638.7 (A+B) $ 4,924.2 (T) $ 21,563.0 Minimum bond* amount is $1000, REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY *** (E) $ F x 0.30 $ 6,468.9 OR (T-E) $ 21,563.0 Use larger of Tx30% or (T-E) Date: (B+C) x 0.25 = $ * NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be ' $ 16,(C+D)-E REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES Page 9 of 9 Check out the DDES Web site at www.metrokc.pov/ddes Pierson Bond Quant_02-Prices.xlsx Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 12/9/2012 Figure 9. STORMWATER FACILITY SUMMARY SHEET Permit Number (provide one Stormwater Facility Summary Sheet per Natural Discharge Location) Overview: Project Name: Pierson Driveway Date: 1-23-13 Downstream Drainage Basins Major Basin Name: Hylebos Creek Immediate Basin Name: North Lake, Hylebos tributary Flow Control: Flow Control Facility Name/Number: Driveway dispersion, pervious pavement Facility Location: Along east edge of driveway If none, Flow control provided in regional/shared facility (give location) N/A No flow control required Exemption no. General Facility Information: Type/Number of detention facilities: Type/Number of infiltration facilities: ponds ponds vaults tanks tanks trenches Control Structure Location: N/A Type of Control Structure: N/A Number of Orifices/Restrictions: Size of Orifice/Restriction: No. 1 No. 2 No. 3 No. 4 Flow Control Performance Standard: Conservation Live Storage Volume Required: 0 CF Depth: 0 feet Volume Factor of Safety: 0% Number of Acres Served: 0.0 Number of Lots: Driveway serves 2 lots Dam Safety Regulations (Washington State Department of Ecology) Reservoir Volume above natural grade: 0 CF Depth of Reservoir above natural grade: 0 feet Facility Summary Sheet Sketch All detention, infiltration and water quality facilities must include a detailed sketch. (11 "x17" reduced size plan sheets may be used) 10. OPERATIONS AND MAINTENANCE MANUAL The stormwater and water quality facilities for the project will be privately maintained. The table below specifies the maintenance requirements for each component of the stormwater facility being constructed. Applicable maintenance requirements for conventional stormwater design components were taken from the 2009 Surface Water Design Manual and are referenced to the pages that follow. Table 6. Summary of Maintenance Requirements for Stormwater Facilities 10-1 Pierson Driveway TIR NO. 1 B - POROUS PAVEMENT Porous Pavement Standing water; Prevent landscape materials such as soil and No standing water on pavement; visible debris on mulch from being placed on porous pavement water infiltrates freely into base surface surface. Keep adjacent landscape areas well maintained. Prevent soil from washing onto pavement. Organic matter on Sweep or blow leaves and other organic debris pavement surface from pavement surface in coordination with landscape maintenance. Loosen and remove accumulations of moss. Minimize use of sand and salts for deicing. If necessary, used crushed nut shells or similar type material. Vacuum clean surface with professional sweeping machine 1 to 2 times per year or as needed. Erosion at edge of Repair gravel base; add more gravel as required. pavement surface 10-2 Pavement surface free from organic debris Water seeping from edge of pavement should be well - dispersed NO.7 - ENERGY DISSIPATERS External: Rock Pad Missing or Moved Only one layer of rock exists above native soil in Replace rocks to design Rock area five square feet or larger, or any exposure of standards. native soil. Dispersion Trench Pipe Plugged with Accumulated sediment that exceeds 20% of the Pipe cleaned/ flushed so that it Sediment design depth. matches design. Not Discharging Visual evidence of water discharging at Trench must be redesigned or Water Properly concentrated points along trench (normal condition rebuilt to standards. is a "sheet flow" of water along trench). Intent is to prevent erosion damage. Perforations Over 1/2 of perforations in pipe are plugged with Clean or replace perforated pipe. Plugged. debris and sediment. Water Flows Out Maintenance person observes water flowing out Facility must be rebuilt or Top of "Distributor" during any storm less than the design storm or its redesigned to standards. Catch Basin. causing or appears likely to cause damage. Receiving Area Water in receiving area is causing or has potential No danger of landslides. Over -Saturated of causing landslide problems. 10-3 NO. 10 - CONVEYANCE SYSTEMS (PIPES & DITCHES) Pipes Sediment & Debris Accumulated sediment that exceeds 20% of the Pipe cleaned of all sediment and diameter of the pipe. debris. Vegetation Vegetation that reduces free movement of water All vegetation removed so water through pipes. flows freely through pipes. Damaged Protective coating is damaged; rust is causing Pipe repaired or replaced. more than 50% deterioration to any part of pipe. Any dent that decreases the cross section area of Pipe repaired or replaced. pipe by more than 20%. Open Ditches Trash & Debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from square feet of ditch and slopes. ditches. Sediment Accumulated sediment that exceeds 20 % of the Ditch cleaned/ flushed of all design depth. sediment and debris so that it matches design. Vegetation Vegetation that reduces free movement of water Water flows freely through through ditches. ditches. Erosion Damage to See 'Ponds" Standard No. 1 See "Ponds" Standard No. 1 Slopes Rock Lining Out of Place Maintenance person can see native soil beneath Replace rocks to design or Missing (If the rock lining. standards. Applicable). Catch Basins See "Catch Basins: Standard No. 5 See "Catch Basins" Standard No. 5 Debris Barriers See 'Debris Barriers" Standard No.6 See "Debris Barriers" Standard (e.g., Trash Rack) No. 6 10-4 FIR MffZIT-Tr. King County Department of Natural Resources, 2009. King County Surface Water Design Manual. Seattle. King County Department of Natural Resources, January 2005. Stormwater Pollution Prevention Manual — Best Management Practices, for Business and Residential Properties. Seattle. King County Department of Parks, Planning, and Resources, 1990. Sensitive Areas Map Folio. Seattle. U.S. Department of Agriculture, Soil Conservation Service, 1973. Soil Survey of King County Area, Washington. Seattle. Washington State Department of Ecology, February 2005. Stormwater Management Manual for Western Washington. Olympia. 