Loading...
11-101830 (2)CHICAGO TITLE INS, C0.6) REF#y►1 I1 UR-!G Recording Requested By; When Recorded Mail To; CITY OF FEDERAL WAY III 1111111111111111111 11�1III III III 201301100 1260 CHICAGO TITLE EAS 77,00 PAGE-001 or 006 01/10/2013 12;18 KING counlY, WA 33325 8`" Ave S E.X0i4 ; T AX N0T RE-QLIRED FEDERAL WAY, WA 98003 1c„ . o. Reoord. DM 'on TT AN; Ann ❑ wer Development Services ay � Deputy EASEMENT FOR SURFACE WATER FACILITIES Grantor (s): McDonald's Real Estate Company, •a Delaware Corporation Grantee (s): CITY OF FEDERAL WAY, a Washington Municipal Corporation Property Legal Description (abbreviated): Lot 1, KCSP #L94S0017, Vol, 102, Page 256, Recoding no, 9503229004, Icing County, WA, Additional Legal Description indicated below, Easement Legal Description: A portion of Lot 1, KCSP #L94S0017, Vol. 102, Page 256, Recording no. 950322900.4, King County, WA, Entire Legal on Exhibit A Assessor's Tax Parcel ID#(s); 332204 9129 For and in consideration of One Dollar ($1.00) and other valuable consideration, the receipt of which is hereby acknowledged, McDonald's Real Estate Company, a Delaware Corporation, ("Grantor") grants, conveys and warrants to the CITY OF FEDERAL WAY, a Washington municipal corporation, ("Grantee") for the purposes hereinafter set forth a perpetual easement under, across and over a portion of that certain real property (the "Property") located in Federal Way, Washington, legally described as follows; Lot 1 of King County Short Plat No, L94S0017, Vol. 102, Page 256, Recorded under Recording no. 9503229004, records of King County, Washington Except as may be otherwise set forth herein, Grantee's rights shall be exercised upon that portion of the Property consisting of a utility easement ("Easement") described as follows; Legal Description of Easement attached hereto as Exhibit "A" and depicted on Exhibit "B", incorporated herein by this reference. 1. Purpose. Grantee and its agents, dcsigpees and/or assigns shall have the right, after fifteen (15) days' prior written notice (or no jioticc in case of emergency) to Grantor, at such times as deemed necessary by Grantee for maintenance situations, to enter upon the Property to inspect, clean, operate, maintain, repair, replace, and remove all surface water facilities including, but not limited to, underground facilities and/or systems under the Easement, semi -buried or ground mounted facilities, vaults, outlet structures, control structures, pipes, catch basins, manholes, and all appurtenances thereto ("Facilities"). Following the initial construction of the Facilities, Grantee may from time to time construct such additional facilities as it may require, after providing fifteen (15) days written notice to Grantor. Grantee shall minimize disturbance to the operation of and access to the restaurant operating on the premises. The City of Federal Way's maintenance responsibility is confined to the conveyance system within the easement area which serves Pacific Highway South, and does not extend to any part of the private storm water facility. 2. Access. Grantee shall have the right of access to the Easement over and across the Property to enable Grantee to exercise its rights hereunder by utilizing the improved driveway on the Property or by any other method mutually agreeable to Grantor and Grantee, 3. Obstructions; Landscaping. Grantee may from time to lime remove vegetation, trees, or other obstructions within the Easement, and may level and grade the Easement to the extent reasonably necessary to carry out the purposes set forth in paragraph 1 hereof, provided, that following any such work, Grantee shall restore the Easement to a condition the same or better than its condition prior to such work. Following the installation of the Facilities, Grantor may undertake any ordinary improvements to the landscaping of the Easement, provided that no trees or other plants shall be placed thereon, which would be unreasonably expensive or impractical for Grantee to remove and restore, 4, Grantor's Use of Easement. Grantor reserves the right to use the Easement for any purpose not inconsistent with Grantee's rights, provided that Grantor shall not construct or maintain any buildings or other structures on the Easement, that neither Grantor or Grantee shall not perform grading, digging, tunneling, or other form of construction activity on the Property, that would alter the functioning of the Facilities, and that Grantor shall not blast within fifteen (15) feet of the Easement. Further, no other improvements shall be constructed within five (5) feet of the centerline of the City's pipe without City's consent, which will not be. unreasonably withheld. 