18-101463CITY OF Federal Way May 18, 2018 SOUTH KING TOOL LIBRARY 1700 S 340TH ST FEDERAL WAY, WA 98003 Department of Community Development 33325 8 Avenue South Federal Way, WA 98003 253-835-2601 — Fax: 253-835-2609 Www.cit o#federafwa .cam RE: Permit #18-101463-00-UP; TOOL LIBRARY BUILDING, 1700 S 340TH ST, Federal Way Dear Larry, larry@southkingtools.org The Community Development Department has completed review of your Process I Master Land Use application for a proposed tool library at 1700 S 340th St. The Process I application is hereby approved per the findings and conclusions noted below. FINDINGS OF FACT 1. The applicant proposes the building of a structure that includes two shipping containers with a 15' x 40' deck in between. 2. The zoning for the subject property is Commercial Enterprise (CE) which allows the use of this facility per Federal Way Revised Code (FWRC) 19.240.050. 3. The proposed structure does not exceed forty feet in height, compliant with elevation requirements in FWRC 19.240.050. 4. The shipping containers will include windows and will be blue with light grey trim in order to match the color of the existing Masonic Lodge 302 building. 5. Community Design guidelines set forth in FWRC 19.115.050 are met with the proposed walkway and signage for pedestrians. Community Design Guidelines set forth in FWRC 19.115.060 are met with the proposed window openings with visible trim material and vertical trellis with vines. 6. The proposed drawings indicate that the facility will meet the minimum setbacks which are twenty feet in the front and ten feet in the sides and back. 7. Pursuant to FWRC 19.130.080, a decreased number of parking spaces may be permitted if it is documented that fewer parking spaces will can fully serve the uses. Since it is documented that the Tool Library will be operating during hours which will not coincide with Masonic Lodge 302's operating hours, the three spaces formerly required of the Tool Library are negated. 8. A building permit is required for the project. CONCLUSIONS OF LAW Various sections of the zoning and development code indicate that certain developments, activities, or uses are permitted only if approved using Process I — Director's Approval. Based on the findings above, the proposed improvements to the developed site meet the Process I approval criteria and land use review thresholds of Federal Way Revised Code (FWRC) 19.15.030 and 19.55.020: Tool Library in Federal Way File 18-101463 May 18, 2018 1. The proposed improvements are consistent with applicable chapters of FWRC Title 19 including, but not limited to: Permits and Review Processes; Process I — Director's Approval; and FWRC Zone Use Chart 19.215.020, Restaurant uses in the BN zone. 2. The proposal is a minor improvement, modification, or addition to a site that is exempt from State Environmental Policy Act (SEPA) review. 3. The health, safety, and welfare of the citizens of the city are preserved. APPEALS The effective date of this decision per FWRC 19.05.360 is May 24th, 2018. Pursuant to FWRC 19.55.050, the applicant, any person who submitted written comments or information, any person who has specifically requested a copy of the decision, or the city may appeal this decision to the Federal Way Hearing Examiner by June 7"', 2018. Any appeal must be in the form of a letter delivered to the Community Development Department with the established fee. The notice of appeal must contain a statement identifying the decision being appealed, along with a copy of the decision; a statement of the alleged errors in the director's decision, including identification of specific factual findings and conclusions of the director disputed by the person filing the appeal; and the appellant's name, address, telephone number, and fax number, and any other information to facilitate communications with the appellant. CLOSING This land use decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. This Process I approval does not constitute approval of a building permit. If you have any questions regarding this decision, please contact Riley Bushnell, Planning Intern, at (253) 835-2622, or Riley.Bushnell@cityoffederalway.com. Sincerely, t ► Brian Davis Community Development Director enc: Approved Site Plan Commercial Building Permit Checklist C. Riley Bushnell, Planning Intern Peter Lawrence, Plans Examiner, via email Kevin Peterson, Public Works Chris Cahan, South King Fire and Rescue, via email Rick Perez, City Traffic Engineer 2 South King Tool Library Thornton F. McElroy Lodge Temple Association Inc. 1 700 S 340th St Federal Way, WA 98003 South King Tool Library Building ■1iww�ll`�y J AIR 15 2918 -0F FEDERAL WAY The South King Tool Library would like to build a new structure on the Thornton F. McElroy Lodge Temple Association, Inc. property at 1700 S 340th St, Federal Way, WA 98003 to house a community tool library. The South King Tool Library (SKTL) is a non-profit community organization which provides equal access to tools and training in order to help maintain neighborhoods, build community and reduce unnecessary consumption. They are fiscally sponsored by Tilth Alliance and therefore have 501(c)3 tax status. Tool libraries are like regular libraries, but loan out tools and equipment instead of books. They provide equal access to tools and training in order to help people maintain and improve their homes, yards and neighborhoods. Tool libraries are especially important for low-income community members because it