11-1 Pierson Driveway TIR 12. APPENDICES Appendix A. Photos of the Project Site Appendix B. Flow Control Design Appendix C. KCRTS Documentation Appendix D. Hydrologic Model Documentation Appendix E. Special Reports and Studies Appendix F. Stormwater Pollution Prevention and Spill Plan Pierson Driveway TIR Appendix A. Photos of the Project Site Pierson Driveway TIR Appendix A: Photos of the Project Site ♦ Photo Number 1 Date of Photo: 12-5-12 Location: Onsite wetland. Description: Two jurisdictional wetlands have been delineated on the project property. ♦ Photo Number 2 Date of Photo: 12-5-12 Location: Onsite north basin. Description: The site is mostly covered with mature second growth forest. Appendix A: Photos of the Project Site ♦ Photo Number 3 Date of Photo: 12-5-12 Location: South 334t Street looking west. Description: The driveway will enter from South 334th Street along the west boundary of the lot. ♦ Photo Number 4 Date of Photo: 12-5-12 Location: South 334t Street looking east. Description: No changes to the road frontage are proposed. Appendix B. Flow Control Design Pierson Driveway TIR Appendix C. KCRTS Documentation Appendix C.1 KCRTS Time Series Calculations Appendix C.2 KCRTS Peak Flow Rates Appendix C.jL KCRTSl0mme Series Calculations Basin Calculations 15-Minute Time Series (baoioo15.exz): KCRTS Command ------------- CREATE a new Time Series ------------------------ Production of Runoff Time Series Project Location Sea-Tac Computing Series fnrI5.tsf Regional Scale Factor l'OO Data Type Reduced Creating I5-minute Time Series File Loading Time Series FiIe:C:\KC_SWDM\BZ_DATA\3TTFI58.rnf � Till Forest 0.I5 acres -------------- TotaI Area 0.15 acres Peak Discharge: 0.016 CFS at 9:30 on Jan 9 in Year O Storing Time Series File:forI5.tof � Time Series Computed KCRT3 Command ------------- Butez the Analysis TOOLS Module ------------------------------- Analysis Tools Command ---------------------- Compute PEAKS and Flow Frequencies ---------------------------------- Loading Stage/Discharge cnrv*:forI5.Lof Flow Frequency Analysis -------------------------------------------------------- 7ime Series File:fozI5'tsf Project Locatinn:Sea-Tac Frequencies a Peaks saved to FiIe:forI5.Dks Analysis Tools Command ---------------------- Compute Flow DURATION and Exoeedeoc* ------------------------------------ Loading Time Series File:fozl5.taf Computing Interval Locations Computing Flow Durations Durations a Exoeedence Probabilities to FiIe:forI5.doz Analysis Tools Command ---------------------- RETURN to Previous Menu _______________________ KCRT3 Command ------------- CREATE a new Time Series Pierson Driveway TIR ------------------------ Pzoduotioo of Runoff Time Series Project Location Sea-Tac Computing Series devIS.taf Regional Scale Factor l'OO Data Type Reduced Creating I5-minute Time Series File Loading Time Series FiIe:C:\BZ_3WDM\BZ_DATA\ST8ZI58.rof � Impervious 0.I5 acres -------------- TotaI Area 0.15 acres Peak Discharge: 0.I77 CFS at 6:30 on Jan 9 in Year 8 Storing Time Series File:devI5.taf � Time Series Computed KCRT3 Command _____________ Uoter the Analysis TOOLS Module ------------------------------- Analysis Tools Command ---------------------- Compute PEAKS and Flow Frequencies ---------------------------------- Loadiog Stage/Discharge onrvo:devI5.tof � Flow Frequency Analysis -------------------------------------------------------- Time Series Filo:devI5'tsf Project Locatioo:Sea-Tac Frequencies a Peaks saved to File:devI5.Bko Analysis Tools Command ---------------------- Compnt* Flow DURATION and Exoeodeoo* ------------------------------------ Loading Time Series File:denl5.tof � Computing Interval Locations Computing Flow Durations Durations & Dxoeedeuce Probabilities to FiIe:devI5.dnz � Analysis Tools Command ---------------------- RETURN to Previous Menu ----------------------- KCRT3 Command ------------- CREATE a new Time Series ------------------------ Production of Runoff Time Series Project Location Sea -Tao Computing Series mitl5.tuf Regional Scale Factor l'OO Data Type Reduced Creating I5-minute Time Series File Loading Time Series FiIe:C:\DC_SW0M\KC_DATA\STTG15D.ruf Till Grass 0.09 acres Pierson Driveway TIR Loading Time Series File:C:\KC SWDM\KC DATA\STEI15R.rnf Impervious 0.06 acres -------------- Total Area 0.15 acres Peak Discharge: 0.116 CFS at 6:30 on Jan 9 in Year 8 Storing Time Series File:mitl5.tsf Time Series Computed KCRTS Command ------------- Enter the Analysis TOOLS Module ------------------------------- Analysis Tools Command ---------------------- Compute PEAKS and Flow Frequencies ---------------------------------- Loading Stage/Discharge curve:mitl5.tsf Flow Frequency Analysis -------------------------------------------------------- Time Series File:mitl5.tsf Project Location:Sea-Tac Frequencies & Peaks saved to File:mitl5.pks Analysis Tools Command ---------------------- Compute Flow DURATION and Exceedence ------------------------------------ Loading Time Series File:mitl5.tsf Computing Interval Locations Computing Flow Durations Durations & Exceedence Probabilities to File:mitl5.dur Analysis Tools Command ---------------------- RETURN to Previous Menu ----------------------- KCRTS Command ------------- eXit KCRTS Program ------------------ Pierson Driveway TIR AppendUmC.2 KCRlS Peak Flow Rates 15-Minute Peak Rates Flow Frequency Analysis Time Series FiIe:foz15.tof Project Looation:Sea-Tao ---AonnaI Peak Flow Rates --- Flow Date Rank Time of Peak (CFS) 0.0I0 2 2/09/0I I7:00 0.003 7 I/06/02 2:45 0.007 4 2/28/03 4:30 0.001 D 3/08/04 22:45 0.005 6 I/05/05 8:00 0.008 3 I/I8/06 I9:30 0.006 5 II/24/06 3:30 0.017 l 1/09/08 9:30 Computed Peaks -----FIow Frequency Analysis ------- Peaks - - Rank Return Pcob (CFS) Period 0.017 I 100.00 0.890 0.010 2 25'00 0.960 0.008 3 I0^00 0.900 0.007 4 5^00 0.800 0.006 5 3'00 0.667 0.005 6 2.00 0.500 0.003 7 I,30 0.23I 0.001 D I^lO 0.09I 0.0I4 50'00 0.980 yI«w Frequency 8oaIyaio Time Series File:dev16.tof (project area under unmitigated developed conditions) ---AnnnaI Peak Flow Rates --- Flow Bate Rank Time of Peak (CFS) 0.072 6 8/27/0I I8:00 0.050 8 9/I7/02 