5. Successors and Assigns, The rights and obligations of the parties shall inure to the benefit of and be binding upon their respective successors in interest, heirs and assigns. SIGNATURES TO FOLLOW DATED THIS day of December, 2012. GRANTEE - CITY Of FEDERAL WAY, a Washingon Municipal Corporation 01 sYr _� -- - (signatu e) ct,c Y`/" 443 (printed h ine) STATE OF COUNTY OF n tl11is d erspnally.apppea ed before me �� , to me known to be the ?sretlF��F�. PUbl�c W of the City o Federal Way, a Washington Municipal Corporatio , that exe uted the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated tba&kwas authorized to execute said instrument and that the seal affixed, if any, is the corporate seal ofsaid corporation. GIVEN rn.y hand and official seal this Vd day of , V ti p—; PRINTF..D NAME N �'qT•. -� ;,,�"'' �``,tii�� Notary Public in and for the.,�tate of Washington, P My commission expires DATED THIS 12"' day of November, 2012. GRANTOR; McDonald's Real Estate Company, a Delaware Corporation Catherine A. Griffin, Vice President STATE OF ILLINOIS) )Ss. COUNTY OF DUPAGE) On this day personally appeared before me Catherine A, Griffin, to me known to be the Vice President of the McDonald's Real Estate Company, a Delaware Corporation, that executed the foregoing instrument, and acknowledged the said instrument to be the free and'voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation, GIVEN my hand and official seal this JJ�h� day of._j){}i f'? beP , 2012, ab= M - cjn�ll OFFICIAL SEAL J nn M. Carmody JOANN M CARMODY (typed/printed name of notary) NOTARY PUBLIC, STATE OFILLINOIS Notary Public in and for the State of Il inois. MY�OMMISSIONEXPIR�S;02/�3l14 My commission expires 02-23-2014 . ................ ................. , ............... ,......., ......,,....,. EXHIBIT A EASEMENT LEGAL DESCRIPTION THAT PORTION OF LOT 1, KING COUNTY SHORT PLAT NO. L94S0017, VOLUME 102, PAGE 256, RECORDED UNDER RECORDING NO, 9503229004, RECORDS OF KING COUNTY, WASHINGTON MORE PARTICULARLY DESCRIBED AS FOLLOWS: THE NORTH 2O,00 FEET, TOGETHER WITH THE WEST 20,00 FEET OF THE NORTH 32,00 FEET OF SAID LOT 1, THE SIDELINES OF WHICH SHALL EXTEND OR SHORTEN TO MEET AT ANGLE POINTS AND BOUNDARY LINES. CONTAINING 6,776 SQ. Fr. 13006 NE 126UI Pl. KIRKLAND, WA 68034 TEL, 426.823-5700 FAX 426.623.0700 ' Survey & Mapping Page 1 at 1 10125t2011 Y•• r � j 4 EXHIBIT 13 EASEMENT EXHIBIT t• A#ls GRAPHIC SCALE 0 15, 30, N 88'37'00° W 310.35' 1"=S0' • 20 0, PROPOSED -J PROPOSED STORM DRAINAGE STORM EASEMENT q,� DRAINAGE EASEMENT 3 LOT 1 a KING COUNTY SP NO. L94SO017 REC, NO. 9503229004 r D rr 249.12' I LOT 2 POR, NWl/4, SW 1/4, SEC.33,TW CITY OF FEDERAL WAY, WA! - www.axlsm, JOB NO. 13005 NE 126th PL. Ax.!sK,RKLA.., 117117 1 DRAWN BY Cl WA 98034 TEL. 426.823-5700 Z 2 SurVOY & Mapping FAX 425.823-6700 SCALE 1"=30' 1 S i% J j rr�4r X Is After recording returh 1:0 1V1WVM,f&79 eW4X4"d,�-.1' J1 4r id: Ul=rWT16 OF C6VENAkW IN rOFI IAERft3ION OF the approved King FOE441- WAY (ew") permit for ft relating t6 hr 1 eg' bed as ,eal Troperty ally described s V4 The urtWri9ngre d adeclares that the above describedproperty 5p eW M is hei4VUan asefRO for "�jnatural or constructed conveyance system 0 "Stif'k 0 and hereby deal cat6 c*Onants?�zd 49rqes as follows: r- RT I. 