Loading...
99-104642 (2) r i CITY OF • EIDESZFIL (253)661-4000 ' 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210 January 27, 2000 „rpm r Mr. Donald Perry Lakehaven Utility District id 61 Lao PO Box 4249 Federal Way, WA 98063-4249 Re: 27TH AVENUE SANITARY SEWER PUMP STATION PROJECT-File#PRE99-0087 Vicinity of SW 35Vt Place between 26th and 27th Avenues SW Dear Mr. Perry: This letter summarizes the preapplication conference held on December 30, 1999, at which time members of the city's Community Development Review Committee(CDRC)discussed the general requirements that will apply to the above referenced project. Those requirements are summarized below and are included as enclosures with this letter. Project Description: Installation of approximately 350 feet of 8-inch gravity sewer line, 600 feet of force main, and a pump station in an utility easement located between 27th Avenue SW and 26th Avenue SW south of SW 351 st Place. Development of the site is subject to the RS7.2 and RM1800 zoning and the "Federal Way City Code"(FWCC). Staff has reviewed the proposal under the FWCC and identified the following key issues. PLANNING DIVISION, Marion Hess (253-661-4120) A. Required Land Use Review Processes and Fees (1) Site Plan Review: The proposal is permitted under the FWCC subject to site plan review. The project is also subject to environmental review under the State Environmental Policy Act(SEPA). The project will require a Process III-Project Approval review, because environmental review is required. The Director of Community Development Services issues the Process III project decision, which can be appealed to the Hearing Examiner. S Mr. Donald Perry Page 2 January 27, 2000 Pursuant to the FWCC, the Process III application shall include a site plan, site survey, and preliminary landscape plan prepared in accordance with the enclosed Development Application Submittal Requirements. (2) State Environmental Policy Act(SEPA): The SEPA threshold determination and appeal period must be completed before issuance of the Process III project decision. In this case,Lakehaven Utility District is the Lead Agency and can render an environmental determination, or Lakehaven may defer the determination to the city's Director of Community Development Services, which determination can be appealed to the Hearing Examiner. (3) Outside Permits: The applicant is responsible to identify and obtain all required state, federal, or outside agency permits, as the project may require. (4) Land Use Application Fees Are As Follows: Process III Project Approval: $1,554.00 SEPA Checklist: $550.00 The above fees include basic review of the land use applications by the Planning Division. Additional Public Works fees may be charged as necessary (see Public Works comments, enclosed). Building permit fees are processed and charged separately from land use applications. (5) Permitted Uses: The proposed pump station and sewer lines have been determined compatible with the existing principal and accessory uses of the site, as provided by the FWCC. Utility lines, fencing, generator, and pump stations will be reviewed under applicable code regulations and development standards. (6) Landscaping: Pursuant to the FWCC,the application must include a preliminary landscape plan for restoring disturbed areas and methods to maintain the landscaping. (7) Land Surface Modifications: An approved grading plan prepared in accordance with the city's adopted engineering standards will govern all clearing, grading, and filling activities associated with the project. PUBLIC WORKS DEPARTMENT, Ann Dower(253-661-4125) See enclosed comments. (Note: The Traffic Division has no comments on the proposal.) BUILDING DIVISION,Joan Hermle(253-661-4152) The Building Division has no comments on the proposal. Mr. Donald Perry Page 3 January 27, 2000 FEDERAL WAY FIRE DEPARTMENT, Greg Brozek(253-946-7241) See enclosed comments. As you know, preapplication