Re: 27TH AVENUE SANITARY SEWER PUMP STATION PROJECT-File#PRE99-0087
Vicinity of SW 35Vt Place between 26th and 27th Avenues SW
Dear Mr. Perry:
This letter summarizes the preapplication conference held on December 30, 1999, at which time
members of the city's Community Development Review Committee(CDRC)discussed the
general requirements that will apply to the above referenced project. Those requirements are
summarized below and are included as enclosures with this letter.
Project Description: Installation of approximately 350 feet of 8-inch gravity sewer line, 600
feet of force main, and a pump station in an utility easement located between 27th Avenue SW
and 26th Avenue SW south of SW 351 st Place.
Development of the site is subject to the RS7.2 and RM1800 zoning and the "Federal Way City
Code"(FWCC). Staff has reviewed the proposal under the FWCC and identified the following
key issues.
PLANNING DIVISION, Marion Hess (253-661-4120)
A. Required Land Use Review Processes and Fees
(1) Site Plan Review: The proposal is permitted under the FWCC subject to site plan
review. The project is also subject to environmental review under the State
Environmental Policy Act(SEPA). The project will require a Process III-Project
Approval review, because environmental review is required. The Director of
Community Development Services issues the Process III project decision, which can be
appealed to the Hearing Examiner.
S
Mr. Donald Perry
Page 2
January 27, 2000
Pursuant to the FWCC, the Process III application shall include a site plan, site survey,
and preliminary landscape plan prepared in accordance with the enclosed Development
Application Submittal Requirements.
(2) State Environmental Policy Act(SEPA): The SEPA threshold determination and appeal
period must be completed before issuance of the Process III project decision. In this
case,Lakehaven Utility District is the Lead Agency and can render an environmental
determination, or Lakehaven may defer the determination to the city's Director of
Community Development Services, which determination can be appealed to the
Hearing Examiner.
(3) Outside Permits: The applicant is responsible to identify and obtain all required state,
federal, or outside agency permits, as the project may require.
(4) Land Use Application Fees Are As Follows:
Process III Project Approval: $1,554.00
SEPA Checklist: $550.00
The above fees include basic review of the land use applications by the Planning
Division. Additional Public Works fees may be charged as necessary (see Public Works
comments, enclosed). Building permit fees are processed and charged separately from
land use applications.
(5) Permitted Uses: The proposed pump station and sewer lines have been determined
compatible with the existing principal and accessory uses of the site, as provided by the
FWCC. Utility lines, fencing, generator, and pump stations will be reviewed under
applicable code regulations and development standards.
(6) Landscaping: Pursuant to the FWCC,the application must include a preliminary
landscape plan for restoring disturbed areas and methods to maintain the landscaping.
(7) Land Surface Modifications: An approved grading plan prepared in accordance with the
city's adopted engineering standards will govern all clearing, grading, and filling
activities associated with the project.
PUBLIC WORKS DEPARTMENT, Ann Dower(253-661-4125)
See enclosed comments. (Note: The Traffic Division has no comments on the proposal.)
BUILDING DIVISION,Joan Hermle(253-661-4152)
The Building Division has no comments on the proposal.
Mr. Donald Perry
Page 3
January 27, 2000
FEDERAL WAY FIRE DEPARTMENT, Greg Brozek(253-946-7241)
See enclosed comments.
As you know, preapplication comments are based on a preliminary review only and should not
be construed to represent final comments on the project. As the project is redesigned, or as more
detailed site plan and environmental information is prepared, additional issues or concerns may
be identified which were not covered at the meeting. We hope you found the preapplication
process useful in identifying key requirements as they relate to the proposal and preparation of
formal application. If you have any questions, please contact me at 253-661-4120, or other staff
person as appropriate.
