10-100330 (2)CITY of � Federal Way CITY HALL FiLE 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Mr. Edi Linardic March 16, 2010 LDG Architects 1319 Dexter Avenue, Suite 245 Seattle; WA 98109 RE: FILE #10-100330-UP; THE PINK SPOT CAFR - COMPLETE APPLICATION AND ADDITIONAL INFORMATION REQUESTED, 27525 PACIFIC HIGHWAY SOUTH, FEDERAL WAY Dear Mr. Linardic: The City has received a Process I application for exterior changes and use of the former bank drive through building as a new restaurant. Door, window, and ramp changes are proposed to establish the Pink Spot Cafe business. The Process I application was submitted on January 26, 2010, is determined to be complete. Specifically, this Process I application is only for reuse of the existing bank building as a new cafe. In the March 16, 2010, comment letter for the Pac Plaza Redevelopment, the City noted that the proposed "Phase P' project, which was re -use of the existing bank building as a fast food restaurant together with the addition of a catering truck/fast food restaurant, did meet the Federal Way Revised Code (FWRC) definition of a change -of - use (FWRC 19.05.040) due to increase in the hours of operation, increase in required parking, and changes to traffic generation. Traffic comments are copied here. Due to the increased impacts, the Phase I application that includes the catering truck requires Process II review. However, the building reuse concept requires only a Process I land use application. Additional Information Requested The following information must be provided prior to issuance of Process I approval for the new cafe: 1. Customer access to the restroom is proposed via a new exterior door to be installed on the north side of the building. Access to this doorway is via a ramp that ends in the planter area. There is no way for customers to re-enter the building or the parking lot without going through the planter area. Further, this ramp blocks the pedestrian access to the main building entrance from the north. Revise the plan to provide unimpeded pedestrian access to and from this ramp. Consider wrapping it around the building instead of into the planter area. Depict accessible routes of travel for the ramps as well. 2. Identify each entry landing area on the site plan. 3_ Document what will occur under the canopy areas that are not used for coffee pickup_ Will there be seating. will it be available for covered parking, etc.? Please be advised that the building permit application #10-100360-CO is under review. A City Business License will be required as well as applicable permits from the Health Department. Please note that if the catering truck is still proposed for this site, additional land use review process and fees will be required. I can be reached at 253-835-2642 should you have any questions about this letter. Sincerely, Deb Barker Senior Planner c: Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Traffic Analyst Scott Sproul, Assistant Building Official Doc l D 53286 4CITY OF s. Federal Way April 13, 2010 Edi Linardic LDG Architects 1319 Dexter Avenue North, Suite 245 Seattle, WA 98109 CITY HALL L 7-ii 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com RE: FILE #10-100330-00-UP; DIRECTOR'S DECISION Pink Spot Cafe, 27525 Pacific Highway South, Federal Way, WA Dear Mr. Linardic: The City has completed Process I review and hereby approves the application for exterior changes and re- use of the former bank drive -through building as a fast food restaurant. Zoning for the site is Community Business (BC) and fast food restaurant uses are permitted within the BC zoning district pursuant to Federal Way Revised Code (FWRC) 19.19.220.020, "Entertainment - Generally." A Process I application was submitted on January 26, 2010. Door, window, and access ramp additions are proposed to the east and west facades of the existing building to establish the Pink Spot Cafe. The existing parking adjacent to the building will be modified in order to meet current ADA standards. One lane under the existing drive -through canopy will be used as a food delivery/pick-up window, the balance of the area under the canopy will include planters and minimal seating. No vehicle parking will be permitted under the canopy. The proposed facade changes do not reduce required