Loading...
93-101247 (2) CITY OF • - D (206)661-4000 �\) 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210 December 23, 1993 Mr. Tom Touma fvLes 15668 West Valley Highway Seattle, WA 98188 RE: Pre-application Review, Cedar Knoll Subdivision PRE93-0029 Dear Mr. Touma: Ron Garrow has completed the review of your revised conceptual plat drawings submitted October 20, 1993. In summary, road alignment, road improvement requirements, and drainage issues were analyzed for your proposed ten lot subdivision at South 312th Street and Fourth Avenue South in Federal Way. The following is a summary of issues discussed at your December 10, 1993 meeting with Ron. Please be advised other issues discussed in my July 7, 1993, pre-application letter are still valid, and require resolution with the preliminary plat application. 1. Proposed Fourth Court South does not adequately align with the existing roadway to the south of South 312th Street. An adjustment must be made. The conceptual plat drawing depicts the centerline of Fourth Avenue South, south of South 312th Street, 5.42 feet east of the west property line of the subject site. If this is true, a suggested street configuration may include two feet of gravel shoulder from the west property line and 18 feet of paved street to a vertical curb and gutter. This would place the vertical curb approximately 14.58 feet east of the projected centerline of Fourth Avenue South. The required paved street width for Fourth Court South is 28 feet per Federal Way City Code (FWCC). Therefore, the ultimate street would be only .58 feet off-center. This would be an acceptable deviation from FWCC street alignment requirements. Curb, gutter, landscape strip, and sidewalk would be required only on the east side of the proposed street. The above street configuration is only a suggestion. Acceptance by the council's Land Use Committee or City Council is not assured. Mr. Tom Touma December 23, 1993 Page 2 2. The completion of Fourth Court South would be accomplished by the adjacent property owner(s) when their property is proposed to be further developed. This would result in a 12-foot setback from the property line for the house on Tax Lot 132. 3. The proposed underground detention is not acceptable. All detention facilities for single family platting requires above ground storage for easier maintenance and accessibility by city maintenance crews. 4. Water must be properly treated prior to discharge off the site. Proposed biofiltration swale configuration will not provide proper treatment of runoff and would require breaks in the curbs at frequent intervals. Another alternative must be developed. Please be advised that this information is provided in response to the material you presented on October 20, 1993. As the project is redesigned, or as more detailed information is prepared, additional issues or concerns may arise which were not covered at the meeting. I hope this information is helpful in the design of your project. Please call either Ron Garrow (661-4137) or me (661-4110) with any questions regarding the proposal. Respectfully, Bill kfingman Associate Planner c: Ron Garrow, Senior Development Engineer Dick Mumma, Building Official Rick Gilmore, Supervisor of Technical Services, FW Water and Sewer Pat Kettenring, Assistant to the Fire Marshal, KC Fire District#39 PRE9329.L2 CITY OF /moo` • PUBLIC WORKS MEMORANDUM TO: Bill Kingman FROM: Ron Garrow For Your Information DATE: December 20, 1993 Respond By: SUBJECT: Cedar Knoll I have discussed the proposed subdivision layout with Philip especially regarding the alignment of Fourth Court South. Based on this discussion the following comments are submitted. These comments have been verbally conveyed to Tom Touma. No written response has yet been made. 1. The proposed 4th Court South does not adequately align with the existing roadway to the south of S. 312th St. This adjustment will need to be made for any plat approval. The preliminary plat drawing depicts the centerline of 4th Ave. S. south of S. 312th St. as being located 5.42 feet east of the west property line of the subject site. If this is true, a suggested street configuration might be providing 2 feet of gravel shoulder from the west property line and then 18 feet of paved street to a vertical curb and gutter. This would place the vertical curb approximately 14.58 feet east of the projected centerline of 4th Ave. South. The required paved street width for 4th Court S. is 28 feet per City Code. Therefore, the ultimate street would be only .58 feet off-center. this would be and acceptable deviation. Curb, gutter, landscape strip, and sidewalk only on the east side would be required. 