Loading...
21-103148-SITE PLAN< -7Q O w Q p W cn O ry LL o � W z > W w z LU O V) z z W O 3 Q � U O z z 3 lmi V 3 n W � w m � o 0 N W _ F- w O N Q Q O m z o O W R- �_J J 02 m O CL zLIJ m W 1-291:8 5 IS j P r4 33310 1st WAY S FEDERAL WAY.. WA 98003 III III COMPACTED FILL OR SOIL COMPACTED BACKFILL cco DRAINAGE FILL CONCRETE BRICK GYPSUM WALL BOARD / CEMENT BOARD 14,511 SQ. FT. MATERIALS LEGEND PLYWOOD TILE STEEL STUD PARTITION CONCRETE MASONRY UNIT - ELEVATION 1 BATT OR LOOSE FILL INSULATION STEEL •0by, •N0. FINISH WOOD WOOD BLOCKING GLASS SIGNATURE GSI PROJECT MANAGER DATE: GSI REVIEW IS ONLY FOR GENERAL CONFORMANCE WITH GSI PROTOTYPE DRAWING AND SPECIFICATIONS. OWNER, DEVELOPER AND/OR CONTRACTOR IS RESPONSIBLE FOR ASSURING THAT THE BUILDING MEETS ALL STATE AND LOCAL ORDINANCES, REGULATIONS, CODES, AND CHILD CARE LICENSING REQUIREMENTS IN EFFECT AT THE TIME OF CONSTRUCTION. ANY DEVIATION FROM THE GSI PROTOTYPE DRAWING AND SPECIFICATIONS MUST BE APPROVED BY THE GSI PM. SYMBOLS LEGEND SHEET NUMBERING SYSTEM DOOR 15/A9.01 ROOM INTERIOR WALL SCHEDULE UPPER ROOM PARTITION / WALL U NAME CONSTRUCTION F101FURNITURE / FINISH No ROOM NUMBER ROOM NAME INSULATION N HARDWARE SET ROOM INDICATION E101 EQUIPMENT/ PLUMBING 101 NAME ROOM NUMBER A 1 a 00 A 1 101 ROOM SQ FT PARTITION / WALL L101LIGHTING /CEILING U DOOR TYPE 200 SF CONFIGURATION p OCCUPANCY KEYNOTE EXTERIOR WINDOW REVISION Q WALL A9.01 20/A9.01 ROOM SQ FT OROOM OCCUPANT LOAD O91 , 1,„ O ROOM OCCUPANT TYPE A �J� O Q OCCUPANT LOAD FACTOR ms� REVISION NUMBER / Q NUMBER OF EXITS REQ'D REVISION CLOUD Q Lu ELEVATION SECTION TITLE LINE CORNER GAURD o p DRAWING NUMBER "' DRAWING NAME N NqY DETAIL NUMBER SECTION NUMBER CG 00 SHEET NUMBER 1 N01 (]) PLA 04 A3.0 1 /8" = 1'-0" z SHEET NUMBER LU m Q DRAWING SCALE Q M WALL SECTION DETAIL DETAIL GRADE ELEVATION FINISH FLOOR ELEVATION > � NUMBER GRADE ELEVATION SECTION NUMBER SHEET NEW OR FINISH O W 1 X WORK, CONTROL p O 1 A8.0 NUMBER �0�� GRADE OR DATUM POINT A4.0 t 1 O EXISTING GRADE 0 SHEET NUMBER 1ST FLR ROOM SF ROOM OCC 1000 200 EXITS OLF OCC TYPE 2 20 A-2 20 BOXES: O O O O O O O O O G 11 12 13 I 14 15 ----I -- I 16 - --- 17 _ I 18 _ 19 F i 20 - GRID LINES LETTERS A HORIZONTAL NUMBERS VERTICAL NORTH ARROW GENERAL MECHANICAL /ELECTRICAL &PLUMBING l . The Contractor shall be responsible for safety in the area of work at all 1. DESIGN BUILD. times in accordance with all applicable safety codes. 2. Comply with 603.5.E Protection from Irrigation Systems. 2. The Contractor shall indemnify and hold the Owner/Architect/Engineer 2.1. Potable water supplies to systems having no pumps or connection for harmless for injury or death to persons or for damage to property caused pumping equipment, and no chemical injection or provisions for by the negligence of the Contractor, his agents, employees, or chemical injection, shall be protected from backflow by one of the subcontractors. following: (1) Atmospheric vacuum breaker, (2) Pressure vacuum 3. Each Contractor shall be responsible for damage to adjacent work and breaker backflow prevention assembly (PVB), (3) Spill -resistant pressure shall repair said damage at his own expense. Contractor to obtain all vacuum breaker (SVB), (4) Reduced pressure principle backflow required permits and approvals for damage reparations for such work. prevention assembly (RP), (5) A double check valve backflow 4. HVAC, Mechanical, Electrical, Plumbing, Fire Sprinklers and Vertical prevention assembly (DC) may be allowed when approved by the Transportation are Design Build under separate permit. water purveyor and the authority having jurisdiction. 