Loading...
23-101548City or Federal Way •'! _ Community Development Dept P''' • ' •= - 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ACUNA Project Address: 2406 SW 318TH ST Project Description: Replace gas furnace like in kind Mechanical Permit #:23-101548-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 193840 0140 Owner Applicant Contractor PAUL ACUNA SARAH TURNERGLENDALE HEATING & GLENDALE HEATING & A/C (GENERAL 2406 SW 318TH ST A/C 01) FEDERAL WAY WA 12462 DES MOINES WAY S GLENDHA053Q2 (11/2/23) 98023-2274 SEATTLE WA 98168-2266 12462 DES MOINES MEMORIAL DR SEATTLE WA 98168-2266 Additional Permit Information Mechanical Work Valuation?._.... ................. . ........ 4000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Saturday, 23 September, 2023 Permit Issued on Monday, March 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of a hsn tan and the City of Federal Way. Owner or agent: Date: I THIS CARD IS TO REM-�L\ ON -SITE FCITederal WayConstruction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections that be failed if this card is not on -site. DO NOT LOSE TEIIS CA .RD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate. Work roust not be covered until it is approved. C3teck with your inspector if you are unsure about any of the nupections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295) ❑ Ditch cover (4030) Approved Approved By Date By Date El Pool Bonding (4195) ❑ Temporary- Poker (4275) Approved Approved By Date By Date ❑ Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Approved Approved By Date By Date Final - Electrical (4055) Approved By Date ❑ Mechanical Rough -in (4165) Approved By Date MECHANICAL ❑ Gas Piping (4125) Approved to release test By Date PLUMBING Slab/Concrete Floor (4255) Approved to place concrete By Date Service (4235) Approved By Date ❑ Ceiling Corer (4020) Approved By Date El Final -Mechanical (4065) Approved e� By /L— Date 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date