'King s6l l..?have tlii r.j9hf to-;Jn9ress and egress over those access surer easement area for Inspec- portions not contained t;i EAMU HA! to. M'Qnjtd� the system for pFerfir tion of and to reasonabli"pance, operational. flows, or defects In accordance w(th andjas presented in King County Code section 9,04,1203, X I 1�1 2. If King County determines that•iitaipter4nce�r repair r 0k" S ier ftAag�wnt6rfi�e ia required to be done to the system, the Hanager: f tjia Division of the Department of Public Works shall giVg,notfce�f the-50�cifj*c,"' maintenance and/or repair required pursuant to K.C.C. 9.64. M d� the Kii4aj,0 .. shall also set a reasonable time in which such work is to be cpl at4<-by.Ahet Grantor(s), its heirs, successors or assigns. If the above reqUjr.exL- VB:M[16 % c. 10, Ye —7 maintenance andlai re air is nq r-qkploied within the time t1 nank I and/& the County may PE144 to rewired red jujiqh 1r will be sent to the raftDrji GOUftty'S in maintenance. Maintenance •ti6W'wili �"Ot#WkKz; set by the Manager, -air. Written notice Ion to perform such least seven (7) days after such notice Is mailed, wilhik the solexdisorq6".. the Surfalce "�iqtment Division Manager, t Rere exiftsAn X er, Wate� Man �Ps P. "d ; sait seven (ij day notice period will 4VAVq4 a,marl �d jr p e a r pair rk vjji,bpg-; immediately. p hY e7isting -93 if it any time King County reasonably detefm.ines that 0 regenti.604e ,qtjjja--a4stem creates any of the conditions -Iisted;An 9.0..PSO aheiein incorporated by reference, the SurAce,= 6ter'N 14aT!wt jbivitioif Manage rtake measures specified therein 4. the 'rrdntoir(j) shj� 7- �11 assume all responsibility for the cost of any � S maintenance -and fV r,�pajps tb;;th� system. Such responsibility shall include reimbursement to tfia-'cou(ty within -thirty -00) days of the receipt of the X CD invoice for any such track pei�ftra�A Overdue- payme n t s will require payment 0 f interest at the curreni-Iaqirrat4S qu4atid cWjwj-es• if legal action ensues, the prevailing party 4 e:t1`tTed to cost,;,Pr f e Q,s, ...... 5. The Grantor(s) is (are) h0'r,,4,e.by 4quil" obtain written approvald t from the Surface Water Management Divisi114an cutt" or reMOVI�g Y997 H agel of; thp, Kifig,Xcan Department of Public Works prior to. fillin etation (except in routine landscape maintenanc,�-.fn etite�f dr 9 t: - �Je facilities (such as swales, channels, ditches, ponds -pghd,et4.), 61VPf'96- Ing any alterations or modifications to the drainage facilities within said drainage easement. Any notice or consent required' DO -A 16 - 2 - _, nolkI iiiiio f j S• 3 S f e'�'f ,r,�w�. otherwise provided far by?'the provysJoAs of this Agreement shall be effective upon personal delive6".."r thhee (3)r&ysraPe-PiEdiling W t'irtified Mail, return receipt requested. 6. This Agreement constitujes th2 en�ire agrke[gent etween the parties, and superise s all prior discussions, no a•ltgas.:ind;all• agreemdots what 6s ,-. - ever wh¢ther &al or written. '`�,, , f• �� r ' to +• � ^r � c this .cn�enant is intended to protect the vatq � f esirabi� I V JbfAhe real progirty=des�ribed above, and shalT insure to the benefit ali"th¢ zens offKiniCounty, and shall be binding on all heirs, sbccdsnrs end x? � assigtfsA�;�' rs . 04iHER STATE OF WASHINGTON ] �er r f+ COUNTY OF PIING On this date personally appeared bifefie ,PANDY A7RlDace Fmr r.�is'� VP - ; to h[e icnownArtorG the individual described in and who executed; the within:�and,••faregoing instru- ment and acknowledged that they signed flte:'sagie al ttld`ir free and'vC)untary act and deed, for the uses and purposes therein 4tated. .: ' s :S dArC ven under my hand and official sea] this ? dad of r `5 •� '•sr4�' LI in and fer the State of �yrslq 1pI ' n, residing at s a " Hy ommission Expires: �n�, r �+ '• "-•• fr P oa:n[ts - 3 - { r's, - ' F ktcmn fG�•, �•,, ,•' -Ko, 5 of { �ti . .r it •:' �,. S&iEM13ER 0, 1994 ?~ }= r �AffiRD^JECT NO. 93031 " , s Rj�ONDO, WA 1:EC3i� DESCRIPTION f CONVENMT EASEMENT AN' t,E SEt ENT FOR COVENANT PURPOSES '020, ;JICRflSS=AHR' B�1.OY� TnAt,, PORTION OF THE SOUTHWEST QUARTER OF TIE tj RTHWE9T ; QUAFt1ER - F THE NORTHWEST QUARTER OF SECTIONN ' 3, i.OWHSHIP 22 NORTH, RANGE 4 EAST, W.M. , IN KING COUNTY., WASHItft9TON,: LYING WE&'rERLff OF THE WEST MARGIN OF PACIFIC Hf&HW6;V gbMfH .{STATE ,° HI�HWAY NQ —4-4 DESCRIBED AS FOLLOWS: ; ^`' S'EGINN$�1Q AT TgE POINT OF INTERSECTION THE NORTH<:-ImE OF THE SOUTFI,'b30 FEET OF SAID SOUTHWEST QUARTER OF THE NORTHWEST QUARTER qO TtiE,0ORTHWEST QUARTER WITH THE EAST LINE OF THE :,.,.�lE3T '30x FEET JF SAID,,$OUTHWEST QUARTER OF THE NORTHWEST N 'QUARTER OF THE;`NWRTHWPS� QUARTER; THENCE SOUTH.0&.W OR"; -•EAST ALONG SAID NORTH LINE OF SAID SOUTH 33O m ri FEET OF -mk SoUTHWEBrf,QUiARTER OF THE NORTHWEST QUARTER OF THE NORTHWEST ,AUAR'VER'-31-0.36 FEET TO THE WESTERLY MARGIN OF PACIFIti-H.i0WAY SOUTH; THENCE'SOUTH 20'43'38" WEST ALONG SAID WESTERLY 'MARGIN 38. 