5. CODES: All work shall conform to the applicable Building Codes and 3. Comply with 603.5.7 Outlets with Hoses Attachments. Ordinances. In case of any conflict where the methods or standards of 3.1. Potable water outlets with hose attachments, other than water heater installation of the materials specified do not equal or exceed the drains, boiler drains, and clothes washer connections, shall be requirements of the laws or ordinances, the laws or ordinances shall protected by a non removable hose bibb-type backflow preventer, a govern. Notify the Architect of all conflicts. non removable hose bibb-type vacuum breaker, or by an 6. DRAWINGS AND SPECIFICATIONS: Structural, Mechanical and Electrical atmospheric vacuum breaker installed not less than 6 inches above Drawings are supplementary to these drawings. The Contractor shall the highest point of usage located on the discharge side of the last notify the Architect of all discrepancies between the Consultant's valve. In climates where freezing temperatures occur, a listed drawings with a written request for clarification. Any work installed in self -draining frost -proof hose bibb with an integral backflow preventer conflict with these Drawings or Specifications shall be corrected by the or vacuum breaker shall be used. Contractor at no expense to the Owner or Architect. 4. Comply with 603.5.17 Potable Water Outlets and Valves. 7. All items marked "N.I.C." are not part of this contract. 4.1. Potable water outlets, freeze -proof yard hydrants, combination 8. All work shall be applied in accordance with the manufacturer's latest stop -and -waste valves, or other fixtures that incorporate a stop and recommendations or written directions. waste feature that drains into the ground shall not be installed 9. Where construction details are not shown or noted for any part of the underground. work, the details shall be the same as for other similar work. DIMENSIONS 10. Where devices or items or parts thereof are referred to in singular, it is intended that such shall apply to as many such devices, items or parts as 1. All information shown on the drawings relative to existing conditions are are required to properly complete the work. given as the best present knowledge but without guarantee of accuracy. 11. Contractor shall verify all "building standards" with building landlord prior The Contractor shall field verity existing conditions and dimensions and to beginning any work. However, there shall be no deviations shall notify the Architect of any discrepancies or conditions adversely whatsoever from the contract documents without the architect's written affecting the Architect of any discrepancies or conditions adversely approval thereof. The contractor agrees to defend, indemnify, and hold affecting the design prior to preceding with the work. the architect harmless from any claims arising as a result of unapproved 2. Exterior dimensions of plans are to the building gridlines or face of exterior changes. sheathing unless otherwise noted. Interior dimensions of plans are to 12. Contractor shall request verification from utility companies of building gridlines or face of finish unless noted otherwise. underground utility locations prior to beginning excavations. 3. Do not scale drawings: The Contractor shall use dimensions shown on the 13. The contractor will verify and conform to all requirements of all utility Drawings and actual field measurements. Notify the Architect if companies unless otherwise noted in the plans and specifications. discrepancies are found. 