Sincerely,
Ael g14": rvit
Marion Hess
Senior Planner
enc: Development Application Submittal Requirements
Memorandum from Ann Dower,Public Works
Memorandum from Greg Brozek,Fire Department
Sign-up Sheet
c: Ann Dower,Engineering Plans Examiner
Greg Brozek,Federal Way Fire Department
L:\CSDC\DOC S\S A V E\49707012.DOC
•
CITY OF G
•
(253)661-4000
33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210
May 17, 2000
Mr. Kenneth R. Canfield,P.E.
Project Manager
Lakehaven Utility District
PO Box 4249
F % Le
Federal Way, WA 98063
Dear Mr. Canfield:
Re: 27th Avenue SW Sanitary Sewer Pump Station #45
Administrative Inquiry Number 00-102875
The following is in response to your May 12, 2000,request to immediately install a short section
of eight-inch sewer pipeline under the developed portion of the 35100 block of 27th Avenue SW.
The proposed sewer pipeline is depicted on a drawing you provided(received May 16, 2000).
The sewer pipeline is generally proposed to be constructed within the developed road prism of
27th Avenue SW,based on two potential alignment options. The purpose of immediately
installing this portion of a larger sewer pipeline and pump station project is to avoid open cutting
the city's planned overlay of 27`h Avenue SW.
A larger sewer pipeline and pump station project was reviewed with you on December 30, 1999,
at a city preapplication conference. As we discussed, environmental review is not required for
installation of sewer piping eight inches or less in diameter. However,pump stations are not
listed as exempt actions and as indicated by the district will require environmental compliance.
At that preapplication conference, it was confirmed that the district would be completing
environmental compliance on the pump station portion of the proposed project. In addition, city
staff indicated that the overall project is considered a public utility and will require Process III
land use review before beginning construction.
Based on this background information,the following addresses your questions regarding
immediate installation of this proposed section of pipeline. First,the city would not consider the
installation of only eight-inch sewer piping within the constructed roadway to require
environmental compliance. Second,the city would not consider coordinating the installation of
this short section of sewer piping with the city's planned 27th Avenue SW overlay to be
considered a public utility requiring Process III review. This type of coordination is typical and a
prudent coordination of public agency resources to avoid duplication of efforts or disturbance of
newly overlayed roadway areas.
r
Mr. Kenneth R. Canfield, P.E.
Page 2
May 17, 2000
Therefore, no further environmental or land use review will be required by the city for the
proposed installation of sewer piping as depicted on the drawing received May 16, 2000. Please
be advised that you may be required to obtain a city right-of-way permit before beginning
construction. Questions regarding right-of-way permits can be directed to Kathy Messinger,
Streets Engineering Technician, at 253-661-4127. The preferred alignment alternative should be
discussed with y Messinger in conjunction with the right-of-way permit process.
If I can be of an iSe,please call me at 253-661-4108.
F
Sincerely,
ii4(fr -
Greg Fewins
Principal Planner
c: Marwan Salloum,Federal Way Street Systems Manager
Kathleen Messinger,Federal Way Streets Engineering Technician
L:\CSDC\DOCS\SAVE\48255356.DOCILast printed May 17,2000 9:15 AM
x` LAKEHAVEN UTILITY DISTRICT
;ketiaygn 31627-1st Avenue South • P.O.Box 4249 • Federal Way,Washington 98063
UTILITY DISTI/C� Federal Way:253-941-1516 • Tacoma:253-927-2922 • Fax:253-839-9310
May 12, 2000
Mr. Greg Fewins, Principal Planner
Community Development Services
City of Federal Way
33530 1d Way South :
ustr
Federal Way,Washington 98003-6221l^CIVE D ��p�RT
Cnwe rnirry n
20013
Re: 27th Avenue S.W. Sanitary Sewer Pump Station#45
Project No. LUD98501400
Dear Mr. Fewins:
The City of Federal Way Public Works Department has awarded their annual pavement overlay
contract and are scheduled to start the project this week. When I spoke to John Mulkey, Project
Manager for the City last week, he indicated that the City's contractor is slated to start Schedules A,
B, and C of the overlay program the week of May 15. The 27th Avenue SW overlay is part of
Schedule H.
