Loading...
22-100299City of Federal Way j o _ _ Community Development Dept Permit ' SF 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Far,: (253) 835-2609 Project Name: OVERMAN Project Address: 36005 3RD AVE S Parcel Number: 113780 0200 Project Description: BLUEEA - cut down existing non bearing wall to pony wall height (34 1/2 ", relocate range, replace kitchen garden window with same size and same location, sink location remains the same, range location remains the same. replace flooring, cabinets and countertops. new sink and faucet. Includes plumbing and mechanical. Owner Applicant Contractor Lender GURDEEP OVERMAN PATRICIA MATTESFINE DESIGN PATRICIA MATTESFINE DESIGN OWNER IS LENDER 36005 3RD AVE S INTERIOR REMODELING INTERIOR REMODELING FEDERAL WAY WA 98003 PO BOX 1405 PO BOX 1405 GRAHAM WA 98338 GRAHAM WA 98338 Includes: #1 Occu ancy Class: R-3 Construction Type. Type V B occupancy Load: loor Area (sa. ft. #2 1 #3 1 #4 Additional Permit Information Occupancy #1 - Construction Type.. .......:aa..„... Type V - B Mechanical to be Included?___. . ,„. ..... ... .. ...... Yes Plumbing Work Valuation? ..................................... 750 Mechanical Work Valuation?. ......... ............> 250 Number of Stories ................................................... l Plumbing to be Included? ........................................ Yes Comprehensive Plan Designation....,, SF - High -Density Residential Total Valuation: 50,000.00 Is this an Online or O.T.C. application? .................. No Occupancy #1 - Use .................... Residence (I or family) Zoning Designation.„. RS 15.0 Mechanical Fixtures Fans 1 Plumbing Fixtures Sinks 1 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: . Date, 1., I' � ImillilliII1111=1 0 PERMIT : 2210029900 Address: 36005 3RD AVE S Project: JOHN OVERMAN3- 62 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Plumbing Groundwork (4190) 2 Underfloor Framing (425) Floor Sheathing (4105) Approved to cover Approved to sheath floor Approved to install flooring y Date By Date By Date FAI Shear Walls (4245) Roof Sheathing (4220) Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved y Date By Date By Date Mechanical Rough -in (4165) $ Gas Piping (125) 0 Fire/Draft Stops (4095) Approved • Approved to release test Approved y Date By Date By Date Prior to scheduling Framing inspection; 1B Framing (4120) 11 Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed- ? off and approved. IBC 109.3.4 y L4jQ Date By Date 12 Gypsum Wallboard Nailing (4130) t Final - Mechanical (4065) 14 Final - Plumbing (075) Approved to install mud & tape Approved Approved y Date By Date By Date 15 Final - Building (4050) Approved y Date 7- Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date