comments are based on a preliminary review only and should not be construed to represent final comments on the project. As the project is redesigned, or as more detailed site plan and environmental information is prepared, additional issues or concerns may be identified which were not covered at the meeting. We hope you found the preapplication process useful in identifying key requirements as they relate to the proposal and preparation of formal application. If you have any questions, please contact me at 253-661-4120, or other staff person as appropriate. Sincerely, Ael g14": rvit Marion Hess Senior Planner enc: Development Application Submittal Requirements Memorandum from Ann Dower,Public Works Memorandum from Greg Brozek,Fire Department Sign-up Sheet c: Ann Dower,Engineering Plans Examiner Greg Brozek,Federal Way Fire Department L:\CSDC\DOC S\S A V E\49707012.DOC • CITY OF G • (253)661-4000 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210 May 17, 2000 Mr. Kenneth R. Canfield,P.E. Project Manager Lakehaven Utility District PO Box 4249 F % Le Federal Way, WA 98063 Dear Mr. Canfield: Re: 27th Avenue SW Sanitary Sewer Pump Station #45 Administrative Inquiry Number 00-102875 The following is in response to your May 12, 2000,request to immediately install a short section of eight-inch sewer pipeline under the developed portion of the 35100 block of 27th Avenue SW. The proposed sewer pipeline is depicted on a drawing you provided(received May 16, 2000). The sewer pipeline is generally proposed to be constructed within the developed road prism of 27th Avenue SW,based on two potential alignment options. The purpose of immediately installing this portion of a larger sewer pipeline and pump station project is to avoid open cutting the city's planned overlay of 27`h Avenue SW. A larger sewer pipeline and pump station project was reviewed with you on December 30, 1999, at a city preapplication conference. As we discussed, environmental review is not required for installation of sewer piping eight inches or less in diameter. However,pump stations are not listed as exempt actions and as indicated by the district will require environmental compliance. At that preapplication conference, it was confirmed that the district would be completing environmental compliance on the pump station portion of the proposed project. In addition, city staff indicated that the overall project is considered a public utility and will require Process III land use review before beginning construction. Based on this background information,the following addresses your questions regarding immediate installation of this proposed section of pipeline. First,the city would not consider the installation of only eight-inch sewer piping within the constructed roadway to require environmental compliance. Second,the city would not consider coordinating the installation of this short section of sewer piping with the city's planned 27th Avenue SW overlay to be considered a public utility requiring Process III review. This type of coordination is typical and a prudent coordination of public agency resources to avoid duplication of efforts or disturbance of newly overlayed roadway areas. r Mr. Kenneth R. Canfield, P.E. Page 2 May 17, 2000 Therefore, no further environmental or land use review will be required by the city for the proposed installation of sewer piping as depicted on the drawing received May 16, 2000. Please be advised that you may be required to obtain a city right-of-way permit before beginning construction. Questions regarding right-of-way permits can be directed to Kathy Messinger, Streets Engineering Technician, at 253-661-4127. The preferred alignment alternative should be discussed with y Messinger in conjunction with the right-of-way permit process. If I can be of an iSe,please call me at 253-661-4108. F Sincerely, ii4(fr - Greg Fewins Principal Planner c: Marwan Salloum,Federal Way Street Systems Manager