2. The completion of 4th Court S. would need to be done by the adjacent property owner(s) when their property is proposed to be further developed. This would result in a 12-foot setback from the property line for the house on Tax Lot 132. 3. The proposed underground detention would not be acceptable. All detention facilities for single family platting requires above ground storage for easier maintenance and accessibility for the City maintenance crews. This will need to be revised. 4. Water will need to be properly treated prior to discharge off the site. The biofiltration swale configuration currently suggested would not result in proper treatment of runoff and would require breaks in the curbs at frequent intervals. Another alternative will need to be developed. The above street configuration is only a suggestion and acceptance by the Land Use Committee or the entire City Council is not assured. From: RON GARROW (RONG) To: BILLK Date: Tuesday, November 16, 1993 3:07 pm Subject: Cedar Creek Comments -Reply I have looked at the layout but will need to consider several issues: 1. Misalignment with 4th Ave. S. to the south. 2. Use of segregated curbing to allow runoff into adjacent biofiltration swale. 3. Providing only half street instead of full street improvements. 4. Partial treatment of runoff in the swales. Full treatment would not result from this proposal. The use of underground detention will not be acceptable for a public system. City policy is to provide detention ponds. Further review and considerations are being made. No time frame. Sorry. City of Federal Way Department of Community Development Memorandum TO: File FROM: Bill Kingman RE: Preapplication, Cedar Knoll Subdivision, PRE93-0029 DATE: October 29, 1993 I have reviewed the revised (the road was narrowed and biofiltration swale located on the east side of the street) conceptual drawings for division of one 2.34 acre residential lot into ten lots at South 312th Street and 4th Avenue South (if extended) . The site zoning is RS 7.2. Minimum lot size is 7,200 square feet. ISSUES 1. All planning issues discussed in the 7/7/93 preapplication letter are still valid. The proposed road realignment does not affect these issues. However, is it appropriate to locate biofiltration swales in front of residential lots? The revision shows the swale on the west side of the road. It was previously proposed on the east side of the road. Surface water conveyance systems (open ditches) are allowed by other cities in front of residential lots, but FWCC must be consulted for guidance. PRE9329.ME3 TOUMA ENGINEERS COMMUNITY DEVELOPMENT DEPARTMENT OCT 201993 October 12, 1993 Mr. Bill Kingman, Associate Planner City of Federal Way 33530 1st Way South Federal Way, WA 98003-6210 RE: Pre-Application Review, Cedar Knoll Subdivision - PRE93-0029 Dear Mr. Kingman: Pursuant to our pre-application meeting and receipt of your letter dated July 7, 1993, we wish to submit a revised layout for the proposed ten lot subdivision for your consideration and approval. We understand that the access proposed for the subject property as depicted on the pre-application plan is not acceptable, because it does not conform to the separation criteria for intersection of roads. It appears the other issues discussed in our meeting related to zoning, storm drainage, sewer and water do present problems that would prohibit compliance with the City's code and platting requirements. Since our last meeting we have evaluated several schemes as they relate to the access to the subject property from South 312th Street. We have studied the possibility of providing access along the Easterly portion of the property. Also, we have re-evaluated the previously proposed alignment to coincide with Fourth Avenue South in an effort to provide proper access to the property. An access along the Easterly portion of the property is not feasible because of the property's geometry abutting South 312th Street and narrow frontage. Consequently, it does not conform to the minimum 150-foot separation requirements. Also, it was discovered that the Easterly access scheme will require a more complex and costly design for the underground utilities in order to serve the property. Page 1 of 2 15668 West Valley Highway • Seattle, Washington 98188 Phone: (206) 255-4100 • Fax: (206) 255-0945 Cedar Knoll Subdivision October 12, 1993 In reference to the roadway alignment previously proposed, we have looked into shifting the street centerline Westerly to coincide with Fourth Avenue South. This alignment would provide a 32-foot right-of-way East and 5.42 feet West of the projected Fourth Avenue South center line. The roadway section proposed under this scheme will include a half-street improvements consisting of a 20-foot paved section, curb and gutter on both sides of the street, and a five-foot concrete sidewalks and 6.5 feet of planter/bio- filtration swale along one site of the street between the curb and the sidewalk. We request a meeting with you and/or Public Works to review this new concept before we submit the preliminary application and determine if this scheme would be acceptable. Should you desire additional information regarding this submittal, please feel free to call me. 