Loading...
23-100926Mechanical City °fFedePermit #:23-100926-00-ME Community Developmentopment Dept. r_ 33325 8th Ave S Federal Way, WA 98003 r I L Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WATT Project Address: 35026 8TH PL SW Parcel Number: 132174 0640 Project Description: INSTALLING GENERATOR WITH GAS PIPING Owner Applicant Contractor STEVEN& GERI WATT KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 35026 8TH PL SW ENERGY SERVICES CO (GENERAL) FEDERAL WAY WA- 98023-8453 3909 196TH ST SW WASHIES85INS (9/7/23) LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation? .................................. 18000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Gas Piping 1 Gas Pipe Outlets i PERMIT EXPIRES Sunday, 20 August, 2023 Permit Issued on Tuesday, February 21, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: _N� CITY or Federal Way THIS C .RD IS TO REAL -IN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL Q By U'FER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Ea Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release t Approved By Date $► -0 Date L43 By a Date PLUMBING Q Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑� Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date