I7:45 0.135 2 I2/08/02 I7:I5 0.057 7 8/23/04 I4:30 0.076 5 10/28/04 16:00 0.080 4 I0/27/05 I0:45 0.097 3 10/25/06 22:45 0.177 I I/09/08 6:30 Computed Peaks -----FIow Frequency Analysis ------- Peaks - - Bank Detnzu Prob (CFS) Period 0.177 1 100.00 0.990 0.I35 2 25'00 0.960 0.097 3 I0.00 0.900 0.080 4 5^00 0.800 0.076 5 3'00 0.667 0.072 G 2'00 0.500 0.057 7 1.30 0.231 0.050 8 1.10 0.09I 0.163 50'00 0.980 Flow Frequency Analysis Time Series FiIe:mit15.tef (project area under mitigated developed conditions - dispersion installed) ---AonuaI Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.029 6 lO/OD/OO 4:15 0.023 7 1/05/02 15:00 0.074 2 I2/08/02 I7:I5 0.023 8 8/22/04 14:30 0.053 3 II/I7/04 5:00 0.038 5 I0/27/05 I0:45 0.042 4 I0/25/06 22:45 0.II6 I I/09/08 6:30 Computed Peaks -----FIow Frequency Analysis ------- Peaks - - Rank Return Prob (CFS) Period 0.116 1 100.00 0.990 0.074 2 25^00 0.960 0.053 3 I0'00 0.900 0.042 4 5,00 0.800 0.038 5 3.00 0.667 0.029 6 2'00 0.500 0.023 7 I'30 0.23I 0.023 D 1.10 0.09I 0.IO2 50.00 0.980 Appendix D. Hydrologic Model Documentation The following is a description of KCRTS input and output files used in assessing the hydrology of the project area. EXECUTABLE FILES basinsl5.exc: This executable file creates 15-minute time series for all contributing areas to the downstream system. TIME SERIES FILES Design forl5.tsf: Project area under forested conditions. devl5.tsf: Project area under proposed developed conditions. Credits for flow control BMPs are not included in the time series calculations. mitl5.tsf: Project area under proposed developed conditions. Credits for flow control BMPs are included in the time series calculations. Paved driveway areas were modeled as 50% impervious and 50% till grass in modeling the flow control BMPs. GENERAL NOTES 1. Seatac regional rainfall runoff files with a scale factor of 1.0 were used in the hydrologic simulations. 2. R/D facilities were designed with the 8-year time series data set. 1- hour peak flow rates were used for detention calculations. 3. 15-minute peak flow rates were used for conveyance calculations and determining the threshold increase in flow rate due to development on the site. 4. Dispersion flow control BMPs for impervious areas were represented by modeling dispersed areas as 50 percent lawn and 50 percent impervious. Pervious pavement BMPs were represented by modeling paved areas as 50 percent lawn and 50 percent impervious. Appendix E. Special Reports and Studies Separately Bound Reports: Environ , January 25, 2013. Pierson Driveway Wetlands. Seattle. Appendix F. Stormwater Pollution Prevention and Spill Plan Pierson Driveway TIR Stormwater Pollution Prevention and Spill (SWPPS) Plan Pierson Driveway King County, WASHINGTON November 12, 2012 Prepared by Ed McCarthy, PE, PS 9957 171 st Ave SE Renton, WA 98059 TABLE OF CONTENTS INTRODUCTION..................................................................................................1 1.A. SITE INFORMATION....................................................................................1 GroundwaterFlow..............................................................................................1 Sensitive Areas/Receptors.................................................................................1 Potential Spill Sources or Releases...................................................................1 Contractor Personnel.........................................................................................2 1.13. PROJECT SITE DESCRIPTION...................................................................2 Pre-existing Site Conditions...............................................................................2 UnknownConditions..........................................................................................2 1.C. SPILL PREVENTION AND CONTAINMENT................................................3 Spill Prevention Best Management Practices....................................................3 Equipment Staging and Maintenance................................................................3 FuelingArea......................................................................................................3 Hazardous Material Staging Area......................................................................3 Hazardous Waste Storage Area........................................................................4 SpillContainment Methods................................................................................4 1.D. SPILL RESPONSE.......................................................................................4 Mitigating, Removing, and Disposing of Spilled Material...................................5 1.E. STANDBY, ON -SITE MATERIAL AND EQUIPMENT..................................6 1.F. REPORTING.................................................................................................6 1.G. PROGRAM MANAGEMENT........................................................................6 Security.............................................................................................................. 6 SiteInspections..................................................................................................8 General Responsibilities for Personnel..............................................................8 LIST OF TABLES Table 1. Spill Response Equipment Brought On-Site...........................................7 Table 2. Agency Notification Reference List ......................................................... 8 Attachment A. Spill and Incident Report Forms INTRODUCTION This Stormwater Pollution Prevention and Spill (SWPPS) Plan has been prepared for construction of a 5,000 square foot driveway. This is a site -specific plan that outlines the project scope of work (including equipment, materials, and activities) and presents a comprehensive plan to prevent, respond to, and report spills or releases to the environment. 