Loading...
22-101423 - Permit FinalBuilding _ Single mily City of Federal way Permit • _ _ _ Community Development Dept • 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-35 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TEFERA Project Address: 32304 9TH AVE S Parcel Number: 150240 0570 Project Description: BLUE EA - Interior remodel to convert residence to adult family home. Includes plumbing and mechanical. Owner Applicant Contractor Lender DESTA TEFERA CARMELO LAVISTECNL DESIGN OWNER IS CONTRACTOR OWNER IS LENDER 32304 9TH'AVE S 216 NE 175TH ST FEDERAL WAY WA 98003 SHORELINE WA 98155 Census Category: 43 - Residential al/add - no change in number of units Includes: #1 #2 #3 #4 Occu anc Class: R-3 Construction T e: Type V - B Occupancy Load; Floor Area (sq. ft.) Occupancy #1 - Construction Type.. .,„...„;,,,.,...; Type V - B Mechanical to be Included? ..................................... Yes Plumbing Work Valuation? ............... ................. 1000 Mechanical Work Valuation?„ 300 Number of Stories..,...... .... ........... .......:....... I Is this an Online or O.T.C. application? ............ No Plumbing to be Included? ........................................ Yes Occupancy #1 -Use... Residence (1 or 2 family) Comprehensive Plan Designation__ .„.,,„,,,„„„.... SF - High -Density Zoning Designation... .......;. RS 7.2 Residential Total Valuation: 10,000.00 Mechanical Fixtures Fans 1; Plumbing' Fixtures Lavatories 1 Showers 1 Water Closets Mesday, 25 10etober,I Thursday,Permit Issued on I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Owner or agent, the City of Federal Way. Date'. Mai CITY orFederal Way , I THIS • 1 IS TO REMAIN ON -SITE Construction Record INSPECTION rr PERMIT : 22 1 1423Address: 32304 9TH AVES Project: DESTA HABTEMARIAM TEFERA FEDERAL WAY WA 3-592 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right; top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Plumbing Groundwork (4190) Underfloor Framing (4285) 3 Floor Sheathing (4105) Approved to cover Approved to sheath floor Approved to install flooring y Date By Date By Date Shear Walls (4245) El Roof Sheathing (4220) I I Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved y Date By Date B y Date 7 Mechanical Rough -in (4165) El Gas Piping (125) El Fire raft Stops (4095) Approved Approved to release test Approved By..Z" Date By Date By Date scheduling Framing inspection; tQ Framing (4120) l't Insulatl® (150) =Electrical, g & Mechanical Rough -in Approved to insulate Approved to install wallboard inspections must be signed - roved. IBC 109.3.4 By ' , ' Date i Z By Date l Gypsum Wallboard Nailing (4130) Final - Mechanical (4065) t Final - Plumbing (4075) Approved to install mud & tape Approved Approved y Date By l „ Datei "a -f By Date t Final - Building (4050) Approved By Date 1 - Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date