Loading...
21-101294 - Permit FinalBuilding - Single Family City of Federal Way Permit #:21-101294"OO'SF Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TESSEMA Project Address: 2614 S 275TH PL Parcel Number: 796820 0180 Project Description: BLUEBEAM - Convert garage to habitable space. Includes plumbing and mechanical. Owner Applicant Contractor Lender TITEM SHIKUR MESFIN TESSEMA OWNER IS CONTRACTOR OWNER IS LENDER 2614 S 275TH PL 2614 S 275TH PL AVE FEDERAL WAY WA 98003 FEDERALWAY WA 98003 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 OCCY2anc Class: R-3 Construction i2e 12e V - B Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Occupancy #1 - Construction Type..... .... Type V - B Mechanical to be Included?...... Yes Plumbing Work Valuation? ..................................... 4000 Mechanical Work Valuation?.................................. 1500 Number of Stories ................................................... I Is this an Online or O.T.C. application?.................. No Plumbing to be Included? ........................................ Yes Occupancy # I - Use ................................................ Residence (I or 2 family) Comprehensive Plan Designation ... _­1­1 .......... ­ SF - High -Density Zoning Designation ................................................. RS 7.2 Residential Total Valuation: 25,500.00 PERMIT EXPIRES Tuesday, I February, 2022 Permit Issued on Thursday, August 5, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: V PERMIT : 2110129400 Address: 2614 S 275 Project: MESFIN TESSEMA FEDERAL WAY WA 9 -72 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. L2J Plumbing Groundwork (190) Underfloor Framing (425) Ui Floor Sheathing (105) Approved to cover Approved to sheath floor Approved to install flooring y ate y ` ate (I �, y ate I 4 Shear Walls (4245) Roof Sheathing (422) Rough Plumbing (230) Approved to install siding Approved to install roofing Approved )ZZ y �j} Date (� 2 } y Date By 4W Date 10 MechanicalRough-in (4165) El Gas Piping (4125) El Fire raft Stops (095) Approved Approved to release test Approved y ate y y ate y ^ Date Z g g" p r to schedulin a Framin tos ection;ical, 40 Framing (412) I) Insulation (4150) Plumbing &Mechanical Rough -in E Approved to insulate Approved to install wallboard e/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 y ateAk y ate 9 Gypsum Wallboard Nailing (130) 13 Final- Mechanical (065) t Final - Plumbing (4075) Approved to install mud & tape Approved Approved y Date N\ y ate Ti 44 y ate ] Final - Building (4 5 ) Approved y r� NC Date G Rough Electrical Final Electrical El Right of Way Approved Approved; Approved y Date By Date By Date