'ncerely, Moun " " -Touma, P.E. Civil Engineer Attachments Page 2 of 2 • CITY OF / "` • (206)661-4000 \>� 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210 July 7, 1993 Mr. Tom Touma FILE 15668 West Valley Highway Seattle, WA 98188 RE: Pre-Application Review, Cedar Knoll Subdivision - PRE93-0029 Dear Mr. Touma: Thank you for attending the pre-application meeting on June 17, 1993, regarding your proposed ten lot subdivision at South 312th Street and Fourth Avenue South in Federal Way. The following is a summary of issues discussed at our meeting. For your convenience, I have listed comments in the following categories: zoning, public works, and water and sewer. A copy of the meeting attendance list is attached for your reference. Zoning The following issues relate to the Federal Way City Code (FWCC) and require resolution with the preliminary plat application. The lot is zoned RS 7.2 (7,200 square foot minimum lot size). Questions should be directed to me at 661-4110. 1. Application. A preliminary plat application and SEPA review are required. The combined preliminary plat and SEPA review filing fee is $4,057, payable at time of filing. Final plat filing fee (1993) is $560. 2. Open space. The FWCC requires you either set aside 15 percent of the site (approximately 15,282 square feet) or make a payment equal to 15 percent of the fair market value of the site to mitigate city open space impacts. Payment, if proposed, must be accompanied by a current appraisal statement prepared by a state certified appraiser, or another source acceptable to the city, to establish the fair market value of the property. f 1 _ Mr. Tom Touma July 7, 1993 Page 2 3. Significant trees. A significant tree inventory and tree retention plan must be provided with the preliminary plat application to determine whether or not replacement trees are required. Significant trees are defined as trees greater than 12 inch diameter measured 4.5 feet above the ground that are in good health and are not detrimental to the community. Replacement trees are defined as either 12 foot tall evergreen or 31/2 inch diameter deciduous. Red alder, cottonwood, poplar, and big leaf maple are not significant regardless of their size. 4. Environmentally sensitive areas. An analysis of environmentally sensitive areas, as defined by the FWCC, must be provided with the preliminary plat application. Specifically, if the wetland west of your site is within 100 feet of the proposed development it must be delineated and a wetland study provided with the preliminary plat application. 5. Lot area. Vehicle access tracts may not be included in lot area calculations. 6. Utilities. All new utilities must be provided underground. Public Works The following requirements were provided by the city's Public Works Department. Questions should be directed to Ron Garrow, Senior Development Engineer, at 661-4137. 1. You must provide a written narrative on the relevance to the subject site of the 7 Core and 12 Special Requirements of the 1990 King County Surface Water Design Manual (KCSWDM) and a Level 1 downstream analysis with the preliminary plat application. 2. Storm water runoff from the site must be controlled through the use of facilities designed and constructed in accordance with the requirements of the KCSWDM. These facilities will include, as a minimum, a detention pond, a biofiltration swale, and oil/water separators. The preliminary plat drawing prepared for the project should take into consideration the spacial requirements for these necessary facilities and shall depict their conceptual location. Any on-site facilities should be placed in a separate tract to be dedicated to the city for future maintenance. 3. The recommendations of the Hylebos Creek and Lower Puget Sound Basin Plan (Plan) shall be incorporated in the design of detention facilities for the proposed project. More particularly, the site is located in a portion of the Plan area designated for the Mr. Tom Touma July 7, 1993 Page 3 implementation of basinwide recommendation BW-2. This recommendation calls for the use of a 7-day storm event in sizing the detention facilities instead of the 24-hour event generally used in the KCSWDM. A 30 percent factor of safety need not be used in the design of the detention facility for this basinwide recommendation. 