Loading...
21-101517 - PERMIT FINAL(i 1 City of Federal way Permit • - Community Development Dept.. • 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CHELSEA COURT CONDOMINIUMS Project Address: 2502 S 317TH ST Parcel Number: 154180 0000 Project Description: BLUEBEA - Like -in -kind repair to fire -damaged roof and wall framing. Includes plumbing and mechanical. Owner Applicant Contractor Lender CHELSEA COURT MICHAEL S1 R CONSTRUCTION CONDOMINIUMS ASSOCIATION BRAMHALLDEGENKOLB 14751 N KELSEY ST SUITE 561 2503 S 317TH ST ENGINEERS MONROE WA 98272 FEDERAL WAY WA 98003 600 UNIVERSITY ST W SUITE 720 SEATTLE WA 98101 Includes: # 1 #2 #3 #4 OCCU arlcy Class: R-2 Construction Type-, Type V - B Occupancy Load: Floor Area (sq. ft.) •• . ' [i it • u. �r, Occupancy #1 - Construction Type....._., .... ____ Type V - B Mechanical to be Included? ................... . ,.....:...,., No Plumbing Work Valuation?....... .............................. 10000 Mechanical Work Valuation?................................. 6000 Number of Stories. ..,...... 2 Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only? ....... ............... ........ No Plumbing to be Included?........................................ No Occupancy 41 -Use ................................................ Apartment House Comprehensive Plan Designation ........, City Center Frame Zoning Designation ..,.,,.... CC-F Total Valuation: 500,000.00 Mechanical Fixtures Fans 24 Fireplace Inserts 6 Hot Water Tanks 10' Plumbing Fixtures Bathtubs 7 Dishwashers 7 Lavatories I Water Closets 7 CONDITIONS: uired for fire sprinkler system. December,'�-ERIVIIT EXPIRES Monday, 13 I IssuedPermit on Wednesday, June 16,2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. to �,, 41 . Owner or agent: l -- , Date: rSs.; 1 1I 111 i 1 I EMMIT #: 2110151700 Address: 2502 S 317TH ST Bldg52 Project: CHELSEA COURT CONDOMINIUM Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are togged on the back of this card. El Initial Erosion Control (4365) 2 Footings/Setback (4110) Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete y Date By Date By Date F±1 Drain age/D own spout (4040) I' 1Re-steel (215) Slab/Concrete Floor (4255) Approved to backfill Approved to place concrete or grout Approved to place concrete y Date By Date By Date LE Underfloor Framing (425) El Floor Sheathing (4105) 9 Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding y _ Date By Date By Date tt Roof Sheathing (4220) Ell Fire/Draft Stops (095) Interim Erosion Control (4370) Approved to install roofing Approved Approved y Date By Date By Date Prior to scheduling a Framing inspection 1 Framing (4120) 44 Insulation (4150) Electrical, Plumbing & Mechanical Rough-'n Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By ate By Date Gypsum Wallboard Nailing (4130) Ita Suspended Ceiling Grid (4265) t7 Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date 18 Final - Planning l Final Erosion Control (4375) Final - Building (4050) Approved Approved Approved y Date By Date By Date _'Fwwo Mafro-ved Rough Electrical El Final Electrical Right of Way Approved Approved Approved y Date By Date By Date