1.A. SITE INFORMATION This SWPPS plan was developed for the drainage improvements required for construction of a residential driveway serving the Pierson Plat in Federal Way, Washington. Groundwater Flow The site is generally underlain by glacial till soils. A seasonally perched water table is likely to occur on portions of the site during the wet winter months. Sensitive Areas/Receptors ■ Construction activities on the project site have the potential to introduce pollutants to adjacent areas and surface water resources. Potential Spill Sources or Releases Potential spill sources at the site include materials and equipment brought on -site and potential unknown site conditions. Equipment and Materials Brought On -site ■ Equipment staging and maintenance areas (fuel, lubricating oil, and hydraulic oil from drill rig, backhoes, bulldozers, water trucks, pickup trucks, support truck equipment, lighting units, pumps, and generators) ■ Fuel staging areas ■ Hazardous material staging ■ Hazardous waste storage Unknown Site Conditions that may Be Encountered No contaminated soil and groundwater are anticipated to be encountered on the project site. Considering the relatively shallow excavations required for construction, dewatering will likely not be required. Construction debris will be produced during demolition of the replaced building and site infrastructure. Contractor Personnel The designated person responsible for managing, implementing, and maintaining this SWPPS plan is Ed McCarthy. Phone numbers for project contact is as follows: Ed McCarthy, Project Engineer, cell 425-736-6016, office 425-271- 5734 Equipment Staging and Maintenance Area. Heavy equipment (backhoes, bulldozers, water trucks, support truck, and pickup trucks) and smaller portable equipment (generators, pumps, and light units) will be stored in a secured equipment parking area. All repairs and routine maintenance will be performed in this area. Fueling Area. No fuel tanks will be stored on site for the project. Hazardous Material Staging Area. No gasoline, oils, and hydraulic fluid will be stored on site. 1.13. PROJECT SITE DESCRIPTION Pre-existing Site Conditions There are no known locations on site where soil and groundwater are contaminated to levels which exceed the state or local discharge limits. Considering the present and past land use of the site, it is unlikely that contamination will be found. Unknown Conditions Potential spill sources at the project site could include: • Dumped waste containers or motor oil. If a tank or pipeline is uncovered during site activities, care will be taken to prevent damage, which could result in a release. 2 1.C. SPILL PREVENTION AND CONTAINMENT Spill Prevention Best Management Practices This section describes spill prevention methods (e.g., Best Management Practices [BMPs]) that will be used for the project. Suggested practices are listed below. Equipment Staging and Maintenance ■ Store and maintain equipment in a designated area. ■ Reduce the amount of hazardous materials and waste by substituting non -hazardous or less hazardous materials. ■ Use secondary containment (drain pan) to catch spills when removing or changing fluids. ■ Use proper equipment (pumps, funnels) to transfer fluids. ■ Keep spill kits readily accessible. ■ Check incoming vehicles for leaking oil and fluids. ■ Transfer used fluids and oil filters to waste or recycling drums. ■ Inspect equipment routinely for leaks and spills. ■ Repair equipment immediately, if necessary. ■ Implement a preventative maintenance schedule for equipment and vehicles. Fueling Area ■ Perform fueling in designated fueling area. ■ Do not "top -off' tanks ■ Use secondary containment (drain pan) to catch spills. ■ Use proper equipment (pumps, funnels) to transfer fluids. ■ Keep spill kits readily accessible. ■ Inspect fueling areas routinely for leaks and spills. Hazardous Material Staging Area Hazardous materials such as fuel will be stored in an offsite location. The onsite storage area locations will be within an authorized staging area and will be prepared as required prior to bringing the materials onsite. The staging of this material will be based on a location that minimizes the possibility of material entering natural or constructed drainage systems. The following BMPs will be implemented: Reduce the amount of hazardous materials and waste by substituting non -hazardous or less hazardous materials. Minimize the quantity of hazardous materials brought on -site. Store hazardous materials in a designated area away from storm drains. 3 ■ Store hazardous materials in covered containers. Hazardous Waste Storage Area ■ Use all products before disposing of the container. ■ Retain the original product label or MSDS. ■ Recycle any useful material (used oil, water -based paint) ■ Segregate wastes by waste type. ■ Minimize the quantity of hazardous waste generated and stored onsite. ■ Arrange for waste disposal before containers are full. ■ Dispose of hazardous waste at an approved waste disposal facility. ■ Train employees in proper hazardous material and waste management. Spill Containment Methods This section identifies the types of secondary containment or diversionary structures that will be used to handle spills. Equipment Staging and Maintenance Area. An equipment leak from a fuel tank, equipment seal, or hydraulic line will be contained within a spill pad placed beneath potential leak sources. Temporary berms will be installed to contain accidental spills at locations within the staging and maintenance area that are within 100 feet of catch basins or flow paths that lead to sensitive receptors. Fueling Area. A spill during fueling operations will be contained within a spill pallet for small container handling. The transfer of fuel into portable equipment will be performed using a funnel and/or hand pump, and a spill pad used to absorb any incidental spills/drips. A leak of a drum will be repaired with a patch kit. A spill response kit will be located near the fueling area for easy access. ■ Hazardous Materials. A spill pad will be used to absorb any incidental spills of hazardous materials such as solvents, paints, and other liquid chemical. Used spill pads will be disposed of in a designated waste bin. 1.1). SPILL RESPONSE Response in the first ten to fifteen minutes is critical to minimize the impacts to human health and the environment and to minimize property damage and cleanup costs. The contractor will respond immediately to spills of regulated materials. The standard approach toward spill response will be as follows: ■ Stop operations. 