23-101711Electrical
CinityDe elopme t Permit #:23-101711-00-EL
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003 F L F,'3,
Inspection Request Line: (253) 835-3050
Ph: (253) B35-2607 Fax: (253) 835-2609
Project Name: WIGGINS
Project Address: 3017 SW 325TH PL Parcel Number: 873190 2090
Project Description: ADD CIRCUIT FOR AC/ FURANCE
Owner
Applicant
Contractor
KEVIN & KATHERINE WIGGINS
ASHLEY KARCHSOUND HEATING & A/C
SOUND HEATING & A/C (ELECTRICAL)
3017 SW 325TH PL
5526 184TH ST E
SOUNDHC867DE (3/6/24)
FEDERAL WAY WA 980023
PUYALLUP WA 98375
5526 184TH ST E SUITE A
PUYALLUP WA 98375
Additional Permit Information
Is this an Online or O.T.C. application?------------------ Yes
Electrical Fixtures
Circuits - Residential 2
PERMIT EXPIRES Saturday, 30 September, 2023
Permit Issued on Monday, April 3, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 6- Date:
cnr Of
Federal Way
THIS CARD IS TO RENUUN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2S3) 835-3050 :
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate_ Fork mist not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑
LIFER Ground (4295)❑
Ditch corer (4030)
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
❑
Temporary Po`rer (4275)
Q
Service (4235)
Approved
Approved
Approved
B�
Date
By
Date
By
Date
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
❑ Feeders/Sub-panels (4045)
Approved
Approved
Approved
By
Date
By
Date
By
Date
En Final - Electrical (4055)
Approved
By
Date�����
..
�i'► �i i W
❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 3❑ Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date By Date
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑3
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date