21-101517 - PERMIT FINAL(i 1
City of Federal way Permit • -
Community Development Dept.. •
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHELSEA COURT CONDOMINIUMS
Project Address: 2502 S 317TH ST Parcel Number: 154180 0000
Project Description: BLUEBEA - Like -in -kind repair to fire -damaged roof and wall framing. Includes plumbing
and mechanical.
Owner Applicant Contractor Lender
CHELSEA COURT MICHAEL S1 R CONSTRUCTION
CONDOMINIUMS ASSOCIATION BRAMHALLDEGENKOLB 14751 N KELSEY ST SUITE 561
2503 S 317TH ST ENGINEERS MONROE WA 98272
FEDERAL WAY WA 98003 600 UNIVERSITY ST W SUITE 720
SEATTLE WA 98101
Includes: # 1 #2 #3 #4
OCCU arlcy Class: R-2
Construction Type-, Type V - B
Occupancy Load:
Floor Area (sq. ft.)
•• . ' [i it • u. �r,
Occupancy #1 - Construction Type....._., .... ____ Type V - B Mechanical to be Included? ................... . ,.....:...,., No
Plumbing Work Valuation?....... .............................. 10000 Mechanical Work Valuation?................................. 6000
Number of Stories. ..,...... 2 Is this an Online or O.T.C. application? .................. No
Permit for Building Shell Only? ....... ............... ........ No Plumbing to be Included?........................................ No
Occupancy 41 -Use ................................................ Apartment House Comprehensive Plan Designation ........, City Center Frame
Zoning Designation ..,.,,.... CC-F
Total Valuation: 500,000.00
Mechanical Fixtures
Fans 24 Fireplace Inserts 6 Hot Water Tanks 10'
Plumbing Fixtures
Bathtubs 7 Dishwashers 7 Lavatories I
Water Closets 7
CONDITIONS:
uired for fire sprinkler system.
December,'�-ERIVIIT EXPIRES Monday, 13 I
IssuedPermit on Wednesday, June 16,2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
to �,, 41 .
Owner or agent: l -- , Date:
rSs.;
1 1I 111
i 1 I
EMMIT #: 2110151700
Address:
2502 S 317TH ST Bldg52
Project: CHELSEA COURT CONDOMINIUM
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule
inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the
inspection
sequence. On -going inspections
are togged on
the back of this card.
El Initial Erosion Control (4365)
2
Footings/Setback (4110)
Foundation Wall (4115)
To be done PRIOR to breaking ground
Approved to place concrete
Approved to place concrete
y Date
By
Date
By
Date
F±1 Drain age/D own spout (4040)
I' 1Re-steel
(215)
Slab/Concrete Floor (4255)
Approved to backfill
Approved to place concrete or grout
Approved to place concrete
y Date
By
Date
By
Date
LE Underfloor Framing (425)
El
Floor Sheathing (4105)
9
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
y _ Date
By
Date
By
Date
tt Roof Sheathing (4220)
Ell
Fire/Draft Stops (095)
Interim Erosion Control (4370)
Approved to install roofing
Approved
Approved
y Date
By
Date
By
Date
Prior to scheduling a Framing inspection
1
Framing (4120)
44
Insulation (4150)
Electrical, Plumbing & Mechanical Rough-'n
Approved to insulate
Approved to install wallboard
and Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4
By
ate
By
Date
Gypsum Wallboard Nailing (4130)
Ita
Suspended Ceiling Grid (4265) t7
Final - S K F & R (4060)
Approved to install mud & tape
Approved to drop tile
Approved
By Date
By
Date
By
Date
18 Final - Planning
l
Final Erosion Control (4375)
Final - Building (4050)
Approved
Approved
Approved
y Date
By
Date
By
Date
_'Fwwo Mafro-ved
Rough Electrical
El
Final Electrical
Right of Way
Approved
Approved
Approved
y
Date
By
Date
By
Date