4. The Teabos depression, to which the runoff from the site drains, is a regional storage facility. If storage is to be provided in the depression for the development, storage will need to be created by either raising the level of storage in the depression or excavating within the depression for added volume. Consideration should be made with respect to the wetlands in the depression and the finish floor level of the neighboring residence. In either case, the release from the depression should not be increased above current rates. Conveyance to the depression from the site should be sized to accommodate a 25- year storm event. 5. Full width street improvements are required by the FWCC for the internal road to serve the proposed lots. Improvements shall include 28 feet of pavement, vertical curbs, gutters, four foot landscape strips, five foot sidewalks, and associated storm drainage facilities in accordance with the KCSWDM, all of which are to be installed on both sides of the centerline of the street right-of-way. The proposed alignment of Fourth Avenue South does not conform to the separation criteria for intersections. Further separation must be obtained to provide a minimum 150 feet. 6. You may request a modification, waiver, or deferment of the above street improvement requirements. Your written request should be sent to Ronald Garrow, Senior Development Engineer. The request must address and meet at least one of the four criteria listed in Section 22-1477 FWCC. Upon receipt of the request, it will be routed to appropriate staff for a determination and written decision. Submittal of a request does not assure the granting of any modification, waiver, or deferment. 7. Plans for the proposed improvements shall be drawn on 24" x 36" size sheets using a 1"=20' scale. Water and Sewer Federal Way Water and Sewer provided the enclosed memo for your information. Questions should be directed to Rick Gilmore, Supervisor of Technical Services, at 941-2288. Mr. Tom Touma July 7, 1993 Page 4 Summary Please be advised that this information is provided in response to the information which you presented for the meeting. As the project is redesigned or as more detailed information is prepared, there may be additional issues or concerns arise which were not covered at this meeting. I hope this information is helpful in the design of the project. A copy of the attendance roster is enclosed for your records. Feel free to call my office at 661-4110 at any time with questions regarding the proposal. Respectfully, Bill Kingman Associate Planner Enc: Meeting Attendance List Master Land Use Application Subdivision Submittal Requirements SEPA Checklist Procedure for Obtaining Mailing Labels Handout Major Steps for Process III Handout Section 22-1477 FWCC Water and Sewer Memo c: Ron Garrow, Senior Development Engineer Dick Mumma, Building Official Rick Gilmore, Supervisor of Technical Services, Federal Way Water and Sewer Pat Kettenring, Assistant to the Fire Marshal, King County Fire District#39 PRE9329.LT1 r CITY OF • vvFlY PUBLIC WORKS MEMORANDUM TO: Bill Kingman FROM: Ron Garrow For Your Information DATE: July 6, 1993 Respond By: SUBJECT: Touma Subdivision, PRE93-0029 The following comments are provided for the proposed subdivision: 1. The applicant will need to submit with the application a written narrative on the relevance to the subject site of the 7 Core and 12 Special Requirements of the 1990 King County Surface Water Design Manual (KCSWDM) and a Level 1 downstream analysis. 2. Storm water runoff from the site will need to be controlled through the use of facilities designed and constructed in accordance with the requirements of the KCSWDM. These facilities will include, as a minimum, a detention pond, a biofiltration swale, and oil/water separators. The preliminary plat drawing prepared for the project should take into consideration the spacial requirements for these necessary facilities and shall depict their conceptual location. Any on-site facilities should be placed in a separate tract to be dedicated to the City for future maintenance. 3. The recommendations of the Hylebos Creek and Lower Puget Sound Basin Plan shall be incorporated in the design of detention facilities for the proposed project. More particularly, the site is located in a portion of the Plan area designated for the implementation of basinwide recommendation BW-2. This recommendation calls for the use of a 7-day storm event in sizing the detention facilities instead of the 24-hour event generally used in the KCSWDM. A 30% factor of safety need not be used in the design of the detention facility for this basinwide recommendation. 