22-103187 - Permit FinalM=1
City of Federal Way Permit #:22-103187-00-CO
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253)835-2609
Project Name: FALCON BUILDING
Project Address: 33930 WEYERHAEUSER WAYS Parcel Number: 215466 0020
Project Description: BLUEBEAM - Construction of new exit corridor for existing vacant 2nd floor. Corridor in
preparation of future TI build out pending future tenants. There are no tenants associated with
this permit, only building owner corridor. No structural work.
Applicant Contractor Lend.er
FIK MULUGETAMJR NORTHWAY CONSTRUCTION OWNER IS LENDER
DEVELOPMENT INC
6725 116TH AVE NE SUITE 100
KIRKLAND WA 98033 PACIFIC WA 98047
N
M
Additional Permit Information
Mechanical to be Included? ............ ........................ No Plumbing Work Valuation?..... ......... .............. 0
Mechanical Work Valuation? .................................. 0 Number of Stories................................................... 2
Is this an Online or O.T.C. application? .................. No
Plumbing to be Included? ........................................ No
Zoning Designation ................................................. OP-2
Total Valuation: 42,5 10.00
Permit for Building Shell Only?., ......... 4 ................. No
Comprehensive Plan Designation ........................... Office Park
. PM E^T #1 7=77, V I W
Permit Issued on Friday, Autiust 19, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Owner or agent: MEE the City of Federal Way, Date:
gg Alm
191C] W Kai 9 Lei go a X#1111 nev h-jHLLt*jU-= I M I
Footings/Setback I'll(4110)
• Re -steel (4215)
Slab/Concrete Floor (4255)
Approved to place concrete
•Approved to place concrete or grout
Approved to place concrete
y
Date
Date Y
Date
R4
Underfloor Framing (4285)
El
Floor Sheathing (4105) F11
Fire/Draft Stops (4095)
Approved to sheath floor
Approved to install flooring
Approved
By
Date
By
Date By
-- — -------------
Date
— - ----- — -------- ------------------- — --- - -----------
Prior to scheduling a Framing inspection-
El
. ...... . ......
Framing (4120)
Insulation (4150)
Electri al, Plumbing & Mechanical Rough'in I
Approved to iMulaw
Approved to install wallboard
and fir raft Stop inspections must be signe
off and approved. IBC 109.3.4
By
Date By
Date
El
Gypsum Wallboard Nailing (4130)
uspended Ceiling Grid (4265)
Final - S K F & R (4060)
Approved to install mud & tape
Approved to drop tile
Approved
By
Date
By
Date By
Date
Final - Planning
Final - Building (4050)
By
Approved
Date
By
Approved
AtJ Date
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date