21-103509-Permit FinalA
City of Federal Way Permit #-.21-103509-00-SF
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) -
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HANSON
Project Address: 2707 SW 322ND ST Parcel Number: 873180 0800
Project Description: BLUEBEAM - Extend the master bedroom within the existing exterior porch area and remodel
of master bathroom including adding a double vanity and walk in shower. No Mechanical.
Plumbing included.
Owner Applicant Contractor Lender
BRIAN HANSON BRIAN HANSON OWNER IS CONTRACTOR OWNER IS LENDER
2707 SW 322ND ST 2707 SW 322ND ST
FEDERAL WAY WA 98023 FEDERAL WAY WA 98023
FA
INTMVIIETWIl!
Occupang Class:
EEMUMM MM-
T-M
Occiipancy #I - Construction rype........ ........... Type V - B Mechanical to be Included?,___.. ... I—— .........a_..No
Plumbing Work Valuation? ..................................... 2000 Mechanical Work Valuation?.. ......... .............. 0
Number of Stories ................................................... I Is this an Online or O.T.C. application?.................. No
Plumbing to be Included? ........................................ Yes Comprehensive Plan Designation........................... SF - High -Density
Residential
Zoning Designation ................................................. RS 7.2
Total Valuation: 12,120.64
I I -
n
I hereby certify that the above information is correct and that the construction on the above described prope
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Ci Of FbdefblWaV�
Owner or agent: rmE= Date:--,,,,,
0*0
THIS CA S TON -SITE
CITY OF00100*
Federal Way
Construction'..Ins ection, Record
INSPECTION I E UE TS: $ 5-3050
(53)
PERMIT2110350900
Address: 2707 SW 32
Project: BRIAN HANSONAY WA 98023-2211
Scheduled inspections may failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
El
SWM Precon Site Mtg (0)
2 Initial Erosion Control (365) ,3 Plumbing Groundwork (41)
Approved
To be done PRIOR to breaking ground Approved to cover
y
Date
By Date By Date
Underfloor ra i (285)
Floor Sheathing (1 5) 6 Shear Walls (2 5)
Approved to sheath floo
Approved to install flooring Approved to install siding
y
Date
By Date By Date
D
Rough Plumbing
Fire Stops (409'
Roof Sheathing ( 22)
(4230)
raft 1
Approved to install roofing
Approved
J Approved
y
Date
By Date
By Date
Interim Erosion Control (437)
1 Framing ( 12) f ' ,` � j l
Prior to scheduling a Framing inspectdghm
ApprovedApproved
Electrical, Plumbing &s Mechanical Routo insulate
and Fire/Draft Stop inspections must be
y
ate
off and approved. IBC 109.3.4y Date
Insulation (150)
Gypsum Wallboard Nailing (13)
14 Final Erosion Control (4375)
Approved to install wallb Gard
Approved to install mud & t pc
Approved
y
Ad Date
By 'p Date ' .� e 7,',
y Date
Final - Plumbing (4075)
Final - Building (4050)
Approved
Approved
y
ate . "
y ateY—V
El
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
y
Date
By
Date
By
Date