4. The Teabos depression to which the runoff from the site drains is a regional storage facility. If storage is to be provided in the depression for the development, storage will need to be created by either raising the level of storage in the depression or excavating within the depression for added volume. Consideration should be made with respect to the wetlands in the depression and the finish floor level of the neighboring residence. In either case, the release from the depression should not be increased above current rates. Conveyance to the depression from the site should be sized to accommodate a 25- year storm event. M 'r, 5. The applicant will be required to construct full width street improvements for the internal road to serve the proposed lots. Improvements shall comply with the applicable sections of the Federal Way City Code for the classification of the road. Improvements shall include 28 feet of pavement, vertical curbs, gutters, landscape strips, sidewalks, and associated storm drainage facilities in accordance with the KCSWDM, all of which are to be installed on both sides of the centerline of the street right-of-way. The proposed alignment of 4th Ave. S. does not conform to the separation criteria for intersections. further separation will need to be made to provide a minimum 150 feet. 6. Per Section 22-1477 of the FWCC, the applicant may request in writing to Ronald Garrow, Senior Development Engineer, a modification, waiver, or deferment of the above street improvement requirements. The request must address and at least meet one of the 4 criteria listed in the section of code. Upon receipt of the request, it will be routed to appropriate staff for a determination and a response made to the request. A submittal of a request does not assure the granting of any modification, waiver or deferment. 7. Plans for the proposed improvements shall be drawn on 24"x36" size sheets using a 1"=20' scale. Federal Way Public Schools '4 P 31405 18th Avenue South Federal Way,WA 98003 941-0100 or 927-7420 SUPERINTENDENT G.Richard Harris EE BOARD OF EDUCATION RECEIVED BY Mary J.Weis,President COMMUNITY pyl OpMNT DEPARTMENT Orlando E.Trier,Vice President Effenus Henderson,Director Helen L.Pepper,Director June 10, 1993 J U N 2 3 1993 Gail.A Pierson,Director Mr. Bill Kingman City of Federal Way 33530 1st Way S Federal Way WA 98003 Dear Mr. Kingman, RE: Touma Subdivision at S 312th ST and 4th AV S The following information is to provide you with details about walking and bus routes which currently exist in this area. The attached maps indicate current bus stops in the vicinity of this development for Sacajawea and Nautilus. The neighborhood is within walking distance of Federal Way High School. The school district does not want to have to stop on 312th ST nor does it usually enter dead end cul-de-sacs. If we can be of further assistance please call Linda Becker at 941-0100, ext 254. Sincerely, Jake Walker Director, Planning & Facilities Federal Way School District 210 is an equal opportunity and affirmative action employer. The Affirmative Action Office number is 941-0100 FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DATE: 06/08/93 TO: Bill Kingman FROM: Matthew Long RE: Agenda for 06/17/93 meeting. Item #1: PROJECT NAME: Touma Subdivision. COMMENTS: No comments at this time. Cps rE 'ft-1 i 0 -- n2 E6zioc7/ 6( l 7( q..3, Pg-g- Q3-off q i1,4 „t.r6-tuf4N1 Pbr7, ar 6viikttutu rrr Pave2-0P,r4E-rr 6 6(4(10 go."/ /6/,c L 04s r`, (2/-9r3 -7 7/lathy Nl c vvy .fie u2 vices I- (7/U 7 di/T i//7G Y V I-OV lS sVoLDitu V' Deci 1 6 6/~4'/02c,R. `7t s7-r'rE t-trtz MArtui- .'s RA to - "1 z4 I -t W a SzA,se, of 4 l--L Z ffieo losti / D onx e- QGk.).14,L a .TS- c//v J Q \JJ' " N - O G O to, - /'C. • 10 6 ``i y° r o° �' Ala gJ..34 pe e O 'h‘ n 7 �� s* R..f• 6 ��o W ie.13. 1113E-4t-11W I1o.00 • e ,01: tv a `':e W 105 -4 " N j R'n 103 " M 102 n E a\ Yt\\p n.la Na' •&' r 'JI G g m e' , \\` 'zed `1'"` i `.. .ye 3 0 pa;b~ a tA \\ a . a e, 9*10 Noy • ?o �^` 1 y pe a>z W ,',� �' � '•a;'s 10 400 8 ' 101 + 14, • e r*e• 6t \ Z 7 bn �, 'Ot: 'b M ,'3`M 1O1e e x T 4 O'er '� h+,r" ` V 90.01 t \� o ti \ 33 t, � r S6 1 IppO ti 3 B 0q9 1 v - �N r ° �. �' iG5 'qIL ' )� ,1� ::° ,397 S 98° 6f '3 O71�o r '�1298rA aw: " 51 V \ \0 9 3, S. y6 1 I o• ( 3 a° R'zs 23 , ,y.t, c _ •4 6 e • elAc 6� r eon r r � crs 1 ,bs - �a�X'a ° ° Pc 6. s AG• tri n iS ^ �, In Isi Zc�0' /45 n pti n 00 ---;6s— - N P� q tx K vif9 r 151 2- 0 '3.5' I 4)1 1 72 . - m aSl 1 � NIN1N I I N o <9 I 2•3 p 19• 1 fig 7s:je j ;' /3 5 oo g646030359-12' �$605150919 =lei_:Q7031 0453 •49507250464-/2' aG 0 ESf�B '�" �. C. -. /is/. .lO-N Z/J c� P ��— __________ N. a9-.33-37E."26.79. 