14. All debris shall be removed from premises and all areas shall be left in a 4. COORDINATION: The General Contractor shall be responsible for the clean (broom) condition at all times. verification and coordination of the work of all trades to assure 15. Owner shall provide building permit to the contractor prior to compliance with the Drawings and Specifications. commencement of work. 5. Contractor is to verify all existing conditions, dimensions, details, etc., and 16. Contractor shall secure relevant city and state approvals relating to fire, notify the architect of any and all discrepancies prior to proceeding with construction, labor, health and licensing. Contractor shall further post all the work. bonds and secure all insurance required by law or contract, forwarding b. Existing elevations and locations to be joined shall be verified by the proof of such actions to the owner prior to commencement of contractor before construction. If they differ from those shown on the construction. drawings, the contractor shall notify the architect so that modifications 17. Contractor shall secure and provide all permits for occupancy, utilities can be made before proceeding with the work. and any others required by governing authorities beyond the basic 7. The contractor shall verify all door and window rough opening dimensions building permit, making timely applications and inquiries, paying all fees with door and window manufacturers. and posting all bonds to be released at the completion of construction. 18. Approved plans shall be kept in a plan box and shall not be used by any FIRE PROTECTION workmen. All construction sets shall reflect the same information as well 1. DESIGN BUILD. as all revisions, addenda, and change orders. The contractor shall also 2. Comply with 603.5.14 Protection from Fire Systems. maintain in good condition, one complete set of plans with all revisions, 2.1. Except as provided under Sections 603.5.14.1 and 603.5.14.2, potable addenda, and change orders, on the premises at all times which are to water supplies to fire protection systems that are normally under pressure be under the care of the job superintendent. including but not limited to standpipes and automatic sprinkler systems, 19. The contractor shall be responsible for the complete security of the except in one or two family or townhouse residential flow -through or buildings and site while job is in progress and until the job is completed. combination sprinkler systems piped in materials approved for potable 20. All work shall be guaranteed for a period of one (1) year after water distribution systems, shall be protected from back -pressure and completion, unless otherwise specified, and shall be so stated in back-siphonage by one of the following testable assemblies: (1) Double contractor's written proposal and agreement. All repairs, corrections, check valve backflow prevention assembly (DC) (2) Double check discrepancies, etc., must be made without any additional cost to the detector fire protection backflow prevention assembly (3) Reduced owner, and within 24 hours after notice is given. pressure principle backflow prevention assembly (RP) (4) Reduced 21. All operations during construction conducted on the premises shall not pressure detector fire protection backflow prevention assembly. be objectionable beyond the property boundary lines by reason of noise, steam, odor, fumes, gases, smoke, vibration, hazard or other CONSTRUCTION 22. causes. Exit doors shall be openable from the inside without the use of a key or 1. Contractor shall be responsible for providing wall blocking for all wall and any special knowledge or effort. ceiling mounted items. 