As you know, the Lakehaven Utility District is proposing to install a new pump station and related
appurtenances next year located near the southerly end of 27th Avenue SW near 351st Place SW.
The sewer system will consist of approximately 350 feet of 8-inch sewer line, 600 feet of 6-inch
force main, and a pump station. With the exception of about 150 feet of the sewer line and 40 feet
of the force main, the entire project will be located within easements that the District is in the
process of acquiring.
On December 30, 1999, a preapplication conference (City File No. PRE99-0087) was held at the
City of Federal Way to review the proposed project. An Environmental Checklist is now being
prepared for the project by the District and is scheduled to be circulated next month to all of the
required agencies for review and comments. The District is also in the process of preparing a Land
Use Application for submittal to the City next month.
The District would like to install that portion of the 8-inch gravity sewer line in 27th Avenue SW
that is scheduled to be overlaid. The length of the line is approximately 150 feet including
manholes. Enclosed for your information, is a half-scale plan that shows the location the 8-inch
pipeline. Two alternatives are being considered. Alternative 1 includes approximately 150 feet of
8-inch pipe and one manhole connecting to the existing sewer manhole at the intersection of 27th
Avenue SW and 351d Place SW. Alternative 2 consists of approximately 80 feet of 8-inch pipe and
two manholes located south of the 27th Avenue SW and 351d Place SW intersection.
Tom Jovanovich Dick Mayer Donald L.P.Miller Ed Stewart Beverly J.Tweddle
Commissioner Commissioner Commissioner Commissioner Commissioner
Mr. Greg Fewins
May 12, 2000
Page 2
We would like City approval to install the 8 inch sewer line before the 27th Avenue Street is
overlaid. Your earliest possible response would be greatly appreciated.
Should you have any questions, or require additional information,please call me(253)584-5894.
Sincerely,
I � >
Kenneth R. Canfiel•,P.E.
Project Manager
KRC:kc
Enclosure
Cc: Don Perry,P.E.,District Manager
File
interoffice
MEMORANDUM Federal Way Dep't of Public Works
Development Services Division
To: Marion B. Hess, Senior Planner
From: Ann Dower, Engineering Plans Reviewer 6131—
Subject: 27th Avenue SW Pump Station&Sewer Lines, PRE99-0087
South of SW 351'Place between 26th and 27th Avenues SW
Date: 1/11/00
After visiting the site and reviewing the site plan, the Public Works Division has determined that the
following items need to be addressed as conditions of the proposed development:
1. A right-of-way permit will be required for work within the public right-of-way.
2. The applicant will need to provide further information on the size and use of any new impervious
area that will be created with this project. Drainage review,treatment,and/or detention may be
required for this project depending on this information. Standards set forth in the 1998 King
County Surface Water Design Manual and the Federal Way Addendum to the KCSWDM will
apply. At a minimum,the applicant will need to provide a T.E.S.C. (erosion control)plan for the
entire length of the project.
(FILENAME\p}
LAILHAVEN UTILITY DISTRICT
31627 1st Avenue South ♦ P. O. Box 4249 • Federal Way,WA 98063
COMMUNITY DEVELOPMENT
TECHNICAL REVIEW COMMITTEE
AGENDA OF: December 30, 1999
ATTN: Mr. Marion Hess
Senior Planner
SUBJECT: Agenda Item No. 1 - 27th Ave SW Sanitary Sewer Pump Station
PRE99-0087
COMMENTS:
The District abstains from comment on this issue.