reduces the burden of buying or renting tools whenever a project requires it. There are currently seven tool libraries in King County and one in Pierce County with the closest two being in Southeast Seattle and Hilltop in Tacoma. SKTL approached the Thornton F. McElroy Masonic Lodge as a potential location for their tool library building. The Masonic Fraternity is the oldest Fraternity in the world, and includes Masons as well as several related organizations for their ladies,couples and youth. These varied Masonic organizations contribute to numerous charitable activities such as hospital youth scholarships for the less fortunate. The tool library project is aligned with the Masonic mission of giving back to the community, especially those less fortunate. The South King Tool Library building will be constructed from two donated 8'x40' cargo -shipping containers with a 15'x40' covered deck in between. Reuse and repair are an essential part of the tool library, so upcycling a building from used shipping containers seemed logical. The building is planned to be as eco-friendly as possible with as many recycled and sustainable elements as can be incorporated. King County Green Building has created a cabin from a used shipping container, and is providing advice based upon their experience to ensure this building will be as sustainable as possible. This building project will be completed by community volunteers using donated and reused materials. It will be as environmentally friendly as possible and will serve the South King and North Pierce county residents and communities. Zoning Designation and Use. The SKTL building will be constructed as an accessory use to the Thornton F. McElroy Lodge Temple Association, Inc. located at 1700 S 340th St, Federal Way, WA 98003 (PID 2121049024). This is currently zoned as Commercial Enterprise which permits rental/leasing facilities for equipment. Land Use Review Process/SEPA. The proposed building is planned to be 640 sq. ft. which is significantly less than 25% of the current 8,940 sq. ft. building. Therefore this improvement shall be subject to the Process I Review and is exempt from State Environmental Policy Act (SEPA), public notification and nonconformance. Key Development Regulations. The proposed building is being constructed outside the standard setbacks. The building will be a single story, significantly less than the maximum 40' building height. Required Parking. The tool library building is expected to be open to the public Wednesdays 3 — 7 PM and Saturdays 9 AM — 3 PM for a total of 10 hours per week. The Masonic Lodge holds regular meetings such as coffee on Monday mornings and evening meetings every other Tuesdays which generally has approximately 30 people in attendance. The Lodge is able to be rented out to the public, but this generally happens on Friday and Saturday evenings and on Sundays. The use of the Lodge would not conflict with the regularly scheduled hours of the tool library. Due to the lack of crossover of events, there is currently sufficient parking and no additional spaces need to be added. Community Design Guidelines. There is a wide paved asphalt walkway from the paved asphalt parking area to deck that leads up to the building. There is no current delineation between the parking area and walkway, but a sign will be put up that directs pedestrians to the building entrance. The paved asphalt walkway will be extended to the end of the ramp leading up to the building. The ramp will be made from Trex recycled decking. The entrance to the building will be through a chain link fence gate allowing easy access to the covered space. The building will be blue with light grey trim around the edges of the shipping container and windows. Outside walls will include vertical trellis with vines. Stormwater. The tool library building will be well under the 2,000 SF threshold and therefore not subject to Full Drainage Review. The runoff from the 1,240 SF of rooftop will be diverted through a gutter system to rain barrels on each corner of the building which will disperse water runoff into landscaping which will include native plants. Traffic. The anticipated traffic for the tool library is considered insignificant and therefore not subject to a traffic plan. The hours of expected Tool Shed events will not conflict with other Loade activities thus allowing existing parking to be sufficient. Building. The proposed structure is a single -story structure made from two upcycled cargo shipping containers with a covered deck in between. It is considered a U occupancy classification with a V-B construction type. The building interior will have a small office to be used by staff and volunteers. Interior shelving will be made from reclaimed materials as much as possible. To protect tools from condensation, spray insulation and a good ventilation system will be used. The building will be painted with quality, eco-friendly paint to protect it from rust. Terex, recycled plastic lumber, will be used for the decking and ramp. Narrow horizontal windows and light tunnels will be installed to provide natural light while ensuring structural integrity and providing security from break-ins. Site -Specific Requirements. The tool library building will be designed and constructed so individuals with disabilities can approach, enter and exit. This will include the public areas, staff office and portable toilet facility (for use by staff and volunteers only). The ramp from the paved walkway