23. Flammable liquids shall not be places, stored, or dispensed in this 2. There shall be no exposed pipe, conduits, ducts, vents, etc. and such lines occupancy except as provided in N.F.P.A. standard 30 and the current shall be concealed or furred and finished, unless noted as exposed on the International fire code. Permit may be required. construction drawings. 3. Offset studs where required so that finish wall surfaces will be flush. 24. The contractor shall provide as -built modifications to architectural, 4. Provide galvanic isolation between dissimilar metals. structural mechanical electrical fire and smoke monitoring detection 5. General Contractor is to coordinate with mechanical, electrical and systems on reproducible's. Such as -built drawings will be completed, plumbing contractors for all required rough -ins, and trenching required for submitted, and approved by the owner prior to the final payment. electrical and plumbing runs. 25. An approved public safety key box shall be installed adjacent to the b. Provide pressure treated wood at all locations where wood is exposed to main entrance and shall be clearly visible and mounted within ten feet the exterior or where wood comes into contact with concrete or soil. of the ground. The key box shall contain keys to open doors or other 7. Lathing, plaster, and gypsum wallboard systems shall conform to the IBC access means at the following locations: Confirm location w/ Fire current edition. Marshall. 25.a. The main entrance. 8. All exposed gypsum board to have metal edges at all corners and wall 25.b. Rooms containing fire alarm system control panels. intersections. 9. All glass and glazing shall comply with IBC current edition and the U.S. 25.c. Rooms containing main electrical service panels. product safety commission: Safety standard for architectural glazing 25.d. All keys shall be clearly marked as what door, room, area, or lock materials. required. they serve. 26. The address shall be prominently displayed per City requirements. FINISHES 27. The contractor shall ensure that this project, and all construction activities related thereto, conform with all local, regional, state, and/or federal 1. All paint and wall coverings shall be applied in accordance with the regulations pertaining to disturbing, displacing, and/or removal of manufacturer's recommendations. asbestos or asbestos containing materials. Note specifically, that the 2. Prepare floor per manufacturer's recommendations to provide level area contractor shall conform with the requirements of the Puget Sound Clean for flooring installation and level flooring transitions. Air Agency regarding, inspection, certification, and notification. 3. All drapes, hangings, curtains, drops, and all other decorative material, 28. Since the building is a chan­ir�,use�.,c�mply with the Prescriptive including Christmas trees that would tend to increase the fire and panic Compliance Method per4the IEBC 2018. Thy facility for accessibility route hazard shall be made from non-flammable material, or shall be treated shall comply with the current IEBC 2018 code. and maintained in a fire retardant condition by means of a flame �"�` ` � retardant solution or process approved by the fire marshal. Provide a CEILING certification to this effect. 1. Ceiling heights, where indicated, are from finished floor to bottom of 3.a. Exit door, exit lights, and fire extinguisher locations shall not be ceiling finish surface. concealed or obstructed by any decorative material. 