By: •
Date: /Z 30 q7
Mary . Yo g
Devel pment Services upervisor
Direct Line: (253) 946-5400 FAX: (253) 529-4081
E-mail: myoung@lakehaven.org
11, I, wit
tsCz FEDERAL WAY FIRE DEPARTMENT
E _ S 31617 1st Avenue South
PN Federal Way, Washington 98003-5201
tIRE D Y1
1949TO1999
December 30, 1999
To: Community Development Review Committee
RE: 27th Ave SW Sewer Pump Sta. /Sewer Lines/PRE99-0087/Hess
A separate Uniform Fire Code Permit is required from the Fire
Department for the installation of the fuel supply for the
emergency generator.
If you require additional information from the Fire Department,
please call 253-946-7318 .
Sincerely,
Greg Brozek
Fire Marshal ' s Office
Phone: (253) 839-6234 or (253) 927-3118 • E-mail: info@federalwayfire.org • Fax: (253) 529-7206
An Equal Opportunity Employer
SIGN UP SHEET
LAKEHAVEN 27TH AVENUE SW SANITARY SEWER PUMP STATION & SEWER LINES
South of SW 3519' Place, Between 26th and 27`h Avenues SW
PRE-APPLICATION MEETING
PRE99-0087
December 30, 1999
9:00 a.m.
Name Project Affiliation Telephone #
l' iltivwx‘, 6‘-) CA C,ufLeircik U1/41u-k zs3-60-4izo
--62(41 ae
C tip Pie Goi )17 I IY9 IF?"id Ls.,5
PARY Yo(14 4 L4KEHA✓tnl UTa rrY Dl57XZi6_T Z53-9 -5*00
at41- DM/el- `M"l Fed c.4 P eu. LJ0,14.1. zs-3
e�.rp� ;•#fir ^,_er♦ .,. 6Ifk.) *ya L 'S` 4.4a( " 4%4_4)
CITY OF FEDERAL WAY
DEPARTMENT OF COMMUNITY DEVELOPMENT
MEMORANDUM
DATE: December 6, 1999
TO: Community Development Review Committee (CDRC) Members
Public Works Development Services - Traffic Engineering
Public Works Development Services - Development Review
Lee Bailey, Lead Plans Examiner
Mary Young, Supervisor of Technical Services, Lakehaven Utility District
Greg Brozek, Federal Way Fire District
FROM: Marion B. Hess, Senior Planner
MEETING DATES: Internal meeting 12/23; meeting with applicant 12/30.
***************************************************************************************
FILE NUMBER: PRE99-0087
PROJECT NAME: 27`' Avenue SW Sanitary Sewer Pump Station & Sewer Lines
PROJECT ADDRESS: South of SW 351St Place between 26th and 27th Avenues SW
PROJECT DESCRIPTION: Lakehaven Utility District proposes to construct approximately 350 feet of
8 inch gravity sewer line, 600 feet of force main, and a pump station in an utility easement located between
27th Avenue SW and 261h Avenue SW south of SW 3519`Place. Zoning is RS7.2 and RM1800.
PROJECT CONTACT: Donald Perry, @ 253-941-1516 (applicant)
Kenneth Canfield, Project Engineer, @ 253-584-5894 (Agent)
Attachments: MLU Application (3 pages)
Zoning Map
Site Plan (3 sheets)
i:990087dr.mmo
CITY OF
•-
(253)661-4000
FW 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210
December 7, 1999
Mr. Donald Perry a �y
Lakehaven Utility District
PO Box 4249
Federal Way, WA 98063-4249
Rw: 27TH AVENUE SANITARY SEWER PUMP STATION PROJECT—Preapplication Meeting
South of SW 351"Place between 26th and 27th Avenues SW—File NQ PRE99-0087
Dear Mr. Perry:
The above referenced proposal was filed December 6, 1999, and has been assigned to me as
project planner. At this time,the submittal packet has been routed to members of the
Development Review Committee. A meeting with project proponents has been scheduled as
follows:
December 30, 1999 at 9:00 a.m.