14 FEET -`'THENCE NORTH 88' 37' 00" WEST ❑ 243.00 FEET; H.Ekj,SOUTR 3S'24:'6&',•' WEST 65.86 FEET; THENCE t++ SOUTH 01 " 10' 08.WEST'•=;80 ,.b0 0EE-f; UENQE NORTH 88' 37' 00' WEST 97 20.00 FEET TO I. -HE EAST [SINE OF Y� THE S7: 230.00 FEET OF SAID SOUTHWEST QUART Oft TF{E tORTHWEST ,QUA�t��ft, OF THE NORTHWEST QUARTER; THENCE N6'§TH 01"fO'9e EAS-r ALONG SAID EAST LINE 140.00 FEET TO THE POINT OP--SEQ3 NKNG,,,, • .ry F kY •f' r s` r' n m jF KETCH OF COVENANT EASEMENT wl ❑ ibUTkf--MW. OF Nc NE r �j OF l 4 F HW jf/4 OF; 'Sk 33_ 2 o6VEPANTz! AN CID Gj N 68*37'00' W 249AT % 01"25'50' 5780.00' L 146.00' 0 CJ kj SOUTH we d. sw NW 1/4NW I SEC. 33-22-4 `tL: S Pr A E. IF I visit% L L PIRES 03/OU/ 6 TIM HANSON AND ASSOCIATES, INC. 6025 108TH AVE. N.E. KIRKLAND, WA 98033 206-822-7271 SEPTEM13ER 6 124 L303 PROJECT NO 1 f. THE MOST ADVANCED NAME IN DRAINAGE SYSTEMS May 27, 2011 Mr. John Hanson PAC LAND 11711 SE 80' St. Suite 303 Bellevue, WA 98005 Dear Mr. Hanson, Thank you for the opportunity to work with you in regards to the Federal Way McDonald's project in Federal Way, WA. For questions regarding the installation and structural performance of ADS N- 12 pipe, please reference the ADS Drainage Handbook at www.ads- i e.com.. After performing a cursory review of the supplied plans it appears that the project requirements for the storm drainage bypass pipe are consistent with the requirements published in the ADS Drainage Handbook. Please note that it is imperative that backfill be placed uniformly around the circumference of pipe to provide proper structural support. Care should also be taken to ensure that the pipe backfill remain stable through out the design life of the project. Please refer to ADS flotation Technical Note 5.05 for areas of the project where flotation may be a concern. Please note that ADS has not performed any engineering or design services for this project, nor does ADS purport to address all the relevant design consideration associated with the project. It is the design engineer's responsibility to ensure the project plans meet or exceed the applicable national, state, or local requirements. If you have any further questions, feel free to contact me directly at phone #614-658-0304 or email at i ioe.babcanec u.ads-tse co_m. Additional information can also be found on the ADS website at www.ads-piipe.corn. Thank you, e Babcanec, P.E. Application Engineering Manager Advanced Drainage Systems, Inc. ADVANCED DRAINAGE SYSTEMS, INC., 4640 TRUEMAN BLVD., HILLIARD, OH 43026 PHONE: 800/733-7473 E-mail: info@ads-pipe.com Web site: www. ads-pipe.com McDonald's Stormwater Bypass System Federal Way, Washington 5/25/2011 KCRTS Calculations Flow Frequency Analysis Time Series File:mcdl5.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.715 6 8/27/01 18:00 1.77 1 100.00 0.990 0.499 8 9/17/02 17:45 1.35 2 25.00 0.960 1.35 2 12/08/02 17:15 0.970 3 10.00 0.900 0.575 7 8/23/04 14:30 0.799 4 5.00 0.800 0.757 5 10/28/04 16:00 0.757 5 3.00 0.667 0.799 4 10/27/05 10:45 0.715 6 2.00 0.500 0.970 3 10/25/06 22:45 0.575 7 1.30 0.231 1.77 1 1/09/08 6:30 0.499 8 1.10 0.091 Computed Peaks 1.63 50.00 0.980 - - Area - -- Till Forest' 0.00 acres, Till Pasture. 0.00 acres Till Grass; 0.00 acres' Outwash Forest' 0.00 acres` Outwash Pasture` 0.00 acres, Outwash Grass` 0.00 acres' Wetland 0.00 acres Impervious 1.50 acres - Total 1.50 acres' Scale Factor: 1.00 15-Min Reduced Edit Flow Paths Time Series: >>� Compute Time Series Modify User Input To route the Unit Runoff File, Edit Paths KCBW Calculations BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:McD.bwp Surcharge condition at intermediate junctions Tailwater Elevation:312.03 feet Discharge Range:1.35 to 1.77 Step of 0.42 [cfs] Overflow Elevation:315. feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 1: 40 LF - 12"CP @ 1.32% OUTLET: 310.50 INLET: 311.03 INTYP: 5 JUNC NO. 1: OVERFLOW -EL: 316.40 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.35 1.12 312.15 * 0.012 0.50 0.38 1.53 1.53 1.05 1.12 0.71 1.77 1.21 312.24 * 0.012 0.57 0.44 1.53 1.53 1.08 1.21 0.85 PIPE NO. 2: 15 LF - 18"CP @ 0.00% OUTLET: 311.03 INLET: 311.03 INTYP: 5 JUNC NO. 2: OVERFLOW -EL: 316.40 BEND: 90 DEG DIA/WIDTH: 2.2 Q-RATIO: 