Loading...
23-101556City of Federal Way � Community Development Dept. I �= •T•� 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: NASH Project Address: 33332 40TH AVE SW Project Description: Installing Gas Furnace "Like for Like" Mechanical Permit 9:23-101556-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 327900 0370 Owner Applicant Contractor BRIAN NASH JASON HUNTHUNTS SERVICES HUNTS PLUMBING & MECH (GENERAL) 33332 40TH AVE SW 8111 E PACIFIC HWY HUNTSPM887MW (7/28/24) FEDERAL WAY WA 98023 TACOMA WA 98422 8111 PACIFIC HWY E TACOMA WA 98422 Additional Permit Information Mechanical Work Valuation? ...............................— 4753, Is this an Online or O.T.C. application?.................. Yes Furnaces PERMIT EXPIRES Sunday, 24 September, 2023 Permit Issued on Tuesday, March 28, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ,,�IqsVgtj and C' deral Way. Owner or agent: Date: � _%11- CRY Or .4 `. Federal Way THIS CARD IS TO RENUUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections mav be failed if du, card is not on -site. DO NOT LOSE TB IS CARD. Inspections are listed as close to sequential order as possible (read left to rightm ton to bottom), Please schedule inspections as appropriate. Work trust not be co:-ered until it is approved. Check Mth your inspector if you are unsure about any of The Wspectioas or the inspection sequence. On -going inspections are logged on the back of this card_ ELECTRICAL ❑ L-FER Ground (4295) ❑ Ditch cover (4030) Approved Approved By Date By Date Pool Bonding (4195) ❑ Temporary Power (4275) Approved Approved By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) Approved Approved By Date By Date El Final - Electrical (4055) ' Approved By Date ❑ Mechanical Rough -in (4165) Approved By Date MECHANICAL ❑ Gas Piping (4125) Approved to release test By Date PLUMBING El Slab/Concrete Floor (4255) Approved to place concrete By Date Service (4235) Approved B-,• Date ❑ Ceiling Cover (4020) Approved By Date 0 Final -'Mechanical (4065) -Aped Date /✓ �/ By Dated ❑ Plumbing Groundwork (4190)❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date