Loading...
22-104097City of Federal Way Community Development Dept 33325 Sth Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 60 Project Address: 30322 19TH AVE S Building - Single Family Permit #:22-104097-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 952651 0600 Project Description: BLUEBEAM - Construction of a 2335 square foot 2-story single family residence with a 90 square foot covered entry and a 395 square foot garage. Includes plumbing and mechanical. Owner Applicant Contractor Lender SSHI LLC DBA D R HORTON JESS BOSANCUD R HORTON D R HORTON OWNER IS LENDER 11241 SLATER AVE NE SUITE 12C 11241 SLATER AVE NE SUITE 120 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 KIRKLAND WA 98033 KIRKLAND WA 98033 Census Category: 101 - New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: T_vne V - B Occupancy Load: Floor Area (sq. ft.) 2,425.00 Additional Permit Information New / Additional Sq. Feet - Ist Floor ..................... 945 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage....... ................. 395 Plumbing Work Valuation? ..................................... 20000 Number of Stories ................................................... 2 Plumbing to be Included? ........................................ Yes Will Certificate of Occupancy be Issued? ............... Yes Comprehensive Plan Designation ........................... SF - High -Density Residential Total Valuation: 319,196.05 Fans 6 Furnaces Gas Pipe Outlets 2 Bathtubs 2 Dishwashers Lavatories 4 Showers Water Closets 3 Water Heaters New / Additional Sq. Feet - 2nd Floor .................... 1390 Occupancy #1 - Area (Sq. Feet) .............................. 2425 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck ........................... 0 Mechanical"to be Included? ..................................... Yes Mechanical Work Valuation? .................................. 20000 New / Additional Sq. Feet - Other ........................... 90 New / Additional Sq. Feet - Total ........................... 2820 Occupancy #1 - Use ................................................ Residence (1 or 2 family) Zoning Designation .................................................. RS 5.0 1 Gas Piping 1 Laundry Washer Outlets 1 2 Sinks 1 1 Hose Bibbs 2 PERMIT EXPIRES Tuesday, 16 May, 2023 Permit Issued on Thursday, November 17, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of WashFiL e..ity of Federal Way - Owner Owner or agent: ., Date: Cityof Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: THE WOODLANDS AT REDONDO CREEK LOT Permit 9 22-104097-00-SF Address: 30322 19TH AVE S Includes: # 1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 2,425.00 Owner Name: SSHI LLC DBA D R HORTON Owner Address: 11241 SLATER AVE NE SUITE 120 RKLAND WA 98033 Buildil k Official 112 L, Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises -111111;k CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 104097 00 Address: 30322 19TH AVE S Project: D R HORTON FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. . SWM Precon Site Mtg (4400) El Site Assessment (Erosion) (4365) 0 Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date rf/ 15 C�L 0 Foundation Wall (4115) ❑5 tnage/Downspout (4040) © Plumbing Groundwork (4190) Approved -to place concrete ,,D❑r 1 evLr Approved to backfill I��-(',�/+� Approved to cover :\e 11 ByTO Date 17N 7i� By � Date 2 �� Z� ByDate V 0 Slab/Concrete Floor (4255) 0 Underfloor Framing (4285) 0 Approved to place concrete Approved to sheath floor By Date By Date -1 5 Z By '• 6 Shear Walls (4245) 11 Roof Sheathing (4220) 12 Approved to install siding Approved to install roofing By a Date ` `'i/ By Date ?r o 3 By 13 Mechanical Rough -in (4165) 114 Gas Piping (4125) l ] Approved Approved to release tes By 4g3 Date 7-hla By d4iDate 3 t By 1 Interim Erosion Control (4370)EElectrical, scheduling a Framing inspection; 17 Approved Plumbing & Mechanical Rough -in raft Stop inspections must be signed - By Date f and approved. IBC 109.3.4 By Floor Sheathing (4105) Approved to install iloorin! Date Rough Plumbing (4230) Approved Date 2 3 Fire/Draft Stops (4095) Approved Date Framing (4120) Approved to insulate 0 Date Z/cA ° Insulation (4150) 19 Gypsum Wallboard Nailing (4130) �4 Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved By Date �/ % By Date �/ �� ?/ By Date 21 Final - Mechanical (4065) 22 Final - Plumbing (4075) 23 Final - Building (4050) Approved Approved Approved By Date By r,7 �i! Date bl���3 BY] Date 2 ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date CITY OF Building Division 33325 Eighth Avenue South Federal Wa Federal Way, x 98003-6325 Phone 253-835-2607 Fax 253-35-609 CORRECTION NOTICE r?'? - ADDRESS: 30SZ2, �� �� �- PERMIT#: 9( Ca�� --c k� r "�� bloi^l t'nA k kDSfA, v"") c.,,ot.041\1 fleeQ.,�o 4qc,3r —A/. tIIn3-\ IF YOU HAVE QUESTIONS CALL (253) 835- 1621-7-1 WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) �5-305�OFOIR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE Sd INSPECTOR DO NOT REMOVE THIS NOTICE Page of CITY OF Building Division 33325 Eighth Avenue South Federal Way Federal Way, 98003-6325 VA�:�Phone 253-835-2607 Faxx 253-835835-2609 CORRECTION NOTICE ADDRESS: 2JOZJZZ Iq01 /NQ - S, PERMIT#: ZZ IONd9 r -o (9 IF YOU HAVE QUESTIONS CALL (253) 835- Z� Z 3- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE 70 INSPECTOR DO NOT REMOVE THIS NOTICE Page of