to the tool library deck will be ADA compliant. A portable handwashing station will be located in the covered area of the building. Water & Sewer. No additional water and sewer lines will be needed as a part of this project. In Closing. Additional eco-friendly elements will be added as budget allows. It is anticipated that building construction will begin in May 2018 and be complete by July 2018. South King Tool Library Building 1700 S 340th St, Federal Way, WA 98003 P I D 2121049024 Cargo Shipping Container Building Colors 1 I RECEIVED APR 0 5 2018 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT The building will be blue with light grey trim around the edges of the shipping container and windows. This grey will match the color of the existing Masonic lodge building. Outside walls will include vertical trellis with vines. CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: 5/14/2018 TO: Cole Elliott, Development Services Manager Rick Perez, City Traffic Engineer Brian Asbury, Lakehaven Water & Sewer District Chris Cahan, South King Fire & Rescue FROM: Riley Bushnell, Planning Intern FOR DRC MTG. ON: Please respond before 5/28 FILE NUMBER(s): 18-101463-00-UP RELATED FILE NOS.: None PROJECT NAME: TOOL LIBRARY BUILDING PROJECT ADDRESS: 1700 S 340TH ST ZONING DISTRICT: CE PROJECT DESCRIPTION: Construction of a tool lending library building constructed of (2) shipping containers connected by a roofed and gated area. LAND USE PERMITS: Use Process 1 PROJECT CONTACT: South King Tool Library, info@southkingtools.org MATERIALS SUBMITTED: Project narrative Site plans Floor and roof plans Exterior Elevations General Notes s T 4 AL -f OF Federal Way MASTER LAND USE APPLICATION DrY �ti'ClI1+ [}�1MUNITY DEVELOPMENT SERVICES V 33325 8`h Avenue South Federal Way, WA 98003-6325 APR 0 5 20Jp 253-835-2607; Fax 253-835-2609 �VLL'.�lt o1'Cederal�va .com Xmmutq&T n ",kL "I", OPlur APPLICATION NO(S) V (O '' �/{- / _ Date q Project Name c, v 1< ;- iil_c 7o o L L) 6 a Property Address/Location V 70 b 7 '1` 0 lC-1S o 0 Parcel Number(s) Project Description PLEASE PRINT 2 l '). 1.0 Lkc (9 2 �1 Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference — Process I (Director's Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial./Residential Required Information C-F Zoning Designation C' 1" Comprehensive Plan Designation Value of Existing Improvements Value of Proposed Improvements 4ernationed Building Code (IBC): Occupancy Type Constriction Type Applicant i Name:" rY . ti W rear v� Address: `� Ca City/State: F.- Luc, k� Zip: tD(�J �S�'� 3 Pliolie: '2_5 1 'z 5 q - l L E ail: l® Sc� `y1�\ vGI $ Cir C) Signature: ovyL.tc, 1PreSldenf Agent (if different than Applicant) Name: 7 �x ad Address: Ca.o eJ 3 5 t%-� lac �.�c Ln q cl P i3S City/State:-R uLo_r, L 4O 1-`J r LA., q. p ZS Zip: Phone: 'I - 25 OI 5 2- Fax: Email: S C, fV k;rlcl �"'e, S s c� �' � Signature: Owner 0 Name:1 C�_ Address; 1 -2 0 0 � `3 4, 0 City/State:_�� � r W 0 � 7 (_Q © Phone. 5 �� 43 3 g --U S d i Fax: Email: O I grlatll F��� U Bulletin #003 —January 1, 2011 Page I of 1 k:\Handouts\Master Land Use Application THESE GENERAL NOTES ARE TO BE USED AS A SUPPLEMENT TO THE SPECIFICATIONS. ANY DISCREPANCIES FOUND AMONG THE DRAWINGS, THE SPECIFICATIONS. THESE GENERAL NOTES AND THE SITE CONDITIONS SHALL BE REPORTED TO THE ARCHITECT, WHO SHALL CORRECT SUCH DISCREPANCY IN WRITING. ANY WORK DONE BY THE GENERAL CONTRACTOR AFTER DISCOVERY OF SUCH DISCREPANCY SHALL BE DONE AT THE GENERAL CONTRACTOR'S RISK. THE GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE DIMENSIONS AMONG ALL DRAWINGS PRIOR TO PROCEEDING NTH ANY WORK OR FABRICATION. THE STRUCTURE HAS BEEN DESIGNER TO RESIST CODE SPECIFIED VERTICAL AND LATERAL FORCES AFTER THE CONSTRUCTION OF ALL STRUCTURAL ELEMENTS HAS BEEN COMPLETED. STABILITY OF THE STRUCTURE PRIOR TO COMPLETION 15 THE SOLE RESPONSIBILITY OF THE GENERAL. CONTRACTOR. THIS RESPONSTBUTY INCLUDES BUT IS NOT LIMITED TO JOS SITE SAFETY; ERECTION MEANS. METHODS, AND SEQUENCES; TEMPORARY SHORING, FORMWORK, BRACING; USE OF EQUIPMENT AND CONSTRUCTION PROCEDURES PROVIDE ADEQUATE RESISTANCE TO LOADS ON THE STRUCTURES DURING CONSTRUCTION PER SEI/ASCE STANDARD NO. 37-14 "DESIGN LOADS ON STRUCTURES DURING CONSTRUCTION." CONSTRUCTION OBSERVATION BY THE STRUCTURAL ENGINEER IS FOR GENERAL CONFORMANCE WITH DESIGN ASPECTS ONLY AND IS NOT INTENDED IN ANY WAY TO REVIEW THE CONTRACTOR'S CONSTRUCTION PROCEDURES. STANDARDS ALL METHODS, MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE 2015 INTERNATIONAL BUILDING CODE (IBC) AS AMENDED AND ADOPTED BY THE LOCAL BUILDING OFFICIAL OR APPLICABLE JURISDICTION. ARC,HITECIURAL DRAW= ARE THE PRIME CONTRACT DRAWINGS. CONSULTANT DRAWINGS BY OTHER DISCIPLINES ARE SUPPLEMENTARY TO ARCHITECTURAL DRAWINGS. REPORT DIMENSIONAL OMISSIONS OR DISCREPANCIES BETWEEN ARCHITECTURAL DRAWINGS AND STRUCTURAL. MECHANICAL, ELECTRICAL OR CIVIL DRAWINGS TO ARCHITECT PRIOR TO PROCEEDING WITH WORK. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS. PRIMARY STRUCTURAL ELEMENTS ARE DIMENSIONED ON STRUCTURAL PLANS AND DETAILS AND OVERALL LAYOUT OF STRUCTURAL PORTION OF WORK. SOME SECONDARY ELEMENTS ARE NOT DIMENSIONED, SUCH AS WALL CONFIGURATIONS, INCLUDING EXACT DOOR AND WINDOW LOCATIONS, ALCOVES, SLAB SLOPES AND DEPRESSIONS, CURBS. ETC, VERTICAL DIMENSIONAL CONTROL 15 DEFINED BY ARCHITECTURAL WALL SECTIONS AND BUILDING SECTIONS, STRUCTURAL DETAILS SHOW DIMENSIONAL RELATIONSHIPS TO CONTROL DIMENSIONS DEFINED BY ARCHITECTURAL DRAWINGS, DETAILING AND SHOP GRAVING PRODUCTION FOR STRUCTURAL ELEMENTS WILL REQUIRE DIMENSIONAL INFORMATION CONTAINED IN BOTH ARCHITECTURAL AND STRUCTURAL DRAWINGS. ALL FOOTINGS SHALL BEAR ON FIRM, UNDISTURBED EARTH OR "STRUCTURAL BACKFILL•. NATIVE EARTH BEARING SHALL BE SURFACE COMPACTED. AREAS OVER -EXCAVATED SHALL BE BACKFILLED WITH LEAN CONCRETE (Fe-2000 PSI) OR -STRUCTURAL BACKFILL'. AREAS DESIGNATED -STRUCTURAL BACKFILL" SHALL BE FILLED WITH APPROVED WELL -GRADED BMRUN MATERIAL. MAXIMUM SIZE OF ROCK 4". FROZEN SOIL, ORGANIC MATERIAL AND DELETERIOUS MATTER NOT ALLOWED. COMPACT TO AT LEAST 95% OF ITS MAXIMUM DENSITY AS DETERMINED BY ASTM D1557. CONTRACTOR SHALL EXERCISE EXTREME CARE DURING EXCAVATION TO AVOID DAMAGE TO BURIED LINES, TANKS, AND OTHER CONCEALED ITEMS. UPON DISCOVERY, DO NOT PROCEED WITH WORK UNTIL RECEIVING WRITTEN INSTRUCTIONS FROM ARCHITECT. A COMPETENT REPRESENTATIVE OF THE OWNER SHALL INSPECT ALL FOOTING EXCAVATIONS FOR SUITABILITY OF BEARING SURFACES PRIOR TO PLACEMENT OF REINFORCING STEEL. PROVIDE DRAINAGE AND DEWATERING AROUND ALL WORK TO AVOID WATER -SOFTENED FOOTINGS. CONCRETE T-IN-PUCE CDNCR COPES, SPECIFICATIONS, AND STANDARDS. CONCRETE WORK SHALL CONFORM TO THE FOLLOWING OODES, SPECIFICATIONS, AND STANDARDS, AND THE STANDARDS AND SPECIFICATIONS THEY REFERENCE, THE CONTRACTOR SHALL OBTAIN AND HAVE READILY AVAILABLE ON SITE THE LATEST VERSION OF THE "ACI MANUAL OF CONCRETE PRACTICE": MIX DESIGNS: THE CONTRACTOR SHALL DESIGN CONCRETE MIXES THAT MEET OR EXCEED THE REOUIREMENTS OF THE CONCRETE MIX TABLE. THE MIX DESIGNS SHALL FACILITATE ANTICIPATED PLACEMENT METHODS, WEATHER, REBAR CONGESTION, ARCHITECTURAL FINISHES, CONSTRUCTION SEQUENCING, STRUCTURAL DETAILS, AND ALL OTHER FACTORS REQUIRED TO PROVIDE A STRUCTURALLY SOUND, AESTHETICALLY ACCEPTABLE FINISHED PRODUCT. WATER REDUCING ADMIXTURES WILL LIKELY BE REQUIRED TO MEET THESE REQUIREMENTS. CONCRETE MIX DESIGNS SHALL CLEARLY INDICATE THE TARGET SLUMP. SLUMP TOLERANCE SHALL BE f 1-1/2 INCHES. AGGRLOTE COARSE AND FINE AGGREGATE SHALL CONFORM TO ASTM C33 CEMErLT: CEMENT SHALL CONFORM TO ASTM C150, TYPE II PORTLAND CEMENT, UNLESS NOTED OTHERWISE. FLYASH: SHALL CONFORM TO ASTM C618 CLASS C OR F, MAXIMUM LOSS OF IGNITION SHALL BE 1.07. SLAG: GROUND GRANULATED BLAST -FURNACE (GGBF) SLAG SHALL CONFORM TO ASTM C989 GRADE 100 OR 120. DESIGN CRITE A WATER: SHALL BE CLEAN AND POTABLE. VERTICAL LOADS MAXIMUM CHLMOE CDNIENTHE MAXIMUM WATER SOLUBLE CHLORIDE CONTENT SHALL NOT EXCEED 0.157E BY WEIGHT OF CEMENT111OUS MATERIAL UNLESS NOTED OTFIERVASE. AREA DESIGN DEAD LIVE LOAD (2) I PARTITION I CONCENTRATED LOAD LOAD LOADS ROOF 25 PSF (1) 300# DECK 80 PSF LATERAL FORCES LATERAL FORCES ARE TRANSMITTED TO FOUNDATION BY SHEAR WALL ACTION WHERE ULTIMATE DISPLACEMENT IS RESISTED BY PASSIVE PRESSURE OF EARTH AND/OR SLIDING FRICTION. OVERTURNING IS RESISTED BY DEAD LOAD OF THE STRUCTURE. THE BUILDING MEETS THE CRITERIA TO USE THE "METHOD 2 - SIMPLIFIED ENVELOPE PROCEDURE" PER ASCE 7-10. - EXPOSURE CATEGORY = B - BASIC WIND SPEED (3 SEC. GUST), VuLT = 11OMPH - RISK CATEGORY PER TABLE 1.5-1 = II - TOPOGRAPHIC FACTOR Kzt = 1.0 - INTERNAL PRESSURE COEFFICIENT (ENCLOSED) = f 0.18 SEISMIC: (ASCE 7-10) V = CsW WHERE Cs =° WITH (e) Cs MINIMUM = 0.044 SDSIe 2 0.01 OR Cs = 0.5SI Cs MINIMUM R FOR Si > 0.69 le SDI Cs MAXIMUM = T( e) FOR T 5 TL OR SDITL Cs MAXIMUM = T2 RW FORT > TL SEISMIC IMPORTANCE FACTOR, Ie = 1.0 RISK CATEGORY OF BUILDING PER TABLE 1.5-1 = B SPECTRAL RESPONSE ACCELERATIONS Ss = 1.283 SI = 0.493 SITE CLASS PER TABLE 20.3-1 = D DESIGN SPECTRAL RESPONSE ACCELERATIONS SDs = 0.855 & SDI = 0.495 SEISMIC DESIGN CATEGORY = D W = EFFECTIVE SEISMIC WEIGHT OF BUILDING = 4,97K ANALYSIS PROCEDURE USED = EQUIVALENT LATERAL FORCE PROCEDURE RESPONSE MODIFICATION FACTOR PER TABLE 12.2-1, R = 4 Cs = 0.214 DESIGN BASE SHEAR V = 1.06K DESIGNIN (REFER TO GEOTECHNICAL REPORT BY GEOTECH. MATCH BACKFILL DESCRIPTION BELOW WITH INFORMATION IN GEOTECH REPORT). SOIL BEARING PRESSURE: 1500 PSF (ASSUMED)* PASSIVE RESISTANCE: 200 PCF (INCLUDES F.O.S. t 1.5) (ASSUMED) COEFFICIENT OF FRICTION: .35 (INCLUDES F.O.S. z 1.5) (ASSUMED) 41/3 INCREASE ALLOWED FOR SEISMIC OR WIND LOADING CONCRETE EXPOSED TO AVEAIHER: PROVIDE 5.0% TOTAL AIR CONTENT FOR ALL CONCRETE EXPOSED TO WEATHER. TOTAL AIR CONTENT IS THE SUM OF ENTRAINED AIR PROVIDED BY ADMIXTURES AND NATURALLY OCCURRING ENTRAPPED AIR. AIR CONTENT SHALL BE TESTED PRIOR TO BEING PLACED IN THE PUMP HOPPER OR BUCKET; IT IS NOT REQUIRED TO BE TESTED AT THE DISCHARGE END OF THE PUMP HOSE. THE TOLERANCE ON ENTRAPPED AIR SHALL BE +2.0% AND -1.5% WITH THE AVERAGE OF ALL TESTS NOT LESS THAN THE SPECIFIED AMOUNT. Tgni tFUENDTIOUS MRTERI • THE SUM OF ALL C�IW PLUS FLYASH AND SLAG. AT THE CONTRACTORS OPTION FLYASH OR SLAG MAY BE SIASTi'NTED FOR CEMENT BUT SHALL NOT EXCEED 25% BY WEIGHT OF TOTAL CEMENTIT10US MATERIAL. IN NO CASE SHALL THE AMOUNT OF FLYASH OR SLAG BE LESS THAN REQUIRED BY THE CONCRETE MIX DESIGN TABLE. FOOTING MIXES SHALL CONTAIN NOT LESS THAN 5 SACKS OF CEMENTITIOUS MATERIAL PER CUBIC YARD, ALL OTHER MIXES SHALL CONTAIN NOT LESS THAN 5-1/2 SACKS OF CEMENTITIOUS MATERIAL PER CUBIC YARD, UNLESS NOTED OTHERWISE. MAX.X MIN. AGGREGATE ITEM DESIGN f'c (PSI) FLYASH GRADING NOTES (AT 28 DAYS U.N.O.) OR SLAG ASTM RATIO (PCY) AASHTO (FOUNDATIONS - LINO 2500 0.50 -- 57 OR 67 CONTROLLED DENSITY FILL 200 - SAND 6 I(CDF) CONCRETE PLACEMENT PLACE CONCRETE FOLLOWING ALL APPLICABLE ACI RECOMMENDATIONS. CONCRETE SHALL BE PROPERLY CONSOLIDATED PER ACI 309 USING INTERIOR MECHANICAL VIBRATORS, DO NOT OVER -VIBRATE. CONCRETE SHALL BE POURED MONOLITHICALLY BETWEEN CONSTRUCTION OR EXPANSION JOINTS. IF CONCRETE IS PLACED BY THE PUMP METHOD, HORSES SHALL BE PROVIDED TO SUPPORT THE HOSE, THE HOSE SHALL NOT BE ALLOWED TO RIDE ON THE REINFORCING. WEATHER FORECASTS SHALL BE MONITORED AND ACI RECOMMENDATIONS FOR HOT AND COLD WEATHER CONCRETING SHALL BE FOLLOWED AS REQUIRED, CONCRETE SHALL NOT FREE FALL MORE THAN 5 FEET DURING PLACEMENT WITHOUT WRITTEN APPROVAL OF STRUCTURAL ENGINEER. 