City Hall
Department of Community Development Services
33530 First Way South
Federal Way,WA 98003
We look forward to meeting with you, or your representative, at that time. Please call me as soon
as possible at(253) 661-4120 if you have any questions, or are not able to attend the meeting.
Sincerely,
e 46,0.
Marion B. Hess
Senior Planner
c: Kenneth R.Canfield, 10802 Williams Way SW,Lakewood,WA 98498
L:'PRMSYS\DOCUMENT\PRE99 00.87\SCHEDULE.DOC
F 2 F.r IVE I
_ 11 TER LAND USE APPLICATION
I)F c 0 1 t 999 DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
.. AY 33530 First Way South,Federal Way,WA 98003
Gi fY Or FEIJ riAL WAY • (253)6614000—Fax(253)661-4129
-BIALLDING-
APPLICATION No 1E'1'1 008 7 Date December 3, 1999
St-w ilgNt
Project Name 27th Avenue Sanitary Sewer Pump Station#45 (2 7 n? `2 San AY SLA) -.lea
Property Address/Location See Enclosed Vicinity Map Parcel Number(s) See Parcel List on GIS Map
Applicant Agent (If Different than Applicant) Owner
Name: Lakehaven Utility District Name:Kenneth R.Canfield Name:
Address: 31627 1st Avenue South Address: 10802 Williams Way SW Address:
P.O.Box 4249 Lakewood,WA 98498
Federal Way,WA 98063-4249
Phone:(253 ) 941-1516 Phone:( 253 ) 584-5894 Phone:( )
Fax:(253 ) 839-9310 Fax:( 253 ) 983-8284 Fax:( )
Email:dpeny ehaven.or Email: canfieldkcCi,+,s rldnetatt.net ^ mail:
Signature: Signature: I k Signature:
Zoning Designation t26 7•2/Q _ /W Comp Plan Des' ation
Project Description Construction of approximately 350 feet of 8-inch sewer pipe;construction of a pump station;and construction of
approximately 600 feet of 6-inch force main.
Uniform Building Code(UBC)Construction Type NA (UBC)Occupancy Type NA
Type of Permit Required: SEPA Checklist Notice Mailed Sign Board
(Refer to Development Submittal Requirements Handout) 1
Annexation R R
Binding Site Plan R R R
—
Boundary Line Adjustment 1
—
Comp Plan/Rezone R R
Land Surface Modification R R *
Lot Line Elimination
X Preapplication Conference i
Process I(Director's Approval)
Process II(Site Nan Review) R* R j
Process III(Project Approval) R R R ,
Process IV(Hearing Examiner's Decision) R Rx2 R
Process V(Quasi-Judicial Rezone)
Process VI R R R
SEPA Only R R
Shoreline R R *
—
Variance R R R
Conditional Use R R R
Short Subdivision * R *
Subdivision R R R
Variance R* R R
R=Required * =Optional by City
MA•XTORA.FRM
WWI)2/22/99
. ly)-11‘,L
LAKEHAVEN UTILITY DISTRICT
laVen 31627-1st Avenue South • P.O.Box 4249 • Federal Way,Washington 98063
�T�ITY DIsnad Federal Way:253-941-1516 • Tacoma:253-927-2922 • Fax:253-839-9310
December 3, 1999
Mr. Greg Fewins, Principal Planner
Community Development Services
City of Federal Way
33530 1st Way South
Federal Way, Washington 98003-6221
Re: Preapplication Conference Land Use Application
27th Avenue S.W. Sanitary Sewer Pump Station#45
Dear Mr. Fewins:
Enclosed is a Preapplication Conference Master Land Use Application for the Lakehaven Utility District
Sanitary Sewer Pump Station#45.
The proposed project consists of the construction of approximately 350 feet of 8-inch sewer line, 600 feet of
6-inch force main, and a pump station. With the exception of about 100 feet of the sewer line and 40 feet of
the force main, the entire project within easements that the District is in the process of acquiring.