0.00 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.35 1.16 312.19 * 0.012 0.44 0.00 1.12 1.12 1.13 1.16 0.60 1.77 1.25 312.28 * 0.012 0.51 0.00 1.21 1.21 1.22 1.25 0.70 PIPE NO. 3: 268 LF - 18"CP @ 0.10% OUTLET: 311.03 INLET: 311.30 INTYP: 5 JUNC NO. 3: OVERFLOW -EL: 315.00 BEND: 15 DEG DIA/WIDTH: 2.2 Q-RATIO: 0.00 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.35 0.96 312.26 * 0.012 0.44 0.64 1.16 1.16 0.94 0.96 0.59 1.77 1.09 312.39 * 0.012 0.51 0.75 1.25 1.25 1.06 1.09 0.68 PIPE NO. 4: 2 LF - 18"CP @ 10.00% OUTLET: 311.30 INLET: 311.50 INTYP: 5 JUNC NO. 4: OVERFLOW -EL: 314.50 BEND: 75 DEG DIA/WIDTH: 6.0 Q-RATIO: 0.00 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.35 0.52 312.02 * 0.012 0.44 0.20 0.96 0.96 0.44 ***** 0.52 1.77 0.62 312.12 * 0.012 0.51 0.23 1.09 1.09 0.51 ***** 0.62 PIPE NO. 5: 60 LF - 18"CP @ 0.50% OUTLET: 311.50 INLET: 311.80 INTYP: 5 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 1.35 0.59 312.39 * 0.012 0.44 0.42 0.52 0.52 0.44 ***** 0.59 1.77 0.69 312.49 * 0.012 0.51 0.48 0.62 0.62 0.51 ***** 0.69 CITY OF Federal May 16, 2011 Jenelle Taflin PACLAND 11711 SE 8t' Street, Suite 303 Bellevue, WA 98005 CITY HALL 33325 8th Avenue South Way Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www. cityoffederal way. com RE: MCDONALD'S STORMWA TER BYPASS SYSTEM Folder # 11-101830-00-EN; 27515 PACIFIC HWY S Dear Ms. Taflin: City staff has reviewed the plans and calculations provided for McDonald's storm bypass. Please make the following revisions: 1. Provide a signature block (City of Federal Way detail # 2 —1) on each sheet. 2. Provide a letter from the pipe manufacturer verifying that the pipe material and thickness are suitable for this application. Staff is concerned that the pipe might shift within the gabion or that point loading could damage the pipe since it is not surrounded by typical bedding material and is not anchored. 3. Add a structure mid -length of the pipe to facilitate cleaning. 4. Extend the existing gravel access pad approximately 20 feet to the north to allow access to the new catch basin on the west corner of the property. Verify the vertical clearance between the existing perforated pipe and the new pipe. In addition, verify that the existing 72" manhole on the east corner of the site will not be compromised structurally by having an additional pipe cored in above the existing pipe. 6. Provide a drawn -to -scale detail of the outlet structure. If, under some circumstances, the bypass pipe may back up into the pond, verify that this is acceptable to the property owner. 8. Verify that a larger footing is not required under the gabions to prevent differential settlement. 9. Please note: City staff calculations (enclosed) using 1.5 acres of impervious area resulted in larger peak flows than Pacland showed, however the size of the pipe still appears to be adequate. 10. Provide erosion control. Document ID: 14822586072.DOC Jenelle Taflin N McDonald's Stormwater Bypass Syste� ^ 1 May 16, 2011 Page 2 11. Add one -call locate information. 12. Prior to acceptance of the project, an easement must be provided to allow City access and maintenance. The property owner will need to prepare a legal description and exhibit map in a format that is acceptable to King County for recording. Once this has been provided, city staff will prepare the document and forward it for the owner's review and signature. 13. Prior to acceptance of the project, the owner will be required to provide electronic as -built record drawings. Please provide three sets of revised plans for further review and signature. Contact me at 253.835.2732 or at ann.dower@cityoffederalway.com if you have questions. Sincerely, V_I=� . Ann Dower Senior Engineering Plans Reviewer AD:mj Enclosure: flow frequency analysis cc: Jeff Chapman; 12131 UP Ave NE, Suite 103; Kirkland„ WA 98034 Flow Frequency Analysis Time Series File:flow.