1. NO ALUMINUM ITEMS SHALL BE EMBEDDED IN ANY CONCRETE. 2 ALL EMBED PLATES SHALL BE SECURELY FASTENED IN PLACE. 3. ALL EMBEDDED STEEL ITEMS EXPOSED TO WEATHER SHALL BE PAINTED UNLESS NOTED AS GALVANIZED. SEE DRAWINGS AND SPECIFICATIONS FOR PAINT, PRIMER, AND GALVANIZING REQUIREMENTS. GROUT NdN-SHRINK §ROUT. MASTER BUILDERS "MASTERFLOW 928" OR PRE -APPROVED EQUAL. GROUT SHALL CONFORM TO CRD-C621 AND ASTM C1107 WHEN TESTED AT A FLUID CONSISTENCY PER CRD- C611-85 FOR 30 MINUTES. GROUT MAY BE PLACED FROM A 25 SECOND FLOW TO A STIFF PACKING CONSISTENCY. FILL OR PACK ENTIRE SPACE UNDER PLATES OR SHAPES. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR PREPARATION, INSTALLATION, AND CURING. REINFORCING STEEL SHALL CONFORM TO: ASTM A615, GRADE 60 TYPICAL UNLESS NOTED OTHERWISE. ASTM A615 GRADE 75 WHERE NOTED AS Fy = 75 ON DRAWINGS. DETAIL FABRICATE AND PLACE PER ACI 315 AND ACI 318. REINFORCING AND D BAR MINIMUM LAP SPLICE LENGTHS ("Ls") MINIMUM DEVELOPMENT LENGTHS ("Ld")(EMBEDMENT (MINIMUM (LENGTH FOR SIZE TOP BARS (1) OTHER BARS TOP BARS (1) OTHER BARS 'STANDARD END (HOOKS ("Ldh") #3 7-0" V-6" 1-6• I'-3' O'-7" #4 2-8• 7-0• 2'-0" 1'-Y 0-9" #5 3'-d• 7-7" 1 7-7• 2'-0" I I'-0- SPLICE TABLE NOTi 1. "TOP BARS" ARE HORIZONTAL BARS WITH MORE THAN 12" DEPTH OF CONCRETE CAST BELOW THEM. REINFORCING MEL ;OVER PROVIDE CONCRETE COVER OVER REINFORCEMENT AS FOLLOWS, UNLESS NOTED OTHERWISE: CONCRETE CAST AGAINST EARTH ------------ 3" EXPOSED TO WEATHER OR EARTH ----------- 2" STRUCTURAL STEEL DETAILING, FABRIWON AND ERECTION ALL WORKMANSHIP SHALL CONFORM TO THE RISC MANUAL OF STEEL CONSTRUCTION, 14TH EDITION, THE AISC SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, JUNE 22" 2010, THE RISC CODE OF STANDARD PRACTICE, APRIL 14, WO AND THE AISC SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS, JUNE 22, 2010. STEEL MEMBERS ARE EQUALLY SPACED BETWEEN COLUMNS AND/OR DIMENSION POINTS UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ERECTION AIDS AND OKI PREPARATIONS THAT INCLUDE BUT ARE NOT LIMITED TO. ERECTION ANGLES, LIFT HOLES, AND OTHER AIDES, WELTING PROCEDURES, REQUIRED ROOT OPENINGS, ROOT FACE DIMENSIONS, GROOVE ANGLES, BACKING BARS, WELD EXTENSION TABS, CAPES, SURFACE ROUGHNESS VALUES AND TAPERS OF UNEQUAL PARTS. THE. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLIANCE WITI1 ALL CURRENT OSHA REQUIREMENTS. HOLES, COPES OR OTHER CUTS OR MODIFICATIONS OF THE STRUCTURAL STEEL MEMBERS SHALL NOT BE MADE IN THE FIELD WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER. ALL STEEL FABRICATION SHALL BE PERFORMED BY A FABRICATOR CERTIFIED BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION. THE FABRICATOR SHALL BE DESIGNATED AN AISC CERTIFIED PLANT, CATEGORY STD AT THE TIME OF 010 AND SHALL MAINTAIN THIS CERTIFICATMN FOR THE DURATION OF THE PROJECT. NON-AISC CERTIFIED STEEL FABRICATORS SHALL HAVE FIVE YEARS MINIMUM EXPERIENCE ON SIMILAR PROJECTS OF EQUAL OR LARGER COMPLEXITY AND SCOPE. QUALIFICATIONS SHALL BE SUBMITTED TWO WEEKS PRIOR TO [BID / SHOP DRAWING PRODUCTION] DRAWING INDEX 1 S.01 I GENERAL NOTES 2 S.02 GENERAL NOTES 3 5.03 GENERAL NOTES 4 S.20 FLOOR AND ROOF PLAN 5 S.30 I DETAILS RE5ERVED FOR DFf7 5TAMP m3 F CS" Structural Solutions Seattle I Tacoma I Portland www.pcs-structural.com STAMP F— O 00 m LLU J � Q 0 U) Oc--C7 Q (� -q- Z U Y O 0 LU ILL. U) REVISION DATE 3/23118 JOB # 17-277 DRAWN SMS CHECKED JWB TITLE GENERAL NOTES SHtt `. ! S0.1 FkxmS;IteD1:Ly ALL STEEL ERECTION SHALL BE PERFORMED BY AN ERECTOR CERTIFIED BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION. THE ERECTOR SHALL BE DESIGNATED AN AISC CERTIFIED ERECTOR, CATEGORY CSE AT THE TIME OF BID AND SHALL MAINTAIN THIS CERTIFICATION FOR THE DURATION OF THE PROJECT. NON-AISC CERTIFIED STEEL ERECTORS SHALL HAVE FIVE YEARS MINIMUM EXPERIENCE ON SIMILAR PROJECTS OF EQUAL OR LARGER COMPLEXITY AND SCOPE. QUALIFICATIONS SHALL BE SUBMITTED TWO WEEKS PRIOR TO [BID / SHOP DRAWING PRODUCTION] SM _DETAILERS ALL STEEL DETAILING SHALL BE PERFORMED BY A DETAILER WITH FIVE YEARS MINIMUM EXPERIENCE ON SIMILAR PROJECTS OF EQUAL OR LARGER COMPLEXITY AND SCOPE. QUALIFICATIONS SHALL BE SUBMITTED TWO WEEKS PRIOR TO [BID / SHOP DRAWING PRODUCTION]. MATERIAL PROPERAES OTHER SHAPES AND PLATES: ASTM A36 (Fy = 36 KSI) TYP. U.N.O.; ASTM A572 (Fy = 50 KSI) WHERE INDICATED HOLLOW STRUCTURAL SECTIONS RECTANGULAR & SQUARE - ASTM A500 GRADE B (Fy = 46 KSI) RCUNO - ASTM A500 GRADE B (Fy = 42 KSI) WELDING STRVCTU AL STEEL WELD IN ACCORDANCE WITH "STRUCTURAL WELDING CODE" AWS D1.1. CERTTFICATHQN: ALL WELDING SHALL BE PERFORMED BY WABO/AWS CERTIFIED WELDERS. WELDERS SHALL BE PREQUALIFIED FOR EACH POST10N AND WELD TYPE WHICH THE WELDER WILL BE PERFORMING. WELDED CONNECTIONS INSPECTION: 1. ALL WELDING SHALL BE CHECKED BY VISUAL MEANS AND BY OTHER METHODS DEEMED NECESSARY BY THE WELDING INSPECTOR. THE STANDARDS OF ACCEPTANCE FOR WELDS TESTED BY ULTRASONIC METHODS SHALL CONFORM TO AWS D1.1. ALL WELDS FOUND TO BE DEFECTIVE SHALL BE REPAIRED AND REINSPECTED BY THE SAME