parking, landscaping, buffering, open space, or public areas; does not change the location of utilities or easements; maintains pedestrian connections; is consistent with the approved architectural design of the site; and creates no impacts to sensitive areas or significant trees. Based on the City's review, the Process I application for proposed door, window, and access ramp additions along with reuse of the former bank as a fast food restaurant is administratively approved. Building permit #10-100360-CO is under review for the proposed improvements. This decision shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this project site. The effective date of decision is April 16, 2010, or three days from the date of this letter. Pursuant to FWRC 19.55.050(1), any person who received notice of the administrative decision may appeal this decision to the Federal Way Hearing Examiner by April 30, 2010 (14 days from the effective date of decision). In that you are the only party of record, you may waive your right to appeal by submitting a letter to this effect to the City of Federal Way, Department of Community Development Services. If you waive your right to appeal, you may begin work on April 19, 2010, PROVIDING you have obtained the necessary building permits. Mr. i_in:rraje April 1?, "t010 Page 2 Additional Process I hourly fees in the amount of $118.50 (1.50 hours at $79.00/hour) are now due and must be paid before the building permit will be issued. Please use the enclosed invoice with any payment. If you have any questions, please call Senior Planner Deb Barker at 253-835-2642. �Ln�c Gr Fe wr1 lrec (JG Community Devel #Services enc: Approved site plan (A 1.0) and elevations (A-2.0) prepared by LDG Architects, dated March 31, 2010 Invoice c: Deb Barker, Senior Planner Scott Sproul, Assistant Building Official 10-100330 Doc. LD 53603 CITY OF L Federal Way March 17, 2010 Edi Linardic LDG Architect 1319 Dexter Avenue North, Suite 245 Seattle, WA 98109. FiLE CITY HALL 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com RE: File #10-100330-00-UP; PINK SPOT CAFE, Forward Lakehaven Comments Dear Mr. Linardic: Enclosed please find comments dated March 16, 2010, from Brian Asbury with Lakehaven Utility District for the proposed Pink Spot Cafe. Mr. Asbury can be reached at 253-946-5407 or at basbury@lakehaven.org should you have any questions about this memo. Sincerely, r-- Deb Barker Senior Planner Enclosure as noted c: Brian Asbury, Lakehaven Utility District Doc. LD.53334 LINARDIC DESIGN GROUP 1319 DEXTER AVE. N. r SUITE 260 SEATTLE, WA 98109 TELEPHONE 205-283.4764 FAX 206-283-1293 April 14, 2010 Deb Barker City of Federal Way 33530 1" Way So Federal Way, WA 98063 RE: The Pink Spot Cafe 27525 Pacific highway South Proj # 10-100330-UP Dear Deb, RECL':1-VED APR .14 QrY C)p FEDERA L CDs wA Y We formally waive the right to appeal the 14 day appeal period normally required for this Process 1 Review of the above noted project. If there are any questions please do not hesitate to call. Sincerely, Linardi esign Group/Architects di Linardic EL:lb Deb Barker From: Mike Baily [mike@Idgarchitects.com] Sent: Monday, April 12, 2010 2:53 PM To: Deb Barker Subject: RE: Pac Plaza - Pink Spot Cafe #10-100330-UP Attachments: proposed ramp.pdf; Existing westelev.pdf; ramp.pdf Hello Deb, Find attached photographs of the existing ramp and what the proposed ramp would look like. As you can see there is an existing concrete walkway that connects building entry to the handicap ramp and to the striped walkway that leads to the sidewalk located in the ROW (Existing westelev.pdf . Due to reconfiguration of the existing building (public toilet cannot be accessed thru a kitchen area) we had to provide access to the toilet by means of an outside walkway. In order to provide access to the toilet we are proposing to raise the existing walkway so that it would be at the same level as the existing entry landing and as the walkway continuous to the north we are proposing a ramp down that will connect to the striped walkway. We are also proposing a new ramp from the existing main entry landing that would provide HC access to the existing parking stall. Based on my interpretation of building code the proposed ramp/ walkway will meet the requirements of