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.715 6 8/27/01 18:00 0.499 8 9/17/02 17:45 1.35 2 12/08/02 17:15 0.575 7 8/23/04 14:30 0.757 5 10/28/04 16:00 0.799 4 10/27/05 10:45 0.970 3 10/25/06 22:45 1.77 1 1/09/08 6:30 Computed Peaks -----Flow Frequency Analysis------- - - Peaks - - Rank Return Prob (CFS) Period 1.77 1 100.00 0.990 1.35 2 25.00 0.960 0.970 3 10.00 0.900 0.799 4 5.00 0.800 0.757 5 3.00 0.667 0.715 6 2.00 0.500 0.575 7 1.30 0.231 0.499 8 1.10 0.091 1.63 50.00 0.980 CITY OF 4A Federal Way COMMUNITY DCVEwPMEN'T SCR VICes 253-835.2607- PAX 253-835-2609 wwnt.MOtnlles8 rukuttn.s run PERMIT EC I �� ME PL EN FP APPLICATION MAY 1 2 ?N11 — -=V SUITE/UNIT # SITE ADDRESS �ii �i —C'(C7" 27515 Pacific Highway S CDS PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $ BC 332204-9129 _ ElBUILDING ❑ PLUMBING ❑ MECHANICAL TYPE OF PERMIT ❑ DEMOLITi`fJ2$ IR ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT McDonald's Stormwater Bypass System M (Tenant Name/Homeowner Last Name) Construct a stormwater bypass system to route runoff PROJECT DESCRIPTION Detailed description of work to generated by Pacific Hwy S past the existing McDonald's stormwater pond. be included on this permit only - -- - PROPERTY OWNER NAME McDonald I s USA, LLC (Jeff Chapman) PRIMARY PHONE 425-242-2421 MAILING ADDRESS 1'2131 113 t h Ave NE , Ste 10 3 EVIL Jeff,Chapman@us.med.com CITY Kirkland 9TATE ZIP 98034 WA v NAmE TBD PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME McDonald's USA, LLC PHONE 425-242-2421 APPLICANT MAMINGA):I"7 11213 113th Ave NE, Ste 103 E-MAIL Jeff.Chapman@us.mcd.com CITY Kirkland eWA ZIP 98034 FAX 425-242-2498 PROJECT CONTACT NAME PACLAND (Jene l l e Ta f l in) PHONE 4 2 5- 4 5 3- 9 5 01 (The individual to receive and respond to all correspondence MAILINGADDRES9 11711 SE 8th Street, Suite 303 jtaflin@pacland.eom concerning thisapplicatton) CITY Bellevue 8WA ZIP 98005 FAX425-453-8208 ALTERNATE CONTACT'NAME: John H nsop PHONE 425-453-9501 E-MAU4 j hanson@pac land, com PROJECT FINANCING NAME y, ® OWNER -FINANCED Required vatue of $5,000 or more (RCW 19.27,095) MAILING ADDRESS, CITY, STATE, ZIP PHONE f certify under penalty of perjury that I am the property owner or authorized agent of the property owner, f certM that to the best of my knowledge, the Infor+nation submitted in support of this permit application is true and correct, I certify that I will comply with all applicable City nj Federal way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance qr this permit dams rat remove the owner's responsibility for compliance with local, state, or ,jdsaieral laws regulating construction or environmental laws. I further agree to hold harmless the City gfFederal Way as to any claim {Including costs, expenses, and attorneys' fees incurred In the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. p x 1 . Z® SIGNATURE: DATE • .:., PRINT NAME: Jeff Chapman-': Bulletin #100 - January 1, 2011 Page 1 of 3 k;\Handouts\Permit Application 117115.E 8THSTREET T425.453.9501 SUFFE 303 F 425.453.8208. M_1V BELLEVUE, WA 98005 WWW,PACLAND.COM Memorandum Date: April 28, 2011 To: Will Appleton, P.E., Surface Water Manager City of Federal Way From: John Hanson, P.E. Subject: McDonald's; Federal Way, WA Stormwater Bypass System CITY Or F=EUERAL \NAB CDs The purpose of this technical memorandum is to address the design of the proposed stormwater bypass system at the existing McDonald's site in Federal Way, Washington. Currently, runoff from approximately 1.5 acres of Pacific Highway South drains to the private onsite stormwater detention pond on the McDonald's site. Since the pond was not designed for this additional area, it gets overwhelmed by the additional runoff during small rainfall events. In order to restore proper operation to the pond, a bypass system must be constructed for the Pacific Highway South runoff. Horizontal Alignment: The proposed bypass system will convey runoff from Pacific Highway South to the drainage structure downstream of the pond. The horizontal alignment of the bypass system is governed by the location of the pond and surrounding site improvements such as the adjacent fencing. Since there is no room for the pipe between the fence and the pond, the proposed alignment goes through the existing pond. The pipe will be supported by gabion baskets through the pond. Additionally, gabion baskets will be installed around the pipe to protect it from UV rays, ensure the pipe is not damaged over time and prevent the pipe from buoyancy concerns. See the Storm Drainage Bypass Plan, C-1.0, in Attachment 1 for details. Vertical Alignment: Due to vertical constraints