22-100299City of Federal Way j o _ _
Community Development Dept Permit '
SF
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Far,: (253) 835-2609
Project Name: OVERMAN
Project Address: 36005 3RD AVE S Parcel Number: 113780 0200
Project Description: BLUEEA - cut down existing non bearing wall to pony wall height (34 1/2 ", relocate
range, replace kitchen garden window with same size and same location, sink location remains
the same, range location remains the same. replace flooring, cabinets and countertops. new
sink and faucet. Includes plumbing and mechanical.
Owner Applicant Contractor Lender
GURDEEP OVERMAN PATRICIA MATTESFINE DESIGN PATRICIA MATTESFINE DESIGN OWNER IS LENDER
36005 3RD AVE S INTERIOR REMODELING INTERIOR REMODELING
FEDERAL WAY WA 98003 PO BOX 1405 PO BOX 1405
GRAHAM WA 98338 GRAHAM WA 98338
Includes:
#1
Occu ancy Class: R-3
Construction Type. Type V B
occupancy Load:
loor Area (sa. ft.
#2 1 #3 1 #4
Additional Permit Information
Occupancy #1 - Construction Type.. .......:aa..„... Type V - B Mechanical to be Included?___. . ,„. ..... ... .. ...... Yes
Plumbing Work Valuation? ..................................... 750 Mechanical Work Valuation?. ......... ............> 250
Number of Stories ................................................... l
Plumbing to be Included? ........................................ Yes
Comprehensive Plan Designation....,, SF - High -Density
Residential
Total Valuation: 50,000.00
Is this an Online or O.T.C. application? .................. No
Occupancy #1 - Use .................... Residence (I or
family)
Zoning Designation.„. RS 15.0
Mechanical Fixtures
Fans 1
Plumbing Fixtures
Sinks 1
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: . Date,
1.,
I'
� ImillilliII1111=1
0
PERMIT : 2210029900
Address:
36005 3RD AVE S
Project: JOHN OVERMAN3-
62
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule
inspections as appropriate. Work must not
be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the
inspection sequence. On -going inspections are logged on
the back of this card.
Plumbing Groundwork (4190)
2
Underfloor Framing (425)
Floor Sheathing (4105)
Approved to cover
Approved to sheath floor
Approved to install flooring
y
Date
By
Date
By
Date
FAI
Shear Walls (4245)
Roof Sheathing (4220)
Rough Plumbing (4230)
Approved to install siding
Approved to install roofing
Approved
y
Date
By
Date
By
Date
Mechanical Rough -in (4165)
$
Gas Piping (125)
0
Fire/Draft Stops (4095)
Approved •
Approved to release test
Approved
y
Date
By
Date
By
Date
Prior to scheduling Framing inspection;
1B
Framing (4120)
11
Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in
Approved to insulate
Approved to install wallboard
and
Fire/Draft Stop inspections must be signed- ?
off and approved. IBC 109.3.4
y
L4jQ Date
By
Date
12
Gypsum Wallboard Nailing (4130)
t
Final - Mechanical (4065)
14
Final - Plumbing (075)
Approved to install mud & tape
Approved
Approved
y
Date
By
Date
By
Date
15
Final - Building (4050)
Approved
y
Date
7-
Rough Electrical
Final Electrical
El
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date