4 ■ Stop the source of the spill by closing the valve or gate or by some other means. ■ If the spill is moving towards a storm sewer catch basin, put a cover over the grate to stop the flow. Grate covers and sand bags may be needed to control the spill. Use the appropriate material to berm the area to prevent further contamination. ■ Notify the construction site manager. ■ Determine the method of clean up required. All methods shall comply with State and Local requirements for spill response. Clean up must be complete and done immediately. The MSDS sheet for the chemical spilled should be used for the proper method of clean up. Notification and all required paperwork shall be provided to the appropriate agency. ■ Contact a cleanup response firm if necessary. Mitigating, Removing, and Disposing of Spilled Material Only trained personnel will perform spill cleanup activities. A spill response contractor will be responsible for cleanup activities as a result of spills or leaks when the contractor does not have the training, equipment, or materials to cleanup spills. The following cleanup firm will be the primary contact for an emergency response: ■ Ed McCarthy, Project Engineer, cell 425-736-6016, home 425-271- 5734 The following procedures shall be followed subsequent to a spill: Spills Onto the Ground (Soil): — Clean up the spill immediately. — Apply absorbent material, berm, divert or contain the spill. — Collect spilled material and place into labeled drums. — Collect absorbent and other material used to clean up the spill, label the container, and properly dispose of waste at an approved disposal facility. — Notify the project's spill response contractor, if necessary. — Notify the Department of Ecology Spills (360) 407-6300. — Decontaminate the affected area, equipment and surfaces that have contacted the spilled material. — Restore habitat, if necessary. ■ Spills Into Waterways: — Notify the National Response Center and the State of Washington 5 Emergency Management Division. — Notify the project's spill response contractor, if necessary. — Stop the source of the spill immediately. — Shut down all equipment and ignition sources in the area. — Deploy boom and absorbent to contain the spill. — Clean up absorbent and waste materials and dispose of at an approved waste disposal facility. — Decontaminate the affected area, equipment and surfaces that have contacted the spilled material. 1.E. STANDBY, ON -SITE MATERIAL AND EQUIPMENT Spill response equipment will be stored in spill response kits. The project site must have at least one spill response kit, but more than one kit may be necessary or warranted. The locations of all spill response kits at the project site are clearly marked and accessible. The locations will be identified to all personnel prior to beginning work. Table 1 summarizes the spill response material and equipment designated for equipment and maintenance, fueling, hazardous material staging, and hazardous waste storage areas. 1.F. REPORTING The construction manager will be responsible for reporting spill incidents. Table 2 identifies local, state, and federal authorities and private resources that may be used in implementing this SWPPS plan. In addition, any spill occurrence will require the completion of a Spill & Incident Report Form which is included in Attachment A of this report. Attachment A provides a record of spills occurring on the site. The contractor will keep all such records on file. Site security measures, site inspection procedures, and personnel training related to spill prevention, containment, response, management, and cleanup are outlined below. Security Proper site security is important to minimize accidents, trespassing, and potential spills and releases. Equipment staging and maintenance, fueling, hazardous material staging, and waste storage areas for the project will be located in a fenced area. The fence and all heavy equipment are locked at the end of each workday. Only authorized personnel are permitted onto the project site. 0 Table 1. Spill Response Equipment Brought On -Site The following items shall be in a spill kit kept on the site. Spill kits shall be easily carried by two workers and transported in the bed of a pickup truck. Boxes shall be painted safety yellow and labeled: "SPILL CONTAINMENT KIT — EMERGENCY USE ONLY". Item Purpose Quantity SWPPS Plan Reference 1 Emergency response telephone numbers Reference 1 Emergency response handbook Reference 1 Grainger 95- allon over pack 1 95- allon plastic drum 1 SOCs - 3"x4' 4 SOCs - 3"x12' 2 Absorbent Pillows - 18"x18" 4 Disposable bags 10 Oil Absorbent Pads — 16" x 20" 50 Broom 1 Shovel 1 Table 2. Agency Notification Reference List Agency & Responsibilities Phone Contacts Fire Department 911 • Fire fighting • Emergency medical response • Community evacuation Police Department 911 • Police authority City of Federal way Public Works Department (253) 835-2720 Operations and Maintenance • Information on storm drains and other utilities Washington State Department of Ecology Spills (360) 407-6300 Cleanup Program • Reporting spills to soil National Response Center (800) 424-8802 • Reporting spills to water Washington State Emergency Management Division (800) 258-5990 • Reporting spills to water Spill Response Contractor — Certified Cleaning (253) 536-5500 Services, Inc. • Emergency spill response Site Inspections The contractor will conduct daily inspections of the equipment staging and maintenance, fueling, hazardous material staging, and waste storage areas to ensure that spill control measures are in place. Inspections of the project site for general housekeeping and BMPs will be performed weekly. General Responsibilities for Personnel All personnel have responsibility for spill prevention. Any worker who notices a leak will respond as appropriate based on their training, or if a spill has occurred, they will assume a defensive posture by avoiding the area and immediately notifying the site construction manager. 0 The local fire department is responsible for emergency containment procedures when called to the site. The fire department takes measures necessary to prevent fire and explosion and to protect people and property in the event of a fire or explosion. A spill response contractor is responsible for cleanup activities when the contractor does not have the training, equipment, or materials to cleanup spills safely and effectively. 