Loading...
23-101792City of Federal Way s Community Development Dept. 33325 8th Ave S - y Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: COMSTOCK Project Address: 31003 49TH PL SW Project Description: Septic Pumping System Electrical Permit #:23-101792-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 184080 0060 Owner Applicant Contractor MICHAEL V COMSTOCK WILL GILLISPIERIVERTON ELECTRICAL RIVERTON ELECTRICAL SERVICES 31003 49TH PL SW SERVICES LLC RIVERES85ILA (6/2/23) FEDERAL WAY WA 98023-2002 4116 S 131ST ST 4116 S 131 ST ST TUKWILA WA 98168 TUKWILA WA 98168 Is this an Online or O.T.C. application?........ Circuits - Residential Additional Permit Information Yes Electrical Fixtures CONDITIONS: Inspection approval is required prior to covering or concealing any portion of the septic electrical system, including the pump. New septic & effluent tanks containing electrical wires and equipment MUST be inspected and approved PRIOR to being loaded with sewage. (Per 296-46B-501-001(b)(7)WAC) PERMIT EXPIRES Tuesday, 3 October, 2023 Permit Issued on Thursday, April 6, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: nu INIP - Date- CITY Of' Federal Way THIS CARD IS TO RENLUN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 535-3050 Scheduled inspections may be failed if this cud is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Fork nnrst not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LTFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete ByDate By Date � "^p�, By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date t ; By Final - Electrical (4055) Approved �rIQ J� Date /d MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final -'Mechanical (4065) Approved Approved to release test Approved By Date By Date Bp Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date