METHODS ORIGINALLY USED, AND THIS REPAIR AND REINSPECTION SHALL BE PAID FOR BY THE CONTRACTOR. GENERAL REQUIREMENTS. HEADED STUDS SHALL BE "H4L HEADED CONCRETE ANCHORS" FOR STUDS 5/8" DIAMETER AND SMALLER AND "S3L SHEAR CONNECTORS' FOR STUDS 3/4" DIAMETER AND LARGER AS MANUFACTURED BY NELSON STUD WELDING, INC. OR PRE -APPROVED EQUAL AND SHALL CONFORM TO AWS D1.1. ALL HEADED STUDS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS USING A NELSON WELD GUN, UNLESS NOTED OTHERWISE ON DETAILS. ALL WELDS SHALL BE MADE AND INSPECTED IN ACCORDANCE WITH AWS D1.1. X.IVAalzo Nix G. CONNECTION ULSIGNS ANL EASED UN UUMMUN WIKL NAIL. MIN Irlt rULLUWINb PROPERTIES: TRACKER•• EMBOSSED PENNYWEIGHT DIAMETER (INCHES) LENGTH (INCHES) HEAD /COLOR 8d 0.131 2-1/2 3 / BLUE 10d 0.148 3 4 / WHITE FRAMING LUMBER: STANDARDS. EACH PIECE SHALL BEAR THE GRADE TRADEMARK OF THE WEST COAST LUMBER INSPECTION BUREAU (WCLIB), WESTERN WOOD PRODUCTS ASSOCIATION (WWPA), OR OTHER AGENCY ACCREDITED BY THE AMERICAN LUMBER STANDARD COMMITTEE (ALSC) TO GRADE UNDER ALSC CERTIFIED GRADING RULES. SPECIES AND GRADE (RASE DESIGN VALUE) 1. 6x BEAMS AND HEADERS 'DOUG FIR -LARCH" NO. i (Fba1350 PSI, Fw17D PSI) 2. 2x TO 4x JOISTS, PURLINS AND HEADERS. 'OOUG FIR -LARCH' NO. 2 (Fb=900 PST, Fv=180 PSI) DR 'HEM -FIR" NO. 1 (Fb=975 PSI, F"150 PSI) 3, EXTERIOR STUDS, INTERIOR REARING WALLS AND 4x COLUMNS, 'DRUG FIR -LARCH" NO. 2 (Fb= 900 PSI, Fc=135G PSI) OR 'HEM -FIR' NO, I (Fb=975 PSI, Fc=1350 PSI), 4, INTERIOR NON -BEARING SAID WALM.'>3GUG FIR^ -LARCH' NO, 2 (Fb=900 PSI. Fc-1350 PSI) OR "HEM -FIR" NO. 1 (Fb=975 PSI, Fc=1350 PSI) 5. UTILITY & STANDARD GRADES NOT PERMITTED. PRESERVATIVE TREATED WOOD REQUIREMEN1 TREATMENTS OTHER THAN THOSE LISTED BELOW ARE NOT PERMITTED. APPLICATION SPECIFIED MATERIAL PRESERVATIVE TREATMENT (1) CONNECTORS & FASTENERS (2)(3) IFOUNDAT10N SILL PLATES, 2x, 4x, 6x (FIR), OR SBX GALV (G60) r TOP PLATES & LEDGERS GLULAM (SP) ACO, CBA, CA GALV (G185) o ON CONCRETE OR (MASONRY WALLS (4) o IFRAMING, DECKING, POSTS 2x, & 4x (FIR) ACO, CBA, CA IGALV (G185) w &LEDGERS 2x, & 4x (CEDAR) NONE IGALV (G90) BEAMS &COLUMNS 16x (FIR), OR GLULAM (SP) ACQ, CBA, CA GALV (G185) Bx OR GLULAM (CEDAR) INONE JIGALV (G90) 1. CCA: CHROMATED COPPER ARSENATE NOT PERMITTED FIR: DOUG-FIR OR HEM-FlR SBX: DOT SODIUM BORATE SP: SOUTHERN PINE ACQ: ALKALINE COPPER QUAT CBA & CA: COPPER AZOLE 2. CONNECTORS: JOIST HANGERS, STRAPS, FRAMING CONNECTORS, COLUMN CAPS AND BASES, ETC. FASTENERS: MACHINE BOLTS, ANCHOR BOLTS AND LAG SCREWS WITH ASSOCIATED PLATE WASHERS AND NUTS. NAILS, SPIKES, WOOD SCREWS, ETC. 3. G60, G90 & G185 PER ASTM A653 FOR COLD -FORMED STEEL CONNECTORS. BATCH/POST HOT -DIP GALVANIZED PER ASTM A123 FOR STRUCTURAL STEEL CONNECTORS. HOT -DIP GALVANIZED PER ASTM A153 FOR FASTENERS OR MECHANICALLY GALVANIZED FASTENERS PER ASTM B695, CLASS 55 OR GREATER. FRAMING CONNECTORS: SHALL CONFORM TO CURRENT EVALUATION REPORT AND BE MANUFACTURED BY SIMPSOH STRONG -TIE COMPANY, SAN LEANDRO. CA., OR PRE -APPROVED EQUAL. PROVIDE MAXIMUM SIZE AND QUANTITY OF NAILS OR BOLTS PER MANUFACTURER, EXCEPT AS NOTED OTHERWISE. PROVIDE LEAD HOLES AS REQUIRED TO PREVENT SPLITTING OF WOOD MEMBERS. REFER TO PRESERVAnVE TREATED M BF4UREMEOMIN THESE GENERAL NOTES FOR GALVANIZING REQUIREMENTS FOR CONNECTORS AND FASTENERS. MISCELLANEOUS: SHOP �[{Awl HGSISD M TTR THE FOLLOWING SHOP DRAWINGS/SUBMITTALS SHALL BE PROVIDED FOR REVIEW AND APPROVAL BY THE STRUCTURAL ENGINEER PRIOR TO FABRICATION OR DELIVERY. STRUCTURAL ENGR. BLDG. DEPT. 1. CONCRETE MIX DESIGNS X X 2. REINFORCING STEEL SHOP DRAWINGS X SPECAL INSPECTION: SPECIAL INSPECTION SHALL BE PROVIDED BY AN INDEPENDENT TESTING LABORATORY PER THE REQUIREMENTS OF IBC CHAPTER 17 AND THE LOCAL BUILDING OFFICIAL OR APPLICABLE JURISDICTION AND THE CONTRACT DOCUMENTS. THE SPECIAL INSPECTOR SHALL SUBMIT NSPECTION REPORTS AND A FINAL SIGNED REPORT TO THE BUILDING OFFICIAL FOR THE ITEMS LISTED N THE QUALITY ASSURANCE/SPECIAL INSPECTION SECTION RESERVED FOR PM STAMP mEPM Structural Solutions Seattle I Tacoma I Pnrtiand www.pcs-struGtural.com STAMP Iff r PROJECT O F CD m LL1J M J Q O U O O Q Z U Y O Q LLI O LL U) REVISION DATE 3/23118 JOB # 17-277 DRAWN 511I5 CHECKED JWB TCTL ■ GENERALNOTES SO.2 nun — um- CDM, STRUCTURAL VERIFICATION AND INSPECTION CONTINUOUS PERIODIC COMMENTS REFERENCES SYSTEM SOILS VERIFY MATERIALS BELOW SHALLOW IBC 1704 7 FOUNDATIONS ARE ADEQUATE TO ACHIEVE X THE DESIGN BEARING CAPACITY VERIFY EXCAVATIONS ARE EXTENDED TO PROPER X DEPTH AND HAVE REACHED PROPER MATERIAL PERFORM CLASSIFICATION AND TESTING OF X COMPACTED FILL MATERIALS VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND X COMPACTION OF COMPACTED FILL PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY THAT SITE HAS X BEEN PREPARED PROPERLY STRUCTURAL MATERIAL VERIFICATION OF HIGH -STRENGTH X AISC 360 CHAPTER N5 STEEL BOLTS, NUTS AND WASHERS MATERIAL VERIFICATION OF STRUCTURAL STEEL MANUFACTURER TO PROVIDE AISC 360 CHAPTER N5 A. FOR STRUCTURAL STEEL, IDENTIFICATION X CERTIFIED MILL TEST REPORTS AISC 341 CHAPTER J6 MARKINGS TO CONFORM TO AISC 360 B. MANUFACTURER'S CERTIFIED MILL TEST X REPORTS MATERIAL VERIFICATION OF WELD FILLER MANUFACTURER TO PROVIDE AISC 360 CHAPTER N5 MATERIALS CERTIFICATE OF COMPLIANCE A. IDENTIFICATION MARKINGS TO CONFORM TO X AWS SPECIFICATIONS LISTED IN GENERAL NOTES B. MANUFACTURER'S CERTIFICATE OF X COMPLIANCE INSPECTION OF WELDING SPECIAL INSPECTIONS IN THIS AISC 360 CHAPTER N5 A. SINGLE -PASS FILLET WELDS S 5/16- X SECTION ARE WAIVED WHERE AISC 