9 ATTACHMENT A: SPILL AND INCIDENT REPORT FORMS Instructions: Complete for any type of petroleum product or hazardous materials/waste spill or incident. Provide a copy of this report to management. 1. Person Reporting Spill or Incident: 2. Type of Spill: 3. Location of Spill: 4. If no spill, describe incident: 5. Actions taken: Name Address Organization Title Telephone Fax Signature Common Name of Spilled Substance Quantity Spilled (Estimate) Concentration (Estimate) Date of Spill Time Spill Time Spill Started AM PM Ended AM PM SPILL TO LAND SPILL TO WATER BODY Name of Site: Name of Water Body: Street Address: Location of Discharge with Reference to Fixed Point: City/Town: Description of Area from which spilled material may reach: County: 6. Person responsible for managing termination/ closure of incident or spill: Name: Phone: Fax: January 25, 2013 Electronic Mail Mr. Dick Pierson 3516 South 336th Street Federal Way, WA 98001 Re: Pierson Driveway Wetlands Dear Mr. Pierson: At your request, ENVIRON conducted a site investigation to determine if there have been any changes in wetland boundaries delineated on your properties in Federal Way. This investigation focuses on the three, undeveloped King County tax parcels (06143600657 [Lot C], 6143600451 [Lot B] and 6143600450 [Lot A]). As you know, I completed a wetland delineation in 2005 as required for your application to complete a boundary line adjustment that resulted in the three parcels identified above. The delineated wetland boundaries were confirmed by King County as stated in the Ecological Solutions' April 2006 addendum to the March 2005 delineation report. The purpose of this report is to update the wetland classifications as required by the City of Federal Way (City) for permitting the proposed driveway access road from South 334th Street to Lots A and B. Per Matt Herrera's pre -application conference summary letter dated April 10, 2012 and addressed to Mr. Eric LaBrie, ESM Consulting Engineers, it is assumed that the stream/ditch on the northern portion of Lot C is rated as major for the purposes of this proposed access road permit application. A brief summary of my findings and rationale for the wetland classifications is provided below. APPROACH The approach used to identify whether wetland boundaries have changed and to classify existing wetlands is provided as follows. Onsite Wetlands The onsite portions of existing wetlands were re-established and identified with red surveyor flagging by others based upon the initial surveyed wetland boundaries. Portions of my old wetland boundary flags were clearly visible in many locations where red flagging was hung re-establishing the delineated, confirmed, and surveyed wetland boundaries. The entire western boundaries marked by the red flagging were walked on November 27, 2012. There has been no change in wetland parameters within the wetlands. The absence of any continuous hydric soils and wetland hydrology between the two wetlands was confirmed by digging a soil pit in the middle of the narrow ditch between the south end of Wetland 2 and north end of Wetland 1. Collective observations that I have made over the years and those of the City's wetland consultant Otak and others were used to classify the wetlands using the Federal Way Revised Code (FWRC) 19.175.020. Otak's Doug Gresham completed a peer review of the wetland delineation and confirmed the delineated wetland boundaries as indicated in his January 29, 2007 Technical Memorandum titled Pierson Property Sensitive Areas Review addressed to Greg Fewins, Deputy Director, Community Development Services Planning Division, City of Federal Way. This Technical Memorandum is hereafter referred to as Otak. 901 Fifth Avenue, Suite 2820, Seattle, WA 98614 www.environcorp.com Tel: +1 206,336,1650 Fax: +1 206,336,1651 Dick Pierson - 2 - January 25, 2013 Offsite Wetlands Offsite wetlands were delineated by Talasaea Consultants (Talasaea) for the East Campus South Residential Development, which abuts this site to the east. Four lobes of a wetland identified as Wetland B identified by Talasaea are adjacent to the east boundary of Lot C. A fifth lobe is located in within and extends south of South 336t" Street and the waterline easement. Though no wetland category is provided in the August 5, 2003 letter regarding Wetland and Buffer Restoration Plans addressed to Ms. Deb Barker, Associate Planner at the City, the letter does indicate that FWRC requires a 100-foot buffer. That document also indicates that Wetland B consists of a series of 5 wetland areas connected by narrow ditches. Talasaea assumed that there was hydric soil and hydrologic continuity and connectivity between all of these lobes in their June 2002 investigation. There is not continuous hydric soil or hydrologic connectivity as described by both myself and Otak. I examined the offsite lobes delineated by Talasaea during my onsite investigation on November 27, 2012. Total precipitation at Sea-Tac International Airport (NCDC Station 457473) was well above average for the months of October and November, drier than average in July and August, and wetter than average May through July. Table 1 shows the monthly total precipitation and standard deviation around the mean compared to the total monthly precipitation. Immediately preceding my site investigation weather has been much wetter than average. Table 1. Average and total monthly precipitation for Sea-Tac Airport (NCDC Station 457473) MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER AVGa 1.76 1.47 0.75 1.07 1.74 3.51 6.11 STD 0.87 0.84 0.53 1.04 4.35 4.91 2.79 2012b 2.05 2.96 1.04 0.00 0.03 6.71 8.28 a Long-term average for the National Climatic Data Center Station at Sea-Tac International Airport for the period of record from 1948 through 2012 http://www.wrcc.dri.edu/cgi-bin/cliMAIN.pI?wa7473. b Monthly total precipitation. Two days missing data for November FWRC 19.175.020 Wetland categories and standard buffers The following Wetland categories and standard buffers in the FWRC are quoted directly from the current Zoning and