23-101346City of Federal Way
Community Development DepL
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) B35-2607 Fax: (253) 835-2609
Project Name: EKLUND
Project Address: 32228 22ND AVE SW
Project Description: gas furnace replacement
Mechanical
Permit #:23-101346-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 873180 1230
Owner
Applicant
Contractor
GREGORY EKLUND
TAYLER MANNINGPACIFIC HEATING &
PACIFIC AIR SYSTEMS (JGENERAL)
32228 22ND AVE SW
COOLING
PACIFAS093KA (9/8/23)
FEDERAL WAY WA
8607 DURANGO ST SW SUITE A
12811 PACIFIC HWY SW
98023-2555
TACOMA WA 98499
LAKEWOOD WA 98499
Additional Permit Information
Mechanical Work Valuation?. ...... .......................... 8138 Is this an Online or O.T.C. application?.................. Yes
Furnaces 1
PERMIT EXPIRES Sunday,10 September, 2023
Permit Issued on Tuesday, March 14, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: „ K 1 L Date:
CITY M r _k
Federal Way
THIS C LRD IS TO ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS C :A.RD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work nnrst not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
El
LIFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Serice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
roved
By
Date
By
Date
By
Date
El
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
approved/
By
Date
13■
Date
By
/ " -7
/� Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date