Kathleen Messinger,Federal Way Streets Engineering Technician L:\CSDC\DOCS\SAVE\48255356.DOCILast printed May 17,2000 9:15 AM x` LAKEHAVEN UTILITY DISTRICT ;ketiaygn 31627-1st Avenue South • P.O.Box 4249 • Federal Way,Washington 98063 UTILITY DISTI/C� Federal Way:253-941-1516 • Tacoma:253-927-2922 • Fax:253-839-9310 May 12, 2000 Mr. Greg Fewins, Principal Planner Community Development Services City of Federal Way 33530 1d Way South : ustr Federal Way,Washington 98003-6221l^CIVE D ��p�RT Cnwe rnirry n 20013 Re: 27th Avenue S.W. Sanitary Sewer Pump Station#45 Project No. LUD98501400 Dear Mr. Fewins: The City of Federal Way Public Works Department has awarded their annual pavement overlay contract and are scheduled to start the project this week. When I spoke to John Mulkey, Project Manager for the City last week, he indicated that the City's contractor is slated to start Schedules A, B, and C of the overlay program the week of May 15. The 27th Avenue SW overlay is part of Schedule H. As you know, the Lakehaven Utility District is proposing to install a new pump station and related appurtenances next year located near the southerly end of 27th Avenue SW near 351st Place SW. The sewer system will consist of approximately 350 feet of 8-inch sewer line, 600 feet of 6-inch force main, and a pump station. With the exception of about 150 feet of the sewer line and 40 feet of the force main, the entire project will be located within easements that the District is in the process of acquiring. On December 30, 1999, a preapplication conference (City File No. PRE99-0087) was held at the City of Federal Way to review the proposed project. An Environmental Checklist is now being prepared for the project by the District and is scheduled to be circulated next month to all of the required agencies for review and comments. The District is also in the process of preparing a Land Use Application for submittal to the City next month. The District would like to install that portion of the 8-inch gravity sewer line in 27th Avenue SW that is scheduled to be overlaid. The length of the line is approximately 150 feet including manholes. Enclosed for your information, is a half-scale plan that shows the location the 8-inch pipeline. Two alternatives are being considered. Alternative 1 includes approximately 150 feet of 8-inch pipe and one manhole connecting to the existing sewer manhole at the intersection of 27th Avenue SW and 351d Place SW. Alternative 2 consists of approximately 80 feet of 8-inch pipe and two manholes located south of the 27th Avenue SW and 351d Place SW intersection. Tom Jovanovich Dick Mayer Donald L.P.Miller Ed Stewart Beverly J.Tweddle Commissioner Commissioner Commissioner Commissioner Commissioner Mr. Greg Fewins May 12, 2000 Page 2 We would like City approval to install the 8 inch sewer line before the 27th Avenue Street is overlaid. Your earliest possible response would be greatly appreciated. Should you have any questions, or require additional information,please call me(253)584-5894. Sincerely, I � > Kenneth R. Canfiel•,P.E. Project Manager KRC:kc Enclosure Cc: Don Perry,P.E.,District Manager File interoffice MEMORANDUM Federal Way Dep't of Public Works Development Services Division To: Marion B. Hess, Senior Planner From: Ann Dower, Engineering Plans Reviewer 6131— Subject: 27th Avenue SW Pump Station&Sewer Lines, PRE99-0087 South of SW 351'Place between 26th and 27th Avenues SW Date: 1/11/00 After visiting the site and reviewing the site plan, the Public Works Division has determined that the following items need to be addressed as conditions of the proposed development: 1. A right-of-way permit will be required for work within the public right-of-way. 2. The applicant will need to provide further information on the size and use of any new impervious area that will be created with this project. Drainage review,treatment,and/or detention may be required for this project depending on