4-r 4W N.89-56—OSW. SW. .8 —2 I —4 Avow. ,s ,77Q,17 ,'s 647.5e.,:y City of Federal Way Department of Community Development Memorandum TO: File FROM: Bill Kingmarve RE: Preapplication, Cedar Knoll Subdivision, PRE93-0029 DATE: June 1, 1993 I have reviewed the conceptual 'drawings for division of one 2 . 34 acre residential lot into ten lots at South 312th Street and 4th Avenue South (if extended) . Certain planning issues, listed below, must be resolved with the preliminary plat application. The site zoning is RS 7.2 . Minimum lot size is 7, 200 square feet. ISSUES 1. A preliminary plat application and SEPA review are required. The combined preliminary plat and SEPA review filing fee is $4, 057, payable at time of filing. Final plat filing fee is $560. 2 . The applicant must either set aside 15% of the site (15,282 sq. ft. ) or make a payment equal to 15% of the fair market value of the 2 . 34 acre site. Payment, if proposed, must be accompanied by an appraisal statement to establish the market value of the property. (yc,c_ '0263 C 14U14-60 3 . A significant tree inventory and analysis of environmentally sensitive areas, as defined by the FWCC, must be provided with the preliminary plat application. W 6(05 pfFC• 4 . All new utilities must be provided underground. SUBDIVISION CODE CONFORMANCE REVIEW All lots resulting from the subdivision must conform to the design standards of this ordinance (Section 20, FWCC) . The criteria are listed below. Subdivision design, Sec. 20-151. ok. Lot design, Sec. 20-152 . ok. Density, Sec. 20-153 . ok . Cluster, Sec. 20-154 . n/a. Open space and recreation, Sec. 20-155. The applicant must either set aside 15% of the site or make a payment equal to that amount. Pedestrian an bicycle access, Sec. 20-156. ok. View considerations, Sec. 20-157. No views will be affected with this application. Required improvements, Sec. 20-176. Street improvements will be required. See Public Works comments. Density regulations, Sec. 20-177 . ok. Buffers, Sec. 20-178 . ok. None required. Retention of vegetation, Sec. 20-179 . Significant vegetation will be removed for only preliminary plat construction. Streets and ROW' s, Sec 20-180. See Public Works memo. Water, Sec. 20-181 and Sewage Disposal, Sec. 20-182 . See Federal Way Water and Sewer memo. Storm Drainage, Sec 20-183 . See Public Works comments. Other utilities, Sec. 20-184 . Must be provided underground. Street Lighting, Sec. 20-185. Street lights are optional, at owners request to FWWS. Landscaping protection and enhancement, Sec. 20-186. n/a. PRE9329.ME2 2 COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: June 3 , 1993 ATTN: Bill Kingman Associate Planner FROM: Federal Way Water and Sewer SUBJECT: Agenda Item No. 6 - Touma Subdivision/South 312th and 4th Avenue South -- Preapplicaiton Meeting with Staff COMMENTS: Water: Water facilities are available to the proposed plat but will require extension of mainline facilities to serve the plat . This will require looping to the new plat to the north of the proposed plat or some hydraulically acceptable alternative. A developer extension agreement ( DE) with the District will be required. Sewer: Sewer service will require extension of off-site sewers to the proposed plat. Topographic information will be required to determine the direction from which sewer will be extended. A DE agreement will be required, and a joint DE agreement may be entered into with the District. nnecti to he spy tem Pa woo Cal o us , t he no thwest of this roose pla . , ca not unt ' 1 t e ist ict ha accept d the w sy tem i that plat. Ho eve nne ion t the s tem in 5th , ay So th c ld ma a th 's ti e, by ain ex nsion, if to .ogra hic for tion is favorable for t at alte native. By: K.(q Date: - 3 CITY OF FEDERAL WAY DEVELOPMENT REVIEW COMMITTEE DEPARTMENT OF COMMUNITY DEVELOPMENT DATE: May 27, 1993 TO: Community Development Review Committee (CDRC) Members Kathy McClung, Land Use Administrator Ron Garrow, Senior Development Engineer Dick Mumma, Building Official Rick Gilmore, Supervisor of Technical Services, FW Water and Sewer Pat Kettenring, Assistant to the Fire Marshal, KC Fire District #39 Linda Becker, FW School District #210 Tina Piety, Administrative Assistant FROM: Bill Kingman, Associate Planner PROJECT PLANNER: Bill Kingman PHONE: 661-4110 PLEASE RESPOND BY: June 3, 1993 ********************************************************************** FILE: PRE93-0029 PROJECT NAME: Touma Subdivision PROJECT ADDRESS: South 312th Street and 4th Avenue South PROJECT DESCRIPTION: Divide one 2.43 acre residential lot into ten lots. APPLICANT: Tom Touma, 15668 West Valley Highway, Seattle, WA 98188 PHONE: 255-4100 SEPA: SEPA will be required. NOTE: The