Loading...
23-101348r City of Federal Way Community Development Dept. yy 33325 8th Ave S J! ut+•t^ Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ABDELMOTELEB Project Address: 2924 SW 339TH ST Electrical Permit #:23-101348-00-EL Inspection Request Line: (253) 835-3050 Project Description: Replace existing 200A electrical panel, add car charger plug Parcel Number: 010920 0050 Owner Applicant Contractor AKRAM ABDELMOTELEB PAUL SPINOSADEPENDABLE ELECTRIC DEPENDABLE ELECTRIC LLC (01) 2924 SW 339TH ST LLC DEPENEL882Q6 (12/4/24 FEDERAL WAY WA 98023 9330 S STEELE ST APT 2 9330 S STEELE ST APT 2 TACOMA WA 98444 TACOMA WA 98444 Additional Permit Information Is this an Online or O.T.C. application? ............... . Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential PERMIT EXPIRES Sunday, 10 September, 2023 Permit Issued on Tuesday, March 14, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent' ONI INF _ Date: 4d& CITY w 4411 Federal Way THIS C _-'LRD IS TO REALUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 535-3050 Scheduled inspections may; be failed if this card is not on -site. DO NOT LOSE THIS C:kRD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-ffoina inspections are logged on the back of this card. ELECTRICAL 0 By UFER Ground (4295) Approved Date Q By Ditch cover (4030) Approved Date 0 By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date El Final - Electrical (4055) Approved By /] ZIel Date MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date