this information. Standards set forth in the 1998 King County Surface Water Design Manual and the Federal Way Addendum to the KCSWDM will apply. At a minimum,the applicant will need to provide a T.E.S.C. (erosion control)plan for the entire length of the project. (FILENAME\p} LAILHAVEN UTILITY DISTRICT 31627 1st Avenue South ♦ P. O. Box 4249 • Federal Way,WA 98063 COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: December 30, 1999 ATTN: Mr. Marion Hess Senior Planner SUBJECT: Agenda Item No. 1 - 27th Ave SW Sanitary Sewer Pump Station PRE99-0087 COMMENTS: The District abstains from comment on this issue. By: • Date: /Z 30 q7 Mary . Yo g Devel pment Services upervisor Direct Line: (253) 946-5400 FAX: (253) 529-4081 E-mail: myoung@lakehaven.org 11, I, wit tsCz FEDERAL WAY FIRE DEPARTMENT E _ S 31617 1st Avenue South PN Federal Way, Washington 98003-5201 tIRE D Y1 1949TO1999 December 30, 1999 To: Community Development Review Committee RE: 27th Ave SW Sewer Pump Sta. /Sewer Lines/PRE99-0087/Hess A separate Uniform Fire Code Permit is required from the Fire Department for the installation of the fuel supply for the emergency generator. If you require additional information from the Fire Department, please call 253-946-7318 . Sincerely, Greg Brozek Fire Marshal ' s Office Phone: (253) 839-6234 or (253) 927-3118 • E-mail: info@federalwayfire.org • Fax: (253) 529-7206 An Equal Opportunity Employer SIGN UP SHEET LAKEHAVEN 27TH AVENUE SW SANITARY SEWER PUMP STATION & SEWER LINES South of SW 3519' Place, Between 26th and 27`h Avenues SW PRE-APPLICATION MEETING PRE99-0087 December 30, 1999 9:00 a.m. Name Project Affiliation Telephone # l' iltivwx‘, 6‘-) CA C,ufLeircik U1/41u-k zs3-60-4izo --62(41 ae C tip Pie Goi )17 I IY9 IF?"id Ls.,5 PARY Yo(14 4 L4KEHA✓tnl UTa rrY Dl57XZi6_T Z53-9 -5*00 at41- DM/el- `M"l Fed c.4 P eu. LJ0,14.1. zs-3 e�.rp� ;•#fir ^,_er♦ .,. 6Ifk.) *ya L 'S` 4.4a( " 4%4_4) CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT MEMORANDUM DATE: December 6, 1999 TO: Community Development Review Committee (CDRC) Members Public Works Development Services - Traffic Engineering Public Works Development Services - Development Review Lee Bailey, Lead Plans Examiner Mary Young, Supervisor of Technical Services, Lakehaven Utility District Greg Brozek, Federal Way Fire District FROM: Marion B. Hess, Senior Planner MEETING DATES: Internal meeting 12/23; meeting with applicant 12/30. *************************************************************************************** FILE NUMBER: PRE99-0087 PROJECT NAME: 27`' Avenue SW Sanitary Sewer Pump Station & Sewer Lines PROJECT ADDRESS: South of SW 351St Place between 26th and 27th Avenues SW PROJECT DESCRIPTION: Lakehaven Utility District proposes to construct approximately 350 feet of 8 inch gravity sewer line, 600 feet of force main, and a pump station in an utility easement located between 27th Avenue SW and 261h Avenue SW south of SW 3519`Place. Zoning is RS7.2 and RM1800. PROJECT CONTACT: Donald Perry, @ 253-941-1516 (applicant) Kenneth Canfield, Project Engineer, @ 253-584-5894 (Agent) Attachments: MLU Application (3 pages) Zoning Map Site Plan (3 sheets) i:990087dr.mmo CITY OF •- (253)661-4000 FW 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210 December 7, 1999 Mr. Donald Perry a �y Lakehaven Utility District PO Box 4249 Federal Way, WA 98063-4249 Rw: 27TH AVENUE SANITARY SEWER PUMP STATION PROJECT—Preapplication Meeting South of SW 351"Place between 26th and 27th Avenues SW—File NQ PRE99-0087 Dear Mr. Perry: The above referenced proposal was filed December 6, 1999, and has been assigned to me as project planner. At this time,the submittal packet has been routed to members of the Development Review Committee. A meeting with project proponents has been scheduled as follows: December 30, 1999 at 9:00 a.m. City Hall Department of Community Development Services 33530 First Way South Federal Way,WA 98003 We look forward to meeting