23-101535City of Federal Way
r
Community Development Dept
33325 8th Ave S
1 t
Federal Way, WA 98003--
Ph: (253)835-2607 Fax: (253) 835-2609
Project Name: OTTO
Project Address: 31729 42ND AVE SW
Project Description: New gas line ran from meter to new dryer location
cv,
- %inbing-
Permit #:23-101535-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 873198 3020
Owner
Applicant
Contractor
NATHANIEL & KARI OTTO
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING ELECTRIC
31729 42ND AVE SW
COOLING ELECTRIC LLC
LLC (PLUMBING)
FEDERAL WAY WA 98023
505 "F" ST SE
ALLREHC79804 (9/6/24)
AUBURN WA 98002
1020 S 344TH ST SUITE 205
FEDERAL WAY WA 98003
Plumbing Fixtures
Other Plumbing Fixtures 1
PERMIT EXPIRES Wednesday, 20 September, 2023
Permit Issued on Friday, March 24, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
s ' ton d the Cit of Federal Way.
Owner or agent: .0 1\Date:
V`)V4
cIrr orS "
Federal Way
THIS CARD IS TO RENUUN O\-SITE
Construction Inspection Record
INSPEC'TIO\ REQUESTS: (2-3) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TBI.S C k". Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_
ELECTRICAL
0
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q
Pool Bonding (4195)
0
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
By
Date
BY
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
o
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
Q
By
Mechanical Rough -in (4165)
Approved
Date
2❑
By
Gas Piping (4125)
Approved to release test
Date 'V7
Q
By
Final - Mechanical (4065)
Approved
Date 7 L
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date