An Environmental Checklist is being prepared for the project by the District and is scheduled to be
circulated early next year to all of the required agencies for review and comments.
Should you have any questions or require additional information to complete the project review, please call
me at(253) 584-5894.
Sincerely,
Kenneth R. Canfield'
Project Engineer
KRC/kc
Enclosures
Cc: File
Tom Jovanovich Dick Mayer Donald L.P.Miller Ed Stewart Beverly J.Tweddle
Commissioner Commissioner Commissioner Commissioner Commissioner
CITY OF FEDERAL WAY
DEPARTMENT OF COMMUNITY DEVELOPMENT
MEMORANDUM
DATE: December 6, 1999
TO: Community Development Review Committee (CDRC) Members
Public Works Development Services - Traffic Engineering
Public Works Development Services - Development Review
Lee Bailey, Lead Plans Examiner
Mary Young, Supervisor of Technical Services, Lakehaven Utility District
Greg Brozek, Federal Way Fire District
FROM: Marion B. Hess, Senior Planner
MEETING DATES: Internal meeting 12/23; meeting with applicant 12/30.
***************************************************************************************
FILE NUMBER: PRE99-0087
PROJECT NAME: 27th Avenue SW Sanitary Sewer Pump Station & Sewer Lines
PROJECT ADDRESS: South of SW 3519` Place between 261 and 27th Avenues SW
PROJECT DESCRIPTION: Lakehaven Utility District proposes to construct approximately 350 feet of
8 inch gravity sewer line, 600 feet of force main, and a pump station in an utility easement located between
27th Avenue SW and 26th Avenue SW south of SW 3513`Place. Zoning is RS7.2 and RM1800.
72" mil. ride w"-6,a, u
PROJECT CONTACT: Donald Perry, @ 253-941-1516 (applicant) '
Kenneth Canfield, Project Engineer, @ 253-584-5894 (Agent)
30`
Attachments: MLU Application (3 pages) 3
Zoning Map
Site Plan(3 sheets)
�Z2 f r t� �1 �-.,A vitio .Qlp
i:990087dr.mmo �Y rvisow""' ,,'�Q. 0
i�C.�- _ _Yrw,,,,�,,,hd
PORTIONS OF THE: S.W.&SE.1/4 SECITON 24,TWN.21N.,RGE.3E.,W.M. >—
N.W.do N.E.1/4 SECTION 25,TWN.21N.,RGE.3E.,W.M. ��
CC
ad
9164°
SSMH 1 (EXISTING MANHOLE) TYPE 1 - 48'0 Z W
EXiS1II1GGRAVffYSEW)RILINE STA 0+ Z Q Z
Eafe=.2 r, O � J
�,. .� ' e � 3slsTrl.�►ceaw, • St
0‘rj::91**
f= �
iii
��� * ..._ ((PARCEL 1761 t i Q
Alternative 1 ' `* c� cn
NEW MANHOLE TYPE 1 - 48"0 - ALTERNATIVE 2 CO
•^�� ' \��u s \ , 0
a`a*14; V _ ')-�' .... +a *sue 1a.:;� I i.
to , 1�
•
Alternative 1fi, �..4 w -4-- ws t xi,
• ��� � J p yq1
SSMH f. T1 NEW MANHOLE) TYPE 1 - 48 ` 1I `� m ��� : O I 04 4�y L' Gt
1�1+ # 44/ Vr . Q =
'F'�, (raRCB. zszlos-9oo7) �a , ii
04,
Vi
.oP "6.` (PARCEL#252103 9026) cQ0L.,.....s.