in the existing drainage systems, the proposed bypass system is generally flat. A conveyance analysis has been prepared for the proposed system using KCRTS and KCBW to ensure that the proposed system has the capacity to convey the runoff from Pacific Highway South. Flows were calculated in KCRTS using drainage areas provided by Will Appleton, Surface Water Manager with the City of Federal Way, via email on April 1, 2011. See Attachment 2 for drainage information provided. From these calculations, the 25-year and 100- 11711 S. E. 8TH STREET T 425.453 9501 surrE3O3 F425.453.82O8 ' BELLEVUE, WA 98OO5 WWW.PACLAND.COM R, Memorandum year peak flows were analyzed in KCBW. Per the calculations included in Attachment 3, the system has adequate capacity to convey the peak flows from Pacific Highway South, Conclusion: As discussed above, the proposed bypass system as proposed on C-1.0 diverts the surface runoff from Pacific Highway South from encumbering the private pond and has sufficient capacity to convey the runoff around the existing McDonald's stormwater pond. Attachment 1 Storm Drainage Bypass Plan, C-1.0 ® COS u GRAPHIC SCALE :a is w ( IN FEET ) 1 inch = 20 fL CITY OF FEDERAL WAY DRAINAGE NOTES 1. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO THE PRECONSTRUCTION MEETING. 2. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH WSDOT 7-023(1). THIS SHALL INCLUDE LEVELING AND COMPACTING THE TRENCH BOTTOM, THE TOP OF FOUNDATION MATERIAL, AND REQUIRED PIPE BEDDING, TO A UNIFORM GRADE SO THAT THE ENTIRE PIPE IS SUPPORTED BY A UNIFORMLY DENSE UNYIELDING BASE. 3. ALL PIPE IN THE ROW THAT IS IN EXCESS OF 18"IN DIAMETER MUST BE PLAIN OR REINFORCED CONCRETE. ADDITIONALLY, IF MORE THAN 100.OF NON -CONCRETE PIPE, IS INSTALLED, THE PIPE MUST BE VIDEOED TO VERIFY THE INTEGRITY OF THE COMPLETED SYSTEM. THE CONTRACTOR SHALL PROVIDE A COPY OF THE VIDEO TO THE CITY, 4. STORM PIPE WITHIN THE PUBLIC RIGHT OF WAY SHALL HAVE A MINIMUM DIAMETER OF 12"(B"DIAMETER DUCTILE IRON PIPE MAY BE PERMITTED ON CROSS STREET LATERALS LESS THAN 66 FEET LONG TO AVOID UTILITY CONFLICT OR MEET SHALLOW GRADIENT AS APPROVED BY THE PUBLIC WORKS DEPARTMENT). 5. STEEL PIPE SHALL BE GALVANIZED AND HAVE ASPHALT TREATMENT 91 OR BETTER INSIDE AND OUTSIDE. 6. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES, NOT LOCATED WITHIN A TRAVELED ROADWAY OR SIDEWALK, SHALL HAVE SOLID LOCKING LIDS, ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS. 7. ALL DRIVEWAY CULVERTS LOCATED WITHIN THE RIGHT OF WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH_ CULVERTS SHALL HAVE BEVELED END SECTIONS TO MATCH THE SIDE SLOPES. ONLY CONCRETE PIPE IS ALLOWED IN DITCH APPLICATIONS. 8. ROCK FOR EROSION PROTECTION OF DITCHES, CHANNELS AND SWALES, WHERE REQUIRED, MUST BE OF SOUND QUARRY ROCK, PLACED TO A DEPTH OF ONE FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4"-B" ROCK/40%-70% PASSING; 2"-4" ROCK/30%-40% PASSING; AND -2" ROCK/10%-20% PASSING. INSTALLATION SHALL BE IN ACCORDANCE WITH 1993 KCRS DRAWING NUMBER 2-024 OR AS AMENDED BY THE APPROVED PLANS. RECYCLED ASPHALT OR CONCRETE RUBBLE SHALL NOT BE USED, 9. LOTS NOT APPROVED FOR INFILTRATION SHALL BE PROVIDED WITH DRAINAGE OUTLETS (STUB -OUTS). STUB -OUTS SHALL CONFORM TO THE FOLLOWING: A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUB -SURFACE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE. EACH OUTLET SHALL HAVE FREE -FLOWING, POSITIVE DRAINAGE TO AN APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION. B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE-FOOT HIGH, 2 X 4 STAKE MARKED "STORM". THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE VISIBLE AND BE SECURED TO THE STAKE. C. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN KCRS 7.04 AND, IF NONMETALLIC, THE PIPE SHALL CONTAIN WIRE OR OTHER ACCEPTABLE DETECTION. D. DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO CONVEY FLOWS THROUGH INDIVIDUAL LOTS. E. THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL STUB -OUT CONVEYANCE LINES WITH RESPECT TO THE UTILITIES (I.E. POWER, GAS, TELEPHONE, TELEVISION). F. ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE LOT HOMEOWNER SEE PIPE SUPPORT- DETAIL, THIS SHEET CB, TYPE I-L RIM=315.0f (MATCH EXISTING) APPROXIMATE LOCATION OF EX TREE TO BE REMOVED 15 LF 1B" HgPE�� SO ® 0% EX 12"_SD EX C8, TYPE II-46"— RIM=316.4f 12" IE 31L03 (W) 18" IE 311.03 (E) CONNECT NEW 18" SO TO EXISTING CB NOTE: GABION PIPE SUPPORT FOR ENTIRE LENGTH ACROSS POND EX. POND NW 1/4, NW 1/4, SEC. 33, TWP. 22 N., RGE. 4 E., W.M. EX 12" IE 311.07t EX CB, TYPE I RIM=314.0 12" IE 311.09t I------------»--- APPROXIMATE LOCATION-- I i I OF EX TREE CLUSTER TO BE REMOVED 11 I •`-3t5---------- -- I I I } ' EX 12" ri 1 I' ( 311.07f �I II i II � it I fr it I III / II �- ,�18" HOPE IE PER PLAN NTS LEGEND - PROPERTY LINE STORM DRAINAGE PIPE TYPE I-L CATCH BASIN . 0 EXISTING GRADE ----3---- EXISTING CATCH BASINS @ ❑ EXISTING STORM DRAIN PIPE —s- EXISTING SANITARY SEWER PIPE ss EXISTING WATER PIPE r.�r EXISTING FENCE EXISTING CURB - EXISTING ROCKERY oO0 EXISTING TREE 0 EX SDMH, TYPE II-1 (TO REMAIN) RIM=314,5 12" IE 31ZD 18" IE 311.5 CONNECT NEW 18" SD TO EXISTING CB Ce, TYPE I-L — RIM=314.5t (MATCH 18" IE 311.3 (E,W) 'C` SQ� — —s-- — ; -- — Ex 12' EXISTING PERFORATED _" PIPE TO REMAIN I I [• EXISTING MCDONALD'S PARKING LOT PIPE SUPPORT DETAIL !d S 2,_., ST PROJECT SITE S 275TH PL S 276TH PL S 277TH PL S 279TH ST VICINITY MAP NTS EX SDMH RIM-319.0 18" IE 311 8 EX CB —�• 18" IE 315.9 -Cs - 777- 77," I /�`---CAP-END OF EXPERFORATED�IPE--/ 1 2 LF 18" HDPE ED ® 1010% 71 I �+ DRAWN WITHOUT THE BENEFIT OF A SURVEY. CONTRACTOR TO VERIFY ALL EXISTING INFORMATION, INCLUDING ALL CONNECTING INVERT ELEVATIONS, PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. TING ROCKERY JES TO BE REMOVED �1 COS ; ROCKERY 41N t Know whars below. Call before you dig. O � s F z u o a a O o n. m � m 4a1 Z Q J E1 /�finn® Z U) ooU 9Q F- Q W = r �°�a m � (n W Op (LILQ Q mQ3 Z �OU.)W m: 04 0 N L c O C-1.0 66 Attachment 2 Pacific Highway South Drainage Basin Exhibit from City of Federal Way MAI ! Or VbDFpAL\NAY Cos Attachment 3 KCRTS Peak Flow Calculation KCBW Conveyance Analysis McDonald's Stormwater Bypass System Federal Way, Washington KCRTS Peak Flow Calculations Flow Frequency Analysis Time Series File:fedwaymcd.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.364 7 2/09/01 2:00 0.320 8 1/05/02 16:00 0.444 3 12/08/02 18:00 0.374 6 8/26/04 2:00 0.444 4 10/28/04 16:00 0.389 5 1/18/06 16:00 0.545 2 10/26/06 0:00 0.709 1 1/09/08 6:00 Computed Peaks -Flow Frequency Analysis - - Peaks - - Rank Return Prob (CFS) Period 0.709 1 100.00 0.990 0.545 2 25.00 0.960 0.444 3 10.00 0.900 0.444 4 5.00 0.800 0.389 5 3.00 0.667 0.374 6 2.00 0.500 0.364 7 1.30 0.231 0.320 8 1.10 0.091 0.654 50.00 0.980 KCBW Calculations BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:McD.bwp Surcharge condition at intermediate junctions Tailwater Elevation:312.03 feet Discharge Range:0.55 to 0.71 Step of 0.16 [cfs] Overflow Elevation:315. feet Weir:NONE Upstream Velocity:0. feet/sec PIPE NO. 1: 40 LF - 12"CP @ 1.32% OUTLET: 310.50 INLET: 311.03 INTYP: 5 JUNC NO. 1: OVERFLOW -EL: 316.40 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.55 1.02 312.05 * 0.012 0.31 0.24 1.53 1.53 1.01 1.02 0.42 0.71 1.03 312.06 * 0.012 0.36 0.28 1.53 1.53 1.01 1.03 0.48 PIPE NO. 2: 15 LF - 18"CP @ 0.00% OUTLET: 311.03 INLET: 311.03 INTYP: 5 JUNC NO. 2: OVERFLOW -EL: 316.40 BEND: 90 DEG DIA/WIDTH: 2.2 Q-RATIO: 0.00 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.55 1.04 312.07 * 0.012 0.28 0.00 1.02 1.02 1.03 1.04 0.37 0.71 1.05 312.08 * 0.012 0.32 0.00 1.03 1.03 1.04 1.05 0.43 PIPE NO. 3: 268 LF - 18"CP @ 0.10% OUTLET: 311.03 INLET: 311.30 INTYP: 5 JUNC NO. 3: OVERFLOW -EL: 315.00 BEND: 15 DEG DIA/WIDTH: 2.2 Q-RATIO: 0.00 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.55 0.79 312.09 * 0.012 0.28 0.40 1.04 1.04 0.78 0.79 0.37 0.71 0.82 312.12 * 0.012 0.32 0.46 1.05 1.05 0.81 0.82 0.42 PIPE NO. 4: 2 LF - 18"CP @ 10.00% OUTLET: 311.30 INLET: 311.50 INTYP: 5 JUNC NO. 4: OVERFLOW -EL: 314.50 BEND: 75 DEG DIA/WIDTH: 6.0 Q-RATIO: 0.00 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.55 0.30 311.80 * 0.012 0.28 0.13 0.79 0.79 0.28 ***** 0.30 0.71 0.35 311.85 * 0.012 0.32 0.15 0.82 0.82 0.32 ***** 0.35 PIPE NO. 5: 60 LF - 18"CP @ 0.50% OUTLET: 311.50 INLET: 311.80 INTYP: 5 Q(CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.55 0.37 312.17 * 0.012 0.28 0.27 0.30 0.30 0.28 ***** 0.37 0.71 0.42 312.22 * 0.012 0.32 0.31 0.35 0.35 0.32 ***** 0.42