Development Code accessed online December 12, 2012 at http://www.codepublishing.comMA/FederalWay/: (1) Regulated wetlands are classified into the following categories: (a) Category I wetlands meet one of the following criteria: (i) Contain the presence of species or documented habitat recognized by state or federal agencies as endangered, threatened or potentially extirpated plant, fish or animal species; or (ii) Contain the presence of plant associations of infrequent occurrence, irreplaceable ecological functions, or exceptional local significance including but not limited to estuarine systems, peat bogs and fens, mature forested wetlands, groundwater 901 Fifth Avenue, Suite 2820, Seattle, WA 98614 www.environcorp.com Tel: +1 206,336,1650 Fax: +1 206,336,1651 Dick Pierson - 3 - January 25, 2013 exchange areas, significant habitat or unique educational sites; or (iii) Have three or more wetland classes, one of which is open water. (b) Category II wetlands are greater than 2,500 square feet in area, do not exhibit the characteristics of Category I wetlands, and meet one of the following criteria: (i) Are contiguous with water bodies or tributaries to water bodies which under normal circumstances contain or support a fish population, including streams where flow is intermittent; or (ii) Are greater than one acre in size in its entirety; or (iii) Are less than or equal to one acre in size in its entirety and have two or more wetland classes, with neither class dominated by nonnative invasive species. (c) Category I II wetlands are greater than 2,500 square feet in area and do not exhibit those characteristics of Category I or II wetlands. (2) Standard buffer widths for regulated wetlands are established as follows: (a) Category I wetlands shall have a standard buffer width of 200 feet. (b) Category II wetlands shall have a standard buffer width of 100 feet. (c) Category III wetlands shall have a standard buffer width of 50 feet for wetlands that are greater than 10,000 square feet in area, and shall have a standard buffer width of 25 feet for wetlands that are between 2,500 to 10,000 square feet in area. This code was used to classify the wetlands and identify the required standard buffers. RESULTS The collective observations and results of onsite and offsite wetland delineation are used to update the previous wetland report and classify the wetlands. Reduction of the major stream buffer is required to permit the proposed access road under the City's Process IV procedure. A wetland/stream buffer mitigation plan (buffer enhancement plan) will be provided separately. There remain two wetlands on the site as shown in Figure 1. There are no surface water connections or continuous hydric soils between Wetland 1 and Wetland 2 as explained in more detail in the next subsection. Discontinuous Wetland Characteristics A test pit (Figure 1) excavated in the bottom of the narrow ditch constructed to drain the wetlands contained no positive indicators of hydric soils or wetland hydrology, despite the wetter than average conditions preceding this most recent investigation. The test pit was dug to a total depth of 17 inches below the ground surface. From 0 to 9 inches below the ground surface, there was a very dark grayish brown (10YR 3/2) gravelly sandy loam, which was moist but not saturated and contained no redoximorphic features. Below this layer from 9 to 15 inches was a dark brown (10YR 3/3) gravelly sandy loam, which was moist and approached saturation near the interface with the layer below but was not saturated. This second layer contained a few, fine to medium, redox concentrations. Beneath this layer from 15 to more than 17 inches below the ground surface was a light yellowish brown (2.5Y 6/3) to pale yellow (2.5Y 7/3) weakly cemented gravelly sandy loam layer. This layer appeared to be weathered glacial till. This layer also was unsaturated. About 50 percent of this layer consisted of yellowish brown (10YR 5/6) and brownish yellow (10YR 6/8) redox concentrations. There were no positive indicators of hydric soils in the test pit. Rather, observed soils are consistent with and confirm the map unit designation of Alderwood gravelly sandy loam 0 to 6 percent slopes (Attachment A). Alderwood gravelly sandy loam soils are non-hydric. 901 Fifth Avenue, Suite 2820, Seattle, WA 98614 www.environcorp.com Tel: +1 206,336,1650 Fax: +1 206,336,1651 Dick Pierson - 4 - January 25, 2013 Inclusions of hydric soils, such as those observed in the delineated wetlands, are much different. These are present within the Wetlands 1 and 2, which are located in depressions to the north and south of the topographic saddle. Typical hydric soils in the wetlands consist of a very dark gray (10YR 3/1) silt loam with abundant redoximorphic features in the surface layer. The surface layer is underlain by a very dark brown (10YR 2/2) sandy loam with common and prominent redoximorphic features as indicated in the original wetland delineation report. It is important to note the absence of any positive indicators of wetland hydrology in the topographic saddle between Wetlands 1 and 2 and that there have been significant changes in the catchment or contributing drainage areas to these wetlands. The topographic contours in Figure 1 clearly show there is a topographic saddle between Wetland 1 and Wetland 2. This is the area where the narrow ditch was excavated. The ground surface here is a foot or more higher than the shallow depressions where the closed depressional (Wetland 2) and depressional outflow wetlands (Wetland 1) are located. There was up to six inches of standing water in the offsite portion of Wetland 2 to the northeast of the north end of the ditch. The surface of the water was at least 12 inches below the bottom of the excavated ditch. Both Talasaea and Otak noted this ditch in their reports. Otak agreed that there was no hydrologic connection between the two wetlands. Even deeper standing water was observed in depressional areas within Wetland 1. Surface water elevation at the south end of the ditch was about 1.5 feet below the bottom of the south end of the narrow ditch between the wetlands at the time of my site visit. Furthermore, you have indicated never seeing any surface water in the excavated ditch