23-101549City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
�-^ i^ A-w•ZIm--Y9 L - -
Project Name: ACUNA
Project Address: 2406 SW 318TH ST
Project Description: Low voltage connections for furnace replacement
Electrical
Permit #:23-101549-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 193840 0140
Owner
Applicant
Contractor
PAUL ACUNA
SARAH TURNERGLENDALE HEATING &
GLENDALE HEATING & A/C
2406 SW 318TH ST
A/C
(ELECTRICAL 06)
FEDERAL WAY WA
12462 DES MOINES WAY S
GLENDHAO03CM (2/14/24)
98023-2274
SEATTLE WA 98168-2266
12462 DES MOINES MEMORIAL DR
SEATTLE WA 98168-2266
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
It lectricaI Fixtures
Low Voltage - Other (Resident 1
PERMIT EXPIRES Saturday, 23 September, 2023
Permit Issued on Monday, March 27, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and the City of Federal Way.
Owner or agent: Date_
lel
CITY Of
Federal Way
THIS CARD IS TO RE'NI_-I\ O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TBIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
Bp
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
B}
Date
Final - Electrical (4055)
By
Approved
/L/A�— Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
Q
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date