Loading...
23-101549City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 �-^ i^ A-w•ZIm--Y9 L - - Project Name: ACUNA Project Address: 2406 SW 318TH ST Project Description: Low voltage connections for furnace replacement Electrical Permit #:23-101549-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 193840 0140 Owner Applicant Contractor PAUL ACUNA SARAH TURNERGLENDALE HEATING & GLENDALE HEATING & A/C 2406 SW 318TH ST A/C (ELECTRICAL 06) FEDERAL WAY WA 12462 DES MOINES WAY S GLENDHAO03CM (2/14/24) 98023-2274 SEATTLE WA 98168-2266 12462 DES MOINES MEMORIAL DR SEATTLE WA 98168-2266 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes It lectricaI Fixtures Low Voltage - Other (Resident 1 PERMIT EXPIRES Saturday, 23 September, 2023 Permit Issued on Monday, March 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton and the City of Federal Way. Owner or agent: Date_ lel CITY Of Federal Way THIS CARD IS TO RE'NI_-I\ O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) S35-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TBIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) Q Service (4235) Approved Approved Approved By Date By Date Bp Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date B} Date Final - Electrical (4055) By Approved /L/A�— Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date