341 CHAPTER A B. FIELD -INSTALLED WELDED STUDS X FABRICATION IS PERFORMED ON THE AWS D1.1 PREMISES OF A FABRICATOR REGISTERED AND APPROVED IN ACCORDANCE WITH IBC SECTION 1704.2,5 INSPECTION OF STEEL FRAME JOINT DETAILS FOR COMPLIANCE WITH APPROVED CONSTRUCTION X DOCUMENTS TESTING AND SPECIAL INSPECTION REPORTS SHALL BE PREPARED FOR EACH INSPECTION ITEM ON A DAILY BASIS WHENEVER WORK IS PERFORMED ON THAT ITEM. REPORTS SHALL BE DISTRIBUTED TO OWNER, CONTRACTOR, BUILDING OFFICIAL, ARCHITECT AND STRUCTURAL ENGINEER OF RECORD. STRUCTURAL OBSERVATIONS SHALL BE PERFORMED BY THE STRUCTURAL ENGINEER OF RECORD OR DESIGNATED REPRESENTATIVE IN ACCORDANCE WITH IBC 1704.6. STRUCTURAL OBSERVATION SHALL BE PERFORMED AS FOLLOWS: • PERIODIC VISUAL OBSERVATION OF STRUCTURAL SYSTEMS FOR GENERAL CONFORMANCE TO CONSTRUCTION DOCUMENTS AT SIGNIFICANT CONSTRUCTION STAGES. • REVIEW OF TESTING AND INSPECTION REPORTS. • REPORTS SHALL BE PREPARED FOR EACH SITE VISIT AND SHALL BE DISTRIBUTED TO ARCHITECT. GENERAL CONTRACTOR SHALL SUBMIT A WRITTEN CONTRACTOR'S STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL INCLUDE ACKNOWLEDGMENT OF AWARENESS OF THE SPECIAL INSPECTION REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTION. ABBREVIATION L15T ® AT H6R HANGER A.B. ANGHOR BOLT HORIZ. HORIZONTAL ADD'L ADDITIONAL H55 HOLLOW 5TRUCTURAL 5EGTION A.F.F. ABOVE FIN15H FLOOR HT NE16W ALT. ALTERNATE INT. INTERIOR ARCH. IARGHITECTURAL JET JOINT BLD'6 BUILDING JT JOINT BLK'6 BLOCKING L ANGLE BM BEAM L1. LIVE LOAD B.O.F. BOTTOM OF FOOTING LLH LONG LEG HORIZONTAL BOT. BOTTOM LLV LONG LEG VERTICAL BR6 BEARING LOG. LOCATION BTWN BETWEEN L5L LAMINATED STRAND LUMBER B.U. BUILT UP LVL LAMINATED VENEER LUMBER (G=) CAMBER MAX. MAXIMUM GANT, CANTILEVER M.B. MACHINE BOLT G.F.5. COLD -FORMED STEEL MEGR MECHANICAL G.J. CONTROL/GON5TRUGTION JOINT MEZZ. MEZZANINE GENTERLINE MFR MANUFACTURER GLR. CLEARANCE MIN. MINIMUM GMU CONCRETE MA50NRY UNIT MISC. M15GELLANEOL15 COL. COLUMN MTL METAL GONG. CONCRETE N.F. NEAR FACE CONN. CONNECTION N.5. NEAR SIDE CON5T. CONSTRUCTION NT5 NOT TO SCALE CONT. GONTINUOU5 O.G. ON CENTER CONTR. CONTRACTOR OPN'6 OPENING COORD. COORDINATE OPP. OPPOSITE G.P. COMPLETE PENETRATION P.A.F. PONDER ACTUATED FASTENER CTRV CENTERED PERP. PERPENDICULAR G.Y. CUBIC YARD R PLATE DBL. DOUBLE P.P. PARTIAL PENETRATION D.F. DOU5LA5 FIR P.P.T. PRf82VAnvE Fw65 RE TREATED DIA. OR 0 DIAMETER P `_c. F. POUNDS PER SQUARE FOOT DIAL. I DIA60NAL P5L PARALLAM DIM. DIMENSION P.T. P05T TENSION D.L. DEAD LOAD PK PLYWOOD DWG DRAWING REINF, REINFORGIN6 DWL DOWEL REOV REQUIRED (E) EXISTING 5GHED. SGHB)ULE EA. EACH S.G.L. 5TR I ICTURAL COMPOSITE LUMBER E.F. EACH FACE 5NT'6 SHEATHING EL. ELEVATION SIM. 51MILAR ELEV. ELEVATOR 5.0.6. SLAB ON GRADE ENGR. ENGINEER 5Q, SQUARE EQ. EQUAL 5TD STANDARD E.K I EACH WAY STIFF. STIFFENER EXR EXPAN51ON 5TL STEEL EXT. EXTERIOR 5TRUGT. STRUCTURAL FDN FOUNDATION T413 TOP 4 BOTTOM F.F. FAR FACE T46 TONGUE AND GROOVE FLR FLOOR THRD THREADED F.O.M. FACE OF MA50NRY T.O.F. TOP OF FOOTING F.0.5. FACE OF STUD T.0.5. TOP OF STEEL FRM'6 FRAMING TRTV TREATED F.R.T. FIRE RETARDANT TREATED TYP. TYPIGAL F.5. FAR 51DE U.N.O. UNLE55 NOTED OTHERWISE FTC, FOOTING U.T. ULTRASONIC TESTED 6A. 6AC-E1rAU6E VERM VERTICAL 6ALV. GALVANIZED w WITH &L. GLULAM W.P. WORK POINT GR. GRADE WT WEIGHT GWB 6YP511M WALL BOARD W.WR. NELDED WIRE REINFORC N6 HDR HEADER RE5ERVED FOR DFD STAMP Empm Structural Solutions Seattle I Tacoma I Portland www.pcs-structural.com STAMP A, PROJECT Q' CM CD m W 0) J � Q O U) O .-C D Q Z U J Y Lqs O Q W O ILL U) REVISION DATE 3123/18 JOB # 17-277 DRAWN SMS CHECKED JWB GENERAL NOTES -r S0.3 ■ H552x2x1/4 WELD BASE TO SHIPPING CONTAINER FRAME W/ J" FILLET ALL AROUND, TYP. 2'-OSi2'-0kl2'-0' EDGE OF DECK THICK FTC, W/ (3) PER ARCH, TYP. TYP, tr_T11T #5 EYq. BOT. - TYP I Tv I— SLAT FRAMOE�D L_ J b..GONG. 5TEM , I s9.o INS WALL, TYP. li WALL, TYP. i F"xl2' I J �o (E) FLR DECK 1 A5 p(5 + THICK CONT. FTC. W/ (3) #4 TdB, GONT. TYP.- H% 4x44" GATE POST. LOCATE I p j PER ARCH PROVIDE J'xl' SKIP L — F I FILLET WELD ® 12" O.G. ALONG (2) FAGE5 W/ CONTACT W/ — J CORNER FRAME OF SHIPPING WOOD T i CONTAINER, TYP. SCREEN S GONN. TYP- DEGKIN6 b CONNECTION TO 5TRUGTURAL 41 TO 5TRUCT. PER ARCH. r � PER ARCH. 1 �J v y - TTP �n WINDOW PER ARCTYP. • �y ij ITA2' GONG. PIER A T � O BLOCK - TYP, n � I 2x4 ®24'OL. ® � s L J `S" �n AS �. �• .o 5W s3G RS REOV, • x TYR 2 SiA H55 4 , FLAT A O u PER .i r TYP. Sea �(E) ry I WELD END OF H55 BEAM TO FRAME OF SHIPPING 6 Si4 f FLR DECK A5 OGGUR5 ' GONG. 5 M F CONTAINER W/ #" FILLER HELU GOL, TOP TO 5HIPPIN6 �� CONTAINER FRAME W/ #" FILLET EDGE OF I 12x4 ® 16" O.G. t� . TYP. ALL AROUND, TYP ALL AROUND TYP. ROOF PER FLAT-FGWALL, L — J g ARCH., NI — RJRRIN TYP. r L — _ J J — m 2xIO ® I6' O.G. ' x H5 52x2x1/4 RROOOFLDE VERCOR WELD BASE TO SHIPPING CONTAINER NOTE.ATTACH TO FRAME W/ "FILLET ALL AROUND, TYP. ALL EXTERIOR WOOD FRAMING SHALL 5 T #q 5GREW5. 