preapplication meeting with the applicant will be at 10:00 am Thursday, June 10, 1993. PRE9329.MEI / FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DATE: 06/08/93 TO: Bill Kingman FROM: Matthew Long RE: Agenda for 06/10/93 meeting. Item #1: PROJECT NAME: Touma Subdivision. COMMENTS: No comments at this time. a a COMM i. WI 1 0E :j Federal Way Public Schools `i 31405 18th Avenue South Federal Way,WA 98003 941-0100 or 927-7420 SUPERINTENDENT G.Richard Harris BOARD OF EDUCATION June 8, 1993 Mary J.Weis,President Orlando B.Trier,Vice President Bffenus Henderson,Director Helen L Pepper,Director Gail.A Pierson,Director Bill Kingman, Associate Planner City of Federal Way 33530- 1st Way South Federal Way, WA 98003 RE: Touma Subdivision Dear Mr. Kingman: This letter is in response to your request for comments on the 10 lot subdivision known as Touma Subdivision. The Federal Way School District is concerned with the overcrowding of school facilities, safety of children who walk to school, transportation of children, and recreational requirements of children. We feel it is our responsibility to provide the best education possible for all children who reside within the District. To do this, however, we must give consideration to the impact new housing developments and new students have on the District. Additional students means that provisions must be made for their educational needs including issues such as public health, safety and welfare, streets or roads, parks and recreation, and safe walking conditions. The result is that schools are required to: • Construct new schools or additions to schools to house the new students. There may also be a need to obtain temporary facilities until the permanent facilities can be built. • Provide additional buses and/or personnel to handle safe passage for the students from their home to the schools. This includes developers designing loading and unloading areas adjacent to service streets and/or assuring safe sidewalks with accessible routes to the local schools or bus stops. • Purchase additional equipment such as desks, chairs, computers, library collections, physical education equipment, etc. • Provide additional playfield space and equipment. On May 10, 1993, a revised Capital Facilities Plan was adopted by the Federal Way School District Board of Education. This plan is in accordance with the requirements of State House Bill 2929 (State of Washington Growth Management Act). The purpose is to assure the appropriate facilities are in place to educate the increasing number of students in this District. Statistical analysis of your project projects 7 students would enter our school system from the proposed 10 single family households in this development. The Capital Facilities Plan includes construction bonds and collection of impact fees along with state matching funds to finance the impacts of new growth from new housing developments. Federal Way School District 210 is an equal opportunity and affirmative action employer. The Affirmative Action Office number is 941-0100 c . Bill Kingman June 8, 1993 'Page 2 In summary, permanent school facilities will be needed to accommodate the proposed growth that this development represents. This District has determined that it will finance these facilities by using a combination of construction bonds, impact fees and state matching funds. Sincer: Donn B. Fountain Assistant Superintendent DBF:re c: Board of Education Dick Harris Jake Walker #82 CITY OF FEDERAL WAY DEVELOPMENT REVIEW COMMITTEE DEPARTMENT OF COMMUNITY DEVELOPMENT DATE: May 27, 1993 TO: Community Development Review Committee (CDRC) Members Kathy McClung, Land Use Administrator Ron Garrow, Senior Development Engineer Dick Mumma, Building Official Rick Gilmore, Supervisor of Technical Services, FW Water and Sewer Pat Kettenring, Assistant to the Fire Marshal, KC Fire District #39 Linda Becker, FW School District #210 Tina Piety, Administrative Assistant FROM: Bill Kingman, Associate Planner PROJECT PLANNER: Bill Kingman PHONE: 661-4110 PLEASE RESPOND BY: June 3, 1993 ************************************ :********************************* FILE: PRE93-0029 PROJECT NAME: Touma Subdivision/ PROJECT ADDRESS: South 312th Street and 4th Avenue South PROJECT DESCRIPTION: Divide one 2.43 acre residential lot into ten lots. APPLICANT: Tom Touma, 15668 West Valley Highway, Seattle, WA 98188 PHONE: 255-4100 SEPA: SEPA will be required. NOTE: The preapplication meeting with the applicant will be at 10:00 am Thursday, June 10, 1993. PRE9329.MEI � /f\ �,L CITY OF t""' ` • FI—.11 r-K --,.%_._ DEPARTMENT OF CuAllklUNITY DEVELOPMENT vV FIN' STER LAND USE APPLICATION APPLICATION NO. Pfetc 3-00-29 Date 519y !9 93 , Agent Gi i Name of Applicant / t 11;7 /D v rnc.