accessibility code. Let me know if this proposal meets your approval and if not maybe you can let us know what needs to be altered in order to meet your approval. As you know we have been working on this for last 5-6 months and the tenant is anxious to open for business as soon as possible. If you think we should meet to address any last issues you might have I would be happy to meet with you. We are also ready to submit for a building permit for the catering truck. Per an e-mail from Sarady this use will not add traffic trips and per process II application that we had submitted it is my understanding that we have addressed other issues such as use, parking and landscape requirements. I'm assuming that letter date March 16, 2010 is for process I (10-100330) and that process II application is still under review and possible further comments might follow. In either case can you let me know if we can apply for a building permit or do we have to wait until process II is complete? Thank you Mike Baily LDG Architects 206 283 4764 -----Original Message ----- From: Deb Barker [mailto:Deb.Barker@cityoffederalway.com] Sent: Wednesday, April 07, 2010 4:43 PM To: 'Mike Baily' Subject: RE: Pac Plaza - Pink Spot Cafe #10-100330-UP Mike - I did route the Pink Spot resubmittal to the review team, including the building department. I can let you know that the ramp access to the restroom through the planter island won't work for ADA accessibility. Either enlarge the sidewalk so that there a paved route to get back to the accessible stalls without going into the drive aisle OR relocate the ramp. I will put this formally in writing to you later this week; I'm on deadline for a couple of items ahead of Pink Spot right now. Regards Deb Barker, Senior Planner City of Federal Way 33325 8th Avenue South, PO Box 9718 Federal Way, WA 98063-9718 253-835-2642 (p) 253-835-2609 (f) dej).-)�t:i'�{r`i°'Sti;:E:STlY fi`[=i`i:'t3�wa cw -----Original Message ----- From: Mike Baily[mailto:mike@ldgarchit.ects.com] Sent: Wednesday, April 07, 2010 4:09 PM To: Deb Barker Subject: Pac Plaza - Pink Spot Cafe #10-100330-UP Hello Deb, I hope you are doing well. We are hopeful that you find our access solution acceptable, we are struggling with our tenant a little bit on account of the timeline to move into the space. I know that you cannot give me a finite date but would you be able to tell me how your timeline is going along? Thank you Mike Baily LDG Architects 206 283 4764 >N • �i E R ' t ,, •� �I i ALK PATH WITH - - - gERLAY RAMP SLOPE NOT - -_ 1 :20 (STING WHEEL ASPHA! -)TALL DING NLT RAMP WHEEL STOP ED IANDRAIL- -- - �.. EXISTING BLDG � - EL 324.9 XTERIOR LEV 324.9 _ -' UN ER THIS RMIT aLT WALK LANTE.R I EL 324.9 HP CANOPY OVER �L CONCRETE PAD 1EMENT JDSCAPE PLANTER—` ASPHALT PAVING zz EXIS1 EXIST 195.23' s" D• •co N 88037' 00 ' W EXISTING TR ACT u ca C� E m cm L O O CLC O i G C M .� W C N a n o qOL c a US �a a cn 0 'Y MEMORANDUM Community Development Services Department DATE: April 6, 2010 TO: Kevin Peterson Sarady Long Scott Sproul Chris Ingham FROM: Deb Barker SUBJECT: Route Revisions, PINK SPOT CAFE - (10-100330-00-UP) 27525 PACIFIC HWY S REPLY BY: April 15, 2010 Attached please find revisions to the Pink Spot Cafe project. The applicant is proposing for the ramp from the restroom to end in the landscape planter. I don't believe that we can approve this. Also, this process I application is ONLY for the Pink Spot Cafe. No other uses are permitted with this permit. Please TRACT YOUR TIME IN AMANDA. Thanks LDG LINARDIC DESIGN GROUP 1319 DEXTER AVE. N. A SUITE 260 SEATTLE, WA 98109 TELEPHONE 206-283-4764 FAX 206-283-1293 March 31, 2009 Deb Barker City of Federal Way 33530 1 5t Way So Federal Way, WA 98063 RE: The Pink Spot Cafe 27525 Pacific highway South Proj # 10-100330-UP Dear Deb, wo APR 0 12010 CITY OF F_ BU1LDI D(3E p . WAY Enclosed are the corrections you requested for the above mentioned project per your comments dated March 16 2010. 1. The access ramps have been revised. Please note that the original proposed ramp lies atop an existing conc walk which provides site access to the public way. The original design proposed a ramp access that stopped at the new rest room door, we have revised this ramp to extend all the way to the building access by raising the existing walking surface to the next landing for the building access. An additional ramp is provide from the ADA parking stall to the building entrance. 