16T OG. M1 PRESERVATIVE PRESSURE TREATED LUMBER 6 53a sea 2'-O"x2'-0"xl2'-O" �n H55 4xa FLAT THICK FT6 W/ (3) #5 E-N. BOT. - TYP. - - FLOOR PLAN 52 O 1/4'=1'-0' nl� roc ALL EXTERIOR WOOD FRAMING SHALL BE Sao ARCH, TYP' PRE5ERVATIVE PRE55UR.E TREATED LUMBER ROOF PLAN RE5ERVED FOR DPP 5TAMF Eapm Structural Solutions Seattle I Tacoma I Portland www.pc,s-structural.com STA :!P U SAAU�� Lt PROJECT !Y M I— o m LwL l rn J � Q O c boa Lr) CM _Z U � O Q w REVISION DATE 3/23/18 JOB # 17-277 DRAWN SMS CHECKED JWB T" FLOOR & ROOF PLAN -0 S2.0 STUD WALL PER PLAN 8"Xb'XI/2" 13A5EPLATE OVER MAX. I" NON-5HRINK GROUT W/(2) 5/b"(Pxb" WELDED 5TUD5 ® 4' GAGE, CENTERED ON PLATE --- 5HT'6 b NAILING PER PLAN Z SHIPPING CONTAINER FLR STRUCTURE OCCURS MIN. FIN15H GRADE PER ARCH. - FT6 i REINF. PER PLAN - $14"V 6 CONTAINER MTL SIDING - AS OCCURS 2xb LEDGER GONT. 51MP50N TB O.3b6'mx2%' SGREW ® 12" O.G. WOOD DECK PER ARCH. 91,112" LU526 HGR BM PER PLAN JST PER PLAN 594-ION LU54b HGR 14"xl4' GONG. PLINTH #3x © ® 6" O.G. #4x L ® EA. CORNER - (4) TOTAL A 2'-3" MAX. #10 5GREW ® EA. MTL 510ING FLL15H FLUTE - PANEL AS TYP. OCCURS Y L3x3xl/4 - TYP. �F ¢.m W0 A — MTL SIDING A -A PANEL AS OCCURS WINDON 9UPPORT FRAME 4 DETAIL -AT SIM. CONDITION, M AL SIDING PANEL STUD WALL PER PLAN SHIPPING (E) FLR DEGKIN6 CONTAINER AS OCCURS MTL SIDING - AS OCCURS — - (E) SHIPPING r-KNNZE CONTAINER FLR 5TRUCTURE - AS OCCURS l r 5TL R 1/4b"Xb"XI/2' BASEPLATE OVER MAX. I" NON -SHRINK 6ROUT W/(2) 5/5",Pxb" WELDED STUDS ® 4" 6A6E, GONG. STEM WALL I 1 I ` CENTERED ON PLATE. CENTER PLATE PER PLAN I t ! I 4-1 ON WALL INTERSECTION I I ! 1 I ! ! O FIN15H GRADE I I 1 I 1/2",Pxb" WELDED PER ARCH. I 1 I I ! I I 1 51U05 ® 12" O.G. I f ! 2" GLR 1 (2) #4 TOP - GONT. ! 1 I #4 ® Ib" O.G. - HORIZ. I I I I 3" GLR; I #4x L ® Ib" O.G. r}�k 3' GLR---+ ~` PFJZ PLAN FTG PER PLAN EDGE OF FTG PER PLAN - BEYOND TYPICAL CONTAim-TO-FOO71N6 CONNEG7� DETAIL aol/ 1•=1'-O' #q 5GREN5 ® 16' O.G. SLOPE MTL DECK PER PLAN PER ARGfL1--,f- 1l ;,wW;=r1Q L= H2.5A 5TAINLE55 5TL EVERY THIRD _5T— #q 5GREW5 5TL R 1/4"x6"xb" ® 24" O.G. 5HIPPIN6 CONTAINER MTL SIDING - AS OCCURS 2910 BLK'G GONT. (v IOd SHIPPING CONTAINER MTL DECK - AS OCCURS (2) 505 1/4'mx212" 5GRE1,115 5700 WALL PER ALA' N DBL. TOP R J5T PER PLAN - DETAIL 'FENCE MATERIAL PER BM PER PLAN ARCH. -NOT SHOWN FOR SPANS PARALLEL TO CLARITY H55 b ANGLE ASSEMBLY MTL SIDING 114' D4' PANEL AS P05T PER PLAN W16 I"� • I" OCCURS • W4" 6 1�12 ANGLE A COW 316 I ® I 1/2" Ax6" LAC, pgz 5GREW EA. SIDE AAA g OF COL. BM PER PLAN A' DEGKIN6 PER ARCH. OPN'O PER ARCH. AS OGGUR5 NOTE: ROOF PANEL d BM PER PLAN — `-- J5T PER PLAN FRAMING NOT SHOWN FOR CLARITY FET" PRANIE.C42aarTl DETAIL 8 DETAIL 51MP50N GG COL. GAP — 51MP50N 6522 STRAP— -DECK PER ARCH. 51MP50N LU526 HGR - TYP- GONG. DEGK 44 L_$M PER PLAN S PIER PER PLANP N • ono •� 10" DEEP COMPACTED JST PER PLAN GRAVEL PAD - CENTERED ON PIER — �� 14' 7YPlCAL DECK -TO -PIER i,•,Ol-G7fON 3 DETAIL 3 •� san FOR INFORMATION NOT SHOWN i 4x4 P.T. P05T 4.1 `r 1/2'rP THRU-BOLT W/ WASHER EA. 12GONG. PIER FACE BLOCK PV ADJUSTABLE HT j STANCHION of3b 0 pp 0°A9 _A% 0 �LfVATED •h:+51T FC*a"'4 Structural Solutions Seattle I Tacoma I Portland www.pc-s-structural.com STAMP L� rorrr,y � PR03ECT i CM H 0000 to W CA J Q 0 C 0 L i O rn � Z � CD O 0 LLI 0 1.L E) REVISION DATE 3123/18 JOB# 17-277 DRAWN SMS CHECKED JWB TRLE DETAILS FCFT S3.0 I I I I I I I I I 1 I ! I 1 I f I , , , r 10' REAR TT 324.5' 10' SIDE 1 SETBACK �(E) UNPAVED VEHICLE ACCESS NEW SOUTH KING T00f LIBRARY -- - TWO RECLAIMED SHIPPWO 30'-7' - 70--5- La 74'-9' i CONTAINERS 8'>�`40' EACH 1 5'-5' 48'-0PIN _ -- ONIC LODGE S 3401H ST .. I 0 i EOERAL WAY, KIN i V I I n 1 I ) 5�0 PARCEL NUMBER MASONIC LODGE PARK KIN TI1I5 NG �f ! 24 � 7 _ 212104-9024 a� z (E) BARRIER FREE STALLS 4 W N w I9 WORK IN THIS_A_REA (E) TREE I TO REMAIN 1 ) 81 + IN {E) SPAC C LODGE P KINTH _- - f(E) IBLOC y -y f i:TflilIkTUry ll CONSTRUCTION TYPE: 58 NUMBER OF STORIES: 1 OCCUPANCY: U (ACCESSORY USE TO ADJACENT MASONIC LODGE) AREA OF DISTURBANCE: 1608 SF 51 — S 340TH ST - In I — — 16.5' PRIVATE 1 I ROAD EASEMENT x I I In 1 n r 1 J I IjJI a I W SITE PLAN Scdl 1/32" = 1'-0" SOUTH KING TOOL L BRARY PERMIT SET A1.0 SITE PLAN A2.0 FLOOR AND ROOF PLAN A2.1 EXTERIOR ELEVATIONS S0.1 GENERAL NOTES S0.2 GENERAL NOTES S0.3 GENERAL NOTES S2.0 FLOOR AND ROOF PLAN S3.0 DETAILS APPROVED PLANNING City of Federal Way Dept. of Community v me Permit # ` By i Date DECK AREA = 968 SF TOTAL GROSS BUILDING AREA = 640 SF GROSS OFFICE AREA = 87 SF GROSS TOOL STORAGE AREA = 553 SF I I RECEIVE APR 0 5 2018 CITY OF FEDER L W COMMUNI 1 Y DEVELOP! UNDBERG ENNEDY Y-AU YOUNG ARCHITECTS 40 2ND AVE S, SUITE 450 EATTLE WA 98104 06"327.i l3G SOUTH KING TOOL LIBRARY Site Plan ,6y 1.0 j KC�C.4. IPPWG DWOAFAS 2 ROOF PLAN Scale: 1/4" = U UNDBERG ENNEDY Y-AU YOUNG ARCHITECTS 40 2ND AVE S, SUITE450 FATTLEWA 98104 06.322.1 I30 SOUTH KING TOOL LIBRARY .�asw Floor and Roof Plan A2. 0 (E) MASONIC LODGE CORRUGATED GALVANIZED CONNNUOUS GALVANIZED METAL ROOFING PETAL CURER 2 PAINTED RECLAIMED 640' SHIPPING CONTAINERS WOOD SLAT GATE SHOWN IN CLOSED. LOp[ D POSMON Eost Elevation I/ Scale: 1/4" = 1'-0- (E) SHED BEYOND XT A z ` — DOWNSPOUT 1 — ` RAW GARDEN BEYOND North Elevation 3 C.17 1/4 2'.2' AWNING WINDOWS, TYP CORRUGATED GALVANIZED METAL ROOFING i WOOD SLAT CRAWLSPACE SCREENING South Elevation (through Deck) V Scale: 1/4- = 1'-0" PAINTED RECLAIMED B' . 40' SHIPPING CONTAINER q l� A 0 West Elevation Scale: 17 = 1'-0" 2'.2' AWNING CORRUGATED GALVANIZED WINDOWS, TYP METAL ROOFING PAINTED RECLAIMED B' . 40, SHIPPING CONTAINER AY - I t IS'-5 WOOD SLAT DECK WOOD SLAT CRAWLSPACE SCREENING of CORRUGATED GALVANIZED 2'e2' AWNING WINDOW A PAINTED RECWHED METAL ROOFING SHIPPING CONTAINER ALIGN r WOOD SLAT SCREENING Z.^,.Y .. �✓�rMl WOOD SLAT GATE SHOWN IN OPENED POSITION WELDED STEEL TUBE AT CONTAINER OPENINGS, IYP North Elevation (through Covered Deck) ., Scale: 1/4" = 1'-0- UNDBERG ENNEDY Y--AU YOUNG RCHITECTS 40 2ND AVE S, SUITE 450 FTLE WA 98104 2k T 130 SOUTH KING TOOL LIBRARY goo s Swu s� rme .or... seoa. o�� b ua c mie Exterior Elevations A2.1