Loading...
21-103509-Permit FinalA City of Federal Way Permit #-.21-103509-00-SF Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) - Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HANSON Project Address: 2707 SW 322ND ST Parcel Number: 873180 0800 Project Description: BLUEBEAM - Extend the master bedroom within the existing exterior porch area and remodel of master bathroom including adding a double vanity and walk in shower. No Mechanical. Plumbing included. Owner Applicant Contractor Lender BRIAN HANSON BRIAN HANSON OWNER IS CONTRACTOR OWNER IS LENDER 2707 SW 322ND ST 2707 SW 322ND ST FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 FA INTMVIIETWIl! Occupang Class: EEMUMM MM- T-M Occiipancy #I - Construction rype........ ........... Type V - B Mechanical to be Included?,___.. ... I—— .........a_..No Plumbing Work Valuation? ..................................... 2000 Mechanical Work Valuation?.. ......... .............. 0 Number of Stories ................................................... I Is this an Online or O.T.C. application?.................. No Plumbing to be Included? ........................................ Yes Comprehensive Plan Designation........................... SF - High -Density Residential Zoning Designation ................................................. RS 7.2 Total Valuation: 12,120.64 I I - n I hereby certify that the above information is correct and that the construction on the above described prope and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Ci Of FbdefblWaV� Owner or agent: rmE= Date:--,,,,, 0*0 THIS CA S TON -SITE CITY OF00100* Federal Way Construction'..Ins ection, Record INSPECTION I E UE TS: $ 5-3050 (53) PERMIT2110350900 Address: 2707 SW 32 Project: BRIAN HANSONAY WA 98023-2211 Scheduled inspections may failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El SWM Precon Site Mtg (0) 2 Initial Erosion Control (365) ,3 Plumbing Groundwork (41) Approved To be done PRIOR to breaking ground Approved to cover y Date By Date By Date Underfloor ra i (285) Floor Sheathing (1 5) 6 Shear Walls (2 5) Approved to sheath floo Approved to install flooring Approved to install siding y Date By Date By Date D Rough Plumbing Fire Stops (409' Roof Sheathing ( 22) (4230) raft 1 Approved to install roofing Approved J Approved y Date By Date By Date Interim Erosion Control (437) 1 Framing ( 12) f ' ,` � j l Prior to scheduling a Framing inspectdghm ApprovedApproved Electrical, Plumbing &s Mechanical Routo insulate and Fire/Draft Stop inspections must be y ate off and approved. IBC 109.3.4y Date Insulation (150) Gypsum Wallboard Nailing (13) 14 Final Erosion Control (4375) Approved to install wallb Gard Approved to install mud & t pc Approved y Ad Date By 'p Date ' .� e 7,', y Date Final - Plumbing (4075) Final - Building (4050) Approved Approved y ate . " y ateY—V El Rough Electrical Final Electrical Right of Way Approved Approved Approved y Date By Date By Date