with you, or your representative, at that time. Please call me as soon as possible at(253) 661-4120 if you have any questions, or are not able to attend the meeting. Sincerely, e 46,0. Marion B. Hess Senior Planner c: Kenneth R.Canfield, 10802 Williams Way SW,Lakewood,WA 98498 L:'PRMSYS\DOCUMENT\PRE99 00.87\SCHEDULE.DOC F 2 F.r IVE I _ 11 TER LAND USE APPLICATION I)F c 0 1 t 999 DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES .. AY 33530 First Way South,Federal Way,WA 98003 Gi fY Or FEIJ riAL WAY • (253)6614000—Fax(253)661-4129 -BIALLDING- APPLICATION No 1E'1'1 008 7 Date December 3, 1999 St-w ilgNt Project Name 27th Avenue Sanitary Sewer Pump Station#45 (2 7 n? `2 San AY SLA) -.lea Property Address/Location See Enclosed Vicinity Map Parcel Number(s) See Parcel List on GIS Map Applicant Agent (If Different than Applicant) Owner Name: Lakehaven Utility District Name:Kenneth R.Canfield Name: Address: 31627 1st Avenue South Address: 10802 Williams Way SW Address: P.O.Box 4249 Lakewood,WA 98498 Federal Way,WA 98063-4249 Phone:(253 ) 941-1516 Phone:( 253 ) 584-5894 Phone:( ) Fax:(253 ) 839-9310 Fax:( 253 ) 983-8284 Fax:( ) Email:dpeny ehaven.or Email: canfieldkcCi,+,s rldnetatt.net ^ mail: Signature: Signature: I k Signature: Zoning Designation t26 7•2/Q _ /W Comp Plan Des' ation Project Description Construction of approximately 350 feet of 8-inch sewer pipe;construction of a pump station;and construction of approximately 600 feet of 6-inch force main. Uniform Building Code(UBC)Construction Type NA (UBC)Occupancy Type NA Type of Permit Required: SEPA Checklist Notice Mailed Sign Board (Refer to Development Submittal Requirements Handout) 1 Annexation R R Binding Site Plan R R R — Boundary Line Adjustment 1 — Comp Plan/Rezone R R Land Surface Modification R R * Lot Line Elimination X Preapplication Conference i Process I(Director's Approval) Process II(Site Nan Review) R* R j Process III(Project Approval) R R R , Process IV(Hearing Examiner's Decision) R Rx2 R Process V(Quasi-Judicial Rezone) Process VI R R R SEPA Only R R Shoreline R R * — Variance R R R Conditional Use R R R Short Subdivision * R * Subdivision R R R Variance R* R R R=Required * =Optional by City MA•XTORA.FRM WWI)2/22/99 . ly)-11‘,L LAKEHAVEN UTILITY DISTRICT laVen 31627-1st Avenue South • P.O.Box 4249 • Federal Way,Washington 98063 �T�ITY DIsnad Federal Way:253-941-1516 • Tacoma:253-927-2922 • Fax:253-839-9310 December 3, 1999 Mr. Greg Fewins, Principal Planner Community Development Services City of Federal Way 33530 1st Way South Federal Way, Washington 98003-6221 Re: Preapplication Conference Land Use Application 27th Avenue S.W. Sanitary Sewer Pump Station#45 Dear Mr. Fewins: Enclosed is a Preapplication Conference Master Land Use Application for the Lakehaven Utility District Sanitary Sewer Pump Station#45. The proposed project consists of the construction of approximately 350 feet of 8-inch sewer line, 600 feet of 6-inch force main, and a pump station. With the exception of about 100 feet of the sewer line and 40 feet of the force main, the entire project within easements that the District is in the process of acquiring. An Environmental Checklist is being prepared for the project by the District and is scheduled to be circulated early next year to all of the required agencies for review and comments. Should you have any questions or require additional information to complete the project review, please call me at(253) 584-5894. Sincerely, Kenneth R. Canfield' Project Engineer KRC/kc Enclosures Cc: File Tom Jovanovich Dick Mayer Donald L.P.Miller Ed Stewart Beverly J.Tweddle Commissioner Commissioner Commissioner Commissioner Commissioner CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT MEMORANDUM DATE: December 6, 1999 TO: Community Development Review Committee (CDRC) Members Public Works Development Services - Traffic Engineering Public Works Development Services - Development Review Lee Bailey, Lead Plans