between these wetlands in the 30 plus years you have lived on the property. Thus, it is clear that neither hydric soils nor wetland hydrology are present in the ditch or topographic saddle between Wetlands 1 and 2. Therefore, it is considered upland. Contributing drainage area to both Wetland 1 and Wetland 2 has been reduced by the Quadrant East Campus Residential development to the east. This reduction in the total area contributing to the hydrology of these wetlands has likely altered the hydrologic regime of these wetlands making them drier. According to your personal communication with Kevin Peterson, the Engineering Plans Reviewer for the City of Federal Way Public Works Department, roof runoff from residences in the East Campus development that would historically have contributed to shallow groundwater recharge and interflow to Wetlands 1 and 2 as shown by the topographic gradient in Figure 1 is now collected and routed to stormwater management facilities at the south end of that development thereby bypassing the wetlands. This has reduced the area draining to these wetlands likely contributing to reduced groundwater recharge and drier conditions. In conclusion, there is no wetland hydrology or hydric soils in the narrow ditch or topographic saddle between Wetland 1 and Wetland 2. As noted in Ed McCarthy's Level 1 Downstream Drainage Analysis Wetland 2 is within the north basin and Wetland 1 is within the south basin. Surface flow from the north basin is towards the north through the stream/ditch and the concrete culvert beneath South 334t" Street as depicted in Figure 1. Surface flow from Wetland 1, which is within the area identified by Mr. McCarthy as the south basin, is to the south. Wetland Classification The previously delineated, confirmed, and surveyed wetland boundaries on the site have not changed. Clear indicators of hydrophytic vegetation, wetland hydrology, and hydric soils persist within the previously identified wetland areas despite the considerable reduction in contributing drainage area from the Quadrant East Campus Residential development to the east. Wetland 1 contains two wetland vegetation classes: scrub -shrub and forested. As was noted in the original 901 Fifth Avenue, Suite 2820, Seattle, WA 98614 www.environcorp.com Tel: +1 206,336,1650 Fax: +1 206,336,1651 Dick Pierson - 5 - January 25, 2013 report and has been confirmed by Otak, there are no listed species present, nor any documented habitat recognized by state or federal agencies for such species nor are there plant associations of infrequent occurrence, irreplaceable ecological functions, or wetlands of local significance as identified in FWRC 19.175.020.1.a.ii. Category II wetlands have a standard buffer of 100 feet, according to FWRC 19.175.020.2.b. Wetland 2 contains only one wetland vegetation class. In places, Himalayan blackberry, an invasive species, is a codominant species. Total area of this wetland is approximately 8,734 square feet as shown in Figure 1. It does not exhibit characteristics of either a Category I or Category II wetland and is thus classified as a Category III wetland. In 2007, the City's consultant (Otak) agreed with this Category III classification. Category III wetlands between 2,000 and 10,000 sq. ft. have a standard buffer of 25 feet, according to FWRC 19.175.020.2.c. Yours sincerely Scott Luchessa Senior Science Advisor I Certified Ecologist Enclosures: Figure 1. Delineated Wetland Boundaries and Standard Buffers Attachment A. Soils in the Vicinity of the Pierson Driveway 901 Fifth Avenue, Suite 2820, Seattle, WA 98614 www.environcorp.com Tel: +1 206,336,1650 Fax: +1 206,336,1651 Attachment A Soils in the Vicinity of the Pierson Driveway Soil Map —King County Area, Washington (Soils in the Vicinity of the Pierson Driveway) 470 18' 11" 47' 18' 0" Map Scale: 1:2,440 if printed on A size (8.5" x 11") sheet. Meters 0 30 60 120 180 Feet 0 100 200 400 600 USDA Natural Resources Web Soil Survey IiiiiiiiN Conservation Service National Cooperative Soil Survey 12/12/2012 Page 1 of 3 47' 18' 11" 47' 18' 0" Soil Map —King County Area, Washington (Soils in the Vicinity of the Pierson Driveway) MAP LEGEND MAP INFORMATION Area of Interest (A01) Very Stony Spot Map Scale: 1:2,440 if printed on A size (8.5" X 11 ") sheet. Area of Interest (AOI) Wet Spot The soil surveys that comprise your AOI were mapped at 1:24,000. Soils Soil Map Units Other Warning: Soil Map may not be valid at this scale. Special Point Features Special Line Features Enlargement of maps beyond the scale of mapping can cause QJ Blowout Gully misunderstanding of the detail of mapping and accuracy of soil line ® Short Steep Slope placement. The maps do not show the small areas of contrasting Borrow Pit soils that could have been shown at a more detailed scale. Other j� Clay Spot Political Features Please rely on the bar scale on each map sheet for accurate map y Closed Depression Cities measurements. Gravel Pit Water Features Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nres.usda.gov A Gravelly Spot Streams and Canals Coordinate System: UTM Zone 1ON NAD83 Landfill Transportation This product is generated from the USDA-NRCS certified data as of Lava Flow +++ Rails the version date(s) listed below. 4L Marsh or swamp Interstate Highways Soil Survey Area: King County Area, Washington Mine or Quarry US Routes Survey Area Data: Version 7, Jul 2, 2012 O Miscellaneous Water Major Roads Date(s) aerial images were photographed: 7/24/2006 p Perennial Water Local Roads The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background Rock Outcrop imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. + Saline Spot Sandy Spot Severely Eroded Spot Sinkhole , Slide or Slip p` Sodic Spot Spoil Area Stony Spot USDA Natural Resources Web Soil Survey 12/12/2012 all Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —King County Area, Washington Soils in the Vicinity of the Pierson Driveway Map Unit Legend King County Area, Washington (WA633) Map Unit Symbol Map Unit Name Acres in AOI Percent of A01 AgB Alderwood gravelly sandy loam, 0 to 6 percent slopes 30.6 100.0% Totals for Area of Interest 30.6 100.0% EJSDA Natural Resources Web Soil Survey 12/12/2012 Conservation Service National Cooperative Soil Survey Page 3 of 3