2. Please see sheet A-2.0 for landing designations 3. The additional area under the canopy not used for the drive thru portion of the project will be provided with seasonal planters and no vehicular access will be allowed. Some minimal seating may be present depending on the tenant If there are any questions please do not hesitate to call. Sincerely, Linardic Design GrouplArchitects "/ zl-�� Edi Linardic EL:Ib MEMORANDUM Public Works Department DATE: March 22, 2010 TO: Deb Barker FROM: Sarady Long SUBJECT: PINK SPOT CAFE - (10-100330-00-UP) 27525 PACIFIC H WY S The submitted materials submitted on March 12, 2010 have been reviewed by the Public Works Traffic Division. The following are technical comments that should be addressed: 1. The proposal to convert the existing drive -through bank building (760 so into a Coffee/Donut shop with drive -through will not generate any new trip. As such, a concurrency is not required for this development. 2. Internal traffic circulation should be revised to promote safe and efficient traffic movements. The PW traffic division is willing to meet with the applicant to go over options to improve the existing access. L:\CSDC\DOCS\SAVE\9986306053.DOC y •'f �BTrnwiHc . �wa�sua��a _..,ram• . W. • y - T' N _ CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: TO: FROM: FOR DR MTG, ON.• FILE NUMBER(s): RELATED FILE NOS.: PROJECT NAME: PROJECT ADDRESS. ZONING DISTRICT. PROJECT DESCRIPTION: LAND USE PERMITS: March 12, 2010 Kevin Peterson, Public Works Development Review Sarady Long, Senior traffic engineer Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire & Rescue Deb Barker March 18, 2010 10-100330-00-UP 08104541-UP (Pac Plaza retail for new building) PINK SPOT CAFE 27525 Pacific Highway South Lim Addition of ramp and replacement of door and window for a new fast food restaurant to be established in a former drive through bankbuilding. Process I PROJECT CONTACT: Eddie Linartic LDG Architect 1319DEXTER Ave North, Suite245 Seattle, WA 98109 MATERIALS SUBMITTED: Site Plan, floor plan with elevations RECEIVED CITY OF JAN 2 6 2010' Federal WaYCTY OF FEDERAL WAY CDS MASTER L vD USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8'h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 www,ci offedera[wa .com APPLICATION NO(S) Z 6 r_�Iz D v 3 3 0 — v`/0 Date l -,Zk, Project Name Property Address/Location Parcel Number(s) 22_2::;' Z Z 4 Project Description e= l �L'� '"'l T" �� - 02 PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination T Preapplication Conference Process I (Director=s Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information 'Sc, Zoning Designation Comprehensive Plan Designation Value of Existing Improvements 15 v r> o Value of Proposed Improvements International Building Code (IBC): (� Occupancy Type Construction Type Applicant Name: Address: L2_,l!:1 City/State: Zip: L Phone: Fax: Email: l L—1� G' Signature:.: Agent (if different than Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: a ( ( 2 L L C- ?S Address: [ 2,�tLC City/State: Zip: `lL 7-9- Phone: Ze;--z, � Email: V43 e Signature: ____....7 Bulletin #003 —August 18, 2004 Page 1 of I k:\Handouts\Master Land Use Application i LINARDIC DESIGN GROUP 1319 DEXTER AVE N. A SUITE 260 A SEATTLE, WA 98109 TELEPHONE A 206-283-4764 FAX A 206-283-1293 January 26, 2010 City of Federal Way 33325 8`h Ave So Federal Way, WA 98063 RE. The Pink Spot Cafe—10-100330-00-UP 27525 Pacific Ave so Narrative Summary RECEIVED JAN 2 6 2010 CITY OF FEDERAL WAY CDS The project will consist of using the existing building on site to provide an espresso coffee establishment. The existing drive thru lane will be utilized on the building as well as having interior serving and seating available. The extent on the updates for this building permit will be the addition on an exterior ramp and exterior door to provide public access to the existing rest room. The drive thru window will be replaced to facilitate coffee delivery. All parking, landscaping and paving are existing. If there are any questions please do not hesitate to call. Sincerely, Linardic Design Group/Architects Mike Baily MB:lb