-- Owner Address 5��� �/A/�y l ), Phone ' - g/o(D Signature e-.�.A. .c� -,� SL. .�.„- Property Location s 3/2' g'h-e.-/ ' y c I' Kroll 715/ W Zone RS 70 Legal Description TG. 57 /S.ems L � 6, ��2� t. 4.49 Ad isso/a,„ ) Project Description /0- ,LoI 3,..24 Jc v f s ed.� Parcel Number(s): Dg,v/O5'1DS 2' Type of Permit Required: SEPA Notice Sign - — `J/Lc —/972/vele4-7 o'✓ Checklist Mailed Board - Site Plan Review R R * —Land Surface Modification R R * ` Boundary Line Adjustment Binding Site Plan R R R Short Subdivision * * * Subdivision R R R Shoreline R R * Variance R R R Conditional Use R R R Use - Process I R R * Use - Process li R R R Use - Process III R R R Quasi-Judicial Rezone R R R Variance R* R R Comp. Plan/Rezone R R Annexation R R C,(jh MUNfTY DEVELCPMrN T DEPAPTN ENT Lot Line Elimination R = Required * = Optional by City MAY 2 4 1993 MAS 1 LkLA.}kM 33530 1ST WAY SOUTH • FEDERAL WAY, WASHINGTON 98003 • (206)-661-4000 Recycled Paper .. ... _ ,.,N. a •w m :N:n -..' 2 •• _•.•:.ZI:'wv-55'A4iF'fEFFs 3k"`.i,'xT'?:5u'.AR9473Tuk:rnSTs 'd.^&,:ei4:..°'::TZP.Ffi1RP.°LS'EhA�m&.i'.ltT".7 ...,--.1:43`.i#:;...?.i�:L4:F'A:a'.€i7!'w3:e7t.'3?+7k:'ri 543Zie`:77:/iF�'F'Y3RE.TS�wv:"5E=0..3t�d'MA*.t'.h: ,'.1"G.'-'tu'.3T.9`�as7%t;t x� r. r�xmv. r «t sip r .., ccx : an �a>�as apt µn�nmeaa s € �:raa �_ ;: �r�vk. c ,» a a s .r. r... ..., r a_ ---_._._ . — ... ,. ,.:.:k..-�unt'Z.�ats ^,*re.':�,z—iz.cie::^r,._:.. F..:.,ne;.,,-::;..'r^a•-;�a..^r!c..w>w.r a.::<...... _..s>.,....., v..,.-,..,a..a...,�................�..,.,,...v......a,..w�'eak,.,*....� ,u_u...� .,r..v: ..,w,. / af�f iN• XX E 1. oed !� �. 0 ' ./� t�:l • 1196 ® r f a % L_. s 1 • • 0 4_ i 52. 00' 20' 0. 50' I.27o s 5 �.�" TFIICK � I V7HROUGH �--r�la-F/L ,AT�oN s�o��tE GRA1/EL SHOULDER � cu r� DRAINAGE 20' O.C. MIN. CCI,9PAC7ED L)EPTH CLASS "B" ASPHALT CONCRETE MIN. COMPACTED .)E'PTH CRUSHED SURFACING BASE COURSEE, d e C" )WN. COh,PACTE.D :)..DTN CLASS 'B" G,`;AVEL OR DASH POINT SUITABLE NATIVE W, TERIAL. S 301:'TH ST N. T. S. I I S312THST AA / I � 'dlRRfJR ZONE: R7.2 N.iL 233 - �L 227 -,, i TL 25J J� -7- -" TL 2.30;_- �- X/ 40N. S r�1,VA - - _ 1 ' ' JbiI QU1,V Tr'C�l ` `�lE `'A LURED UNZ, I i1G- - ` , ,- TL 209 / - , ` - ti LONG RICHARD ' KE � j" ;VfARfCI,� I 1 .1 t30030 5 TH v1 v Y S ` � � . 102 'TH A VE, S .� 17 t9, 51 t-I A VL S -�, � ARr�lIE 1�l LEER j / \ / �� -, ��� v .S 1119 S.TR A l/E o DEAL WA Y t FM EcMA� A � � .� FEDL_h�i�.� A , 1 FED- WAY � :� 1 `l � � STN, -A l/F 5 10914 GREENDALE DR / ,- .�` _ i _ _ _ _ _ ► - TA COMA, WA 98498 FEDERAL-- WAY ---------"" ; I i A F 8 \ r /gyp �_,�.. ) n � �}�^, y'btx�-�avae^cv� eve: "aeiAma� m� � > ,:va-..,v .c._:exmmcrna.+-.�n�� m�. a ...-,.�'., , vmw.wae.-:#., i , 65 -------------- %N C� N, 7,246 .^iq.1t. 7 rl i �Z2'ta sq. f{. \ �— `� \ I\ `\ I I �\ ( __ i �( —_sFTQ _ --- !< IN w 7,271 sq,ft. - TL 75 ( PARKWOOD CAMPUS .4 � KA M RAN F_ 1\I TERPRISE S L TD �� TA S+ S01 VANCOU VER, 5'C V661 L 3 ZONE RS 7.2 ZONE: f� 1.2 _ LESLIE RODER73 _ - FEE 'ERA L V✓AY - - --- U PL� T TE�J rLD R{�L _V AV----' _ - ; I L _yl 1 THAT PORTION OF TF IE NORTH 11�EST QUAR TLR OF TL/E S� CTION 8, TO MI NSFI/P 21 NORTH, RANGE 4 EAST, KING COUNTY, WASHINGIOIV, DESCRIBED AS FOLLOWS' TIVE ✓VEST 165 FEET OF THE EAST 665. 41 FEET OF THE NORTH 6,30 FEET OF TIIE SOUT'-1 660 FEET OF THE WEST THREE—QUARTER OF THE NORTH111IEST QUARTET-,' OF SAID SECTION 8; LESS COUNTRY STREET: 400 TL }5 G. R HANSEN T �41 I VMIX11 s'' MAP I PLATTING` DATA A EXISTING ZONY/NG: RS Z 2 AREA OF PROPERTY 2.34 ACRES NUMBER OF LOTS. • 10 LOTS VIA TER SUPPL','.• FEDERAL WAY WATER DISC TICT SEWER SUPPL';' FEDERAL WAY SEWER DISTRICT SCHOOL DISTRICT- NO. 210 FEDERAL WAY FIRE DISTRICT.' NO. 39 - KING COUNTY P0VIER: PUGET SOUND POWER & LIGHT CO. TELEPHONE.- US WEST GAS.- WASHINGTON NATURAL GAS CO. PLAT ROAD: CO-Y OF FEDERAL WAY STANDARDS LOT DIMENSIOPS ARE SUBJECT TO FINAL PLAT CALCULATIONS CONTOURS AR:- BASED ON KCAS DATUM. VEGETATION: TOTAL AREA OF SITE IS MODERATE TO HEAVY COVER ;WITH EVERGREEN, MAPLE AND ALDER TREES GRADING: vi`' ir?I,"?v ✓!'�!. tjE PR OPO.:>E,u FOR CvN3 5TUCTi`O O STREETS AND HOWES. DEVELOPEP,: NIZAR A. SA 1'ANI PO EOX 2j245 FEDENAL WAY W,4. 98093 PHONE.1-206-8JB-9606 1 ENGINEER: TOUMA ENGINEERS 15663 VR VALLEY HWY SEA TTLE, WA 98188 PHONE 1-206-255-4100 SURVEYOR: KENNETH J. OYLER 15668 W VALLEY HV✓Y SEA TTLE, WA 98188 RECEIVED Ell' 42' 42' PHONE 1-206-255-4100 DOMMUMTY DEVELOPMENT DEPARTMENT � I OCT 2 0 1993 r N }!aa DESCRIPTION/DATE ;DY; Q) j41 w i 1 1V'1 � !. 5 U e _ 14 II..'' W Q 3 � � N O y_a I V Q' sa ' 1 f J L'S \.,�i� fa ,f 7F w 108 NO. 614-010-931 A ; :DESIGNED MT DRAWN MT/DT COMP. GJS �'CFIECKED KEA1 OYLER DATE fr1ARCH 1991 D! NO. 51410PP2 !OF I SFIEET.- ¢