Examiner Mary Young, Supervisor of Technical Services, Lakehaven Utility District Greg Brozek, Federal Way Fire District FROM: Marion B. Hess, Senior Planner MEETING DATES: Internal meeting 12/23; meeting with applicant 12/30. *************************************************************************************** FILE NUMBER: PRE99-0087 PROJECT NAME: 27th Avenue SW Sanitary Sewer Pump Station & Sewer Lines PROJECT ADDRESS: South of SW 3519` Place between 261 and 27th Avenues SW PROJECT DESCRIPTION: Lakehaven Utility District proposes to construct approximately 350 feet of 8 inch gravity sewer line, 600 feet of force main, and a pump station in an utility easement located between 27th Avenue SW and 26th Avenue SW south of SW 3513`Place. Zoning is RS7.2 and RM1800. 72" mil. ride w"-6,a, u PROJECT CONTACT: Donald Perry, @ 253-941-1516 (applicant) ' Kenneth Canfield, Project Engineer, @ 253-584-5894 (Agent) 30` Attachments: MLU Application (3 pages) 3 Zoning Map Site Plan(3 sheets) �Z2 f r t� �1 �-.,A vitio .Qlp i:990087dr.mmo �Y rvisow""' ,,'�Q. 0 i�C.�- _ _Yrw,,,,�,,,hd PORTIONS OF THE: S.W.&SE.1/4 SECITON 24,TWN.21N.,RGE.3E.,W.M. >— N.W.do N.E.1/4 SECTION 25,TWN.21N.,RGE.3E.,W.M. �� CC ad 9164° SSMH 1 (EXISTING MANHOLE) TYPE 1 - 48'0 Z W EXiS1II1GGRAVffYSEW)RILINE STA 0+ Z Q Z Eafe=.2 r, O � J �,. .� ' e � 3slsTrl.�►ceaw, • St 0‘rj::91** f= � iii ��� * ..._ ((PARCEL 1761 t i Q Alternative 1 ' `* c� cn NEW MANHOLE TYPE 1 - 48"0 - ALTERNATIVE 2 CO •^�� ' \��u s \ , 0 a`a*14; V _ ')-�' .... +a *sue 1a.:;� I i. to , 1� • Alternative 1fi, �..4 w -4-- ws t xi, • ��� � J p yq1 SSMH f. T1 NEW MANHOLE) TYPE 1 - 48 ` 1I `� m ��� : O I 04 4�y L' Gt 1�1+ # 44/ Vr . Q = 'F'�, (raRCB. zszlos-9oo7) �a , ii 04, Vi .oP "6.` (PARCEL#252103 9026) cQ0L.,.....s. :: pi o1 o - nil t � Of l. fr ea (PAR : 01761 11160) I o r o^ li o OJ, I EWING GRAVITY SEWER LIVE I 410,0 , 410.0 405 0__ _ . . 405,0 2,SSMH 2 NEW MANHOLES TYPE 1 - 48"0 400,0 -_ 400.0 RIM391.00 INVERT (NW) 373.03 (NEW 8 PIPE) SSMH 1 I reEXISTING TYPE 1 - 48'0 INVERT E) 372.93 (NEW 8 PIPE) 395,0_ _ _ -INVERT 373.70 XISTIN PIP COMMUNIR RECEIVED BYDEPARTMENT 3950 3 0 (� g �) r INVERT 373.69:(EXISTING B',PIPES INVERT S 373.5I(INEXISTING 8 PIPPEE) INVERT SE 373.58 EW 8 PIPE) lkil A 200 390,0I 390,0 II 385,0_ II 305.0 II F 380.0 II II 380,0 rEl x II i 11~ I 1 _375,0 Il_ ,asss _ 37�0__ immemit Y DIOCILErIRON PIPE > 370,0 _ :. 370 d 365.0 h 365,0 cL ON ".0 SHEET a) M M M of ♦ 0+00 1+00 PORTIONS OF THE: S.W. & S.E. 1/4 SECTION 24, "-fVvN. 21N., RGE. 3E, W.M. p- N.W. & N.E. 1/4 SECTION 2.)) TWN. 21N., RGE. 3E., W.M. CITY OF FEDERAL GIs- MAP SCALE: 1" = 200' I,.�GEND D EASEMENTS FOR PROPOSI-i-E PUMP STATION &'FORCE MA17N PARCEL 0 wl',,E:lR- 252103-9047 ANDERSONT 2 5213 — 2 S'AI-;�K, 1761500000 .-T F EDERAL "WAY 1761500305 CITY OF :� � , 0 Li Lnn 'u C3 cz U LLJ CL cl- u Ga LLJ z V) cz LLJ CID 0 rn ��o cm ff CQ C,�Qo co SHEET � o� 339TH MM G W.M. PORTIONS OF THE: S.W. & S.E* 1/4 SECTION 24� TWN. 21N., R 3E, N.W. & N.E. 1/4 SECTION 255 TWN. 21N., R:l'--3E. 3E, W.M. 330TH S 330TH ST w ✓330TH CT 33ISr I P15T PL 331ST CT S 331ST Sr cry w 332ND ST IN, ST 6 333M CT -p �aRD w� 5. S 6 s 333RD Sr 333 ,UTH ST i� 334TH CT 33M ST 5t -AL -A%- — — — — — - cr VICINITY MAP (NOT TO SCALE) an Uni ST 359TI.4 ST -rum,r 9 7- r7) -7 Kz7� i r 7,7T 7r T lh v IEN]i U HA 1� T 7177 7?- r7 -T T" L md7 1 SI-1 A-� I- A.��//T 31 W � w 41.1 PH JOB NO.: DP98501400 Af N 11 t Ln L-i Ca 0 n Ua . ........ cy- a 0- I= wz ILi pl!:�, LD ; < LJ r-- p .. i co W co co LL- C<3 EXISTING GRAVITY SEWER LINE PORTIONS OF THE: S.W. & S:E. 1/4 SECTION 24, TWN. 21N., RGE. 3E. W.M. . N.W. & N.E. 1/4 SECTION 25, TWN. 21N., RGE. 3E., W.M. S.W. 351 ST PL. NEW P1IMP STATIMM5 A-MC14 FnurF ASAT r (PARCEL # 252103-9047) LE( JND EW 8—INCH GRAVITY SEWER LINE s` EW PUMP STATION #45 YEW PUMP STATION #45 6—INCH FORCE MAIN EXISTING GRAVITY, SEWER LINE (PARCEL # 176150000( (PARCEL # .) ,103-9 1 EXIS ING GRAVITY SEWER LINE M 1