3.b. Minimum flame spread classification of interior finishes shall be per IBC current edition. VICINITY MAP SITE: 33310 1st WAY S, AREA OF WORK S 333RD STREET n, t4 INDICATES AREA 1 SITE PLAN OF WORK NOT TO SCALE INDEX OF DRAWINGS GENERAL INFORMATION AND ZONING CODE T1.1 COVER SHEET Gl .1 FIRST FLOOR CODE STUDY GI.2 SECOND FLOOR CODE STUDY Gl .3 GENERAL ACCESSIBILITY Gl .4 GENERAL ACCESSIBILITY Gl .5 GENERAL ACCESSIBILITY Gl .6 GENERAL ACCESSIBILITY CIVIL Cl .1 OVERALL SITE PLAN Cl .lA ENLARGED SITE PLAN Cl .2 SITE PLAN C2.1 GRADING PLAN C3.1 UTILITY PLAN C5.1 SITE DETAILS C5.2 SITE DETAILS LANDSCAPE L-1 LANDSCAPE PLAN L-2 PLANT SCHEDULE, LANDSCAPE NOTES &DETAILS ARCHITECTURAL AD1.1 DEMO FIRST FLOOR PLAN AD1.2 DEMO SECOND FLOOR PLAN A1.1 a FIRST FLOOR PLAN GENERAL NOTES A1.1 b FIRST FLOOR PLAN W/ DIMENSIONS A1.2a SECOND FLOOR PLAN GENERAL NOTES A1.2b SECOND FLOOR PLAN W/ DIMENSIONS A1.3 ENLARGED FLOOR PLANS &INTERIOR ELEVATIONS A1.4 ENLARGED FLOOR PLANS &INTERIOR ELEVATIONS A1.5 ENLARGED FLOOR PLANS &INTERIOR ELEVATIONS A2.1 EXTERIOR ELEVATIONS &BUILDING SECTION A3.3 FIRST FLOOR WALL TYPES A3.4 SECOND FLOOR WALL TYPES A4.1 INTERIOR DETAILS Ab.l FIRST FLOOR REFLECTED CEILING PLAN A6.2 SECOND FLOOR REFLECTED CEILING PLAN A7.1 DOOR &WINDOW SCHEDULE A7.2 DOOR &WINDOW DETAILS A8.1 FIRST FLOOR ROOM &FLOOR FINISH PLAN A8.2 SECOND FLOOR ROOM &FLOOR FINISH PLAN A10.1 FIRST FLOOR BUILDING DATA PLAN A10.2 SECOND FLOOR BUILDING DATA PLAN ELECTRICAL E1.1 FIRST FLOOR POWER PLAN E1.2 SECOND FLOOR POWER PLAN DOCUMENTS FOR SEPARATE PERMIT SHOULD BE REVIEWED FOR GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. SUBMIT DIRECTLY TO THE LOCAL JURISDICTION. FEDERAL WAY GODDARD SCHOOL 33310 1ST WAY S FEDERAL WAY, WA 98003 TWIST SIGN INC 4444 WOODLAND PARK AVE N., SUITE 100 SEATTLE, WA 98103 (206) 402 4484 PROJECT GODDARD SCHOOL 33310 1ST WAY S FEDERAL WAY, WA 98003 DESIGN TEAM 1 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT City of Cdet°I way GENERAL PER CITY REQUIREMENTS: DATE: NOVEMBER 20, 2020 MECHANICAL PERMIT DESIGN BUILD/DEFERRED SUBMITTAL ELECTRICAL PERMIT (L&I DESIGN BUILD/DEFERRED SUBMITTAL PROJECT NO: 20395.02 MANAGER: KIRK CALLISON PLUMBING PERMIT DESIGN BUILD/DEFERRED SUBMITTAL FIRE ALARM DESIGN BUILD/DEFERRED SUBMITTAL FIRE SPRINKLER DESIGN BUILD/DEFERRED SUBMITTAL DRAWN: OEN PLAY STRUCTURES DESIGN BUILD/DEFERRED SUBMITTAL SIGNAGE DESIGN BUILD/DEFERRED SUBMITTAL CHECKED: KDC STATE FIRE MARSHAL'S OFFICE DESIGN BUILD/DEFERRED SUBMITTAL STATE DEPARTMENT OF HEALTH DESIGN BUILD/DEFERRED SUBMITTAL REVISION NO. DATE ISSUE PROJECT DESCRIPTION 04/27/21 LAND USE / PROCESS I/ CHANGE OF USE PERMIT The proposed project consist of remodeling an existing 1975 2-story masonry office building, into a 2-story Goddard School with exterior playgrounds. The site is 1 06/17/21 LAND USE / PROCESS I / approximately 65,000 sf (1.49 acres) with a gross building size of approximately 14,511 sf CHANGE OF USE REVISIONS on 2 levels with 70 parking stalls and associated landscaping. The project will be designed to the Goddard School requirements and meet all local and state code 07/26/21 BUILDING PERMIT requirements. 1 09/16/21 PERMIT REVISION 1 PROJECT DIRECTORY OWNER ANUJ MITTAL (425) 208-6647 STAMP ANUJ MITTAL MITTALANUJOI @GMAIL.COM ARCHITECT TWIST DESIGN, INC 4444 WOODLAND PARK AVE N, SUITE 100 691$ REGISTERED SEATTLE, WA 98103 RCHITECT (206) 402-4484 KIRK CALLISON KIRKC@TWIST-DESIGN.COM CONTRACTOR ACG, INC. STATE OF WASH NGTON 1900 AIRPORT WAY SOUTH, SUITE 102 SEATTLE, WA 98134 (206) 329-2878 CHAD QUILICI CHAD@ACGBUILDS.COM DPD DEDICATED APPROVAL STAMP SPACE STRUCTURAL/CIVIL LANDSCAPE BARGHAUSEN ENGINEERS 18215 72ND AVE S KENT, WA 98032 (425)251-6222 JASON CAREY JCAREY@BARGHAUSEN.COM LEGAL DESCRIPTION PROJECT ADDRESS: 33310 1st WAYS TITLE FEDERAL WAY, WA 98003 C O V E RS H E ET LEGAL DESCRIPTION: WEST CAMPUS OFFICE PARK DIV 1 LOT 25 B OF KC SHORT PLAT NO 475011 RECORDING NO 750609381 TAX PARCEL NUMBER: 9266500-0255TI SHEET NUMBER *1