:: pi o1
o - nil t
� Of
l. fr ea (PAR : 01761 11160) I o
r o^ li
o OJ, I
EWING GRAVITY SEWER LIVE I
410,0 , 410.0
405 0__ _ . . 405,0
2,SSMH 2 NEW MANHOLES TYPE 1 - 48"0
400,0 -_ 400.0
RIM391.00
INVERT (NW) 373.03 (NEW 8 PIPE)
SSMH 1 I reEXISTING TYPE 1 - 48'0 INVERT E) 372.93 (NEW 8 PIPE)
395,0_ _ _ -INVERT 373.70 XISTIN PIP COMMUNIR RECEIVED BYDEPARTMENT 3950
3 0 (� g �) r
INVERT 373.69:(EXISTING B',PIPES
INVERT S 373.5I(INEXISTING 8 PIPPEE)
INVERT SE 373.58 EW 8 PIPE) lkil A 200
390,0I
390,0
II
385,0_ II 305.0
II F
380.0
II
II 380,0 rEl x
II i
11~ I 1
_375,0 Il_
,asss _
37�0__
immemit
Y DIOCILErIRON PIPE >
370,0 _ :. 370 d
365.0 h
365,0
cL ON ".0 SHEET
a) M M M
of
♦
0+00 1+00
PORTIONS OF THE: S.W. & S.E. 1/4 SECTION 24, "-fVvN. 21N., RGE. 3E, W.M.
p-
N.W. & N.E. 1/4 SECTION 2.)) TWN. 21N., RGE. 3E., W.M.
CITY OF FEDERAL GIs- MAP
SCALE: 1" = 200'
I,.�GEND
D EASEMENTS FOR
PROPOSI-i-E
PUMP STATION &'FORCE MA17N
PARCEL 0 wl',,E:lR-
252103-9047 ANDERSONT
2 5213 — 2 S'AI-;�K,
1761500000 .-T F EDERAL "WAY
1761500305 CITY OF :� � ,
0
Li Lnn
'u
C3
cz
U
LLJ
CL
cl-
u
Ga
LLJ
z
V)
cz
LLJ
CID
0
rn
��o
cm
ff
CQ
C,�Qo
co
SHEET
�
o�
339TH
MM
G
W.M.
PORTIONS OF THE: S.W. & S.E* 1/4 SECTION 24� TWN. 21N., R 3E,
N.W. & N.E. 1/4 SECTION 255 TWN. 21N., R:l'--3E. 3E, W.M.
330TH
S 330TH ST w
✓330TH CT 33ISr
I
P15T PL 331ST CT
S 331ST Sr cry
w 332ND ST IN, ST
6
333M CT -p
�aRD w� 5. S 6 s 333RD Sr
333
,UTH ST i�
334TH CT
33M ST
5t
-AL -A%- — — — — — -
cr
VICINITY MAP
(NOT TO SCALE)
an
Uni ST
359TI.4 ST
-rum,r
9
7- r7)
-7 Kz7�
i r 7,7T 7r
T lh v IEN]i U
HA 1�
T
7177 7?- r7
-T T"
L
md7 1 SI-1 A-�
I- A.��//T
31
W � w
41.1
PH
JOB NO.: DP98501400
Af
N
11
t
Ln
L-i
Ca
0
n
Ua
. ........
cy-
a
0-
I=
wz
ILi pl!:�,
LD ; <
LJ r--
p
..
i
co
W
co
co
LL-
C<3
EXISTING GRAVITY SEWER LINE
PORTIONS OF THE: S.W. & S:E. 1/4 SECTION 24, TWN. 21N., RGE. 3E.
W.M. .
N.W. & N.E. 1/4 SECTION 25, TWN. 21N., RGE. 3E., W.M.
S.W. 351 ST PL.
NEW P1IMP STATIMM5 A-MC14 FnurF ASAT r
(PARCEL # 252103-9047)
LE( JND
EW 8—INCH GRAVITY SEWER LINE
s` EW PUMP STATION #45
YEW
PUMP STATION #45 6—INCH FORCE MAIN
EXISTING GRAVITY, SEWER LINE
(PARCEL # 176150000(
(PARCEL # .) ,103-9
1 EXIS ING GRAVITY SEWER LINE
M
1