23-102126CityFederal way
FILF
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 635-2607 Fax: (253) 835-2609
Project Name: LEWIS
Project Address: 30019 4TH AVE SW
Electrical
Permit #:23-102126-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 720500 0030
Project Description: ADD/ALTER (2) CIRCUITS - NEW DISCONNECT FOR ODU, FURNACE DISCO/RECO
Owner
Applicant
Contractor
ENOCH LEWIS
MERIDIAN CENTER ELECTRIC
MERIDIAN CENTER ELECTRIC INC (01)
30019 4TH AVE S
11109 66TH AVE E
MERIDCE318SG (2/28/25)
FEDERAL WAY WA 98023-3515
PUYALLUP WA 98373
11109 66TH AVE E
PUYALLUP WA 98373
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential 2 Thermostat 1
PERMIT EXPIRES Tuesday, 17 October, 2023
Permit Issued on Thursday, April 20, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and the City of Federal Way.
nN11 INIF;
Owner or agent: Date:
�yv
cllY of 1111&
Federal Way
THIS C'ALRD IS TO RE]La1\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS* (253) 83-5-3050
Scheduled inspections rva-; be'tiled if this card is not on -site. DO NOT LOSE THIS C'_LRD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate work niust not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. Chi -going inspections are logged on the back of this card.
ELECTRICAL
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch corer (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary- Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
B}
Date
Br
Date
❑
Final - Electrical (4055)
Approved
B�
Date gyp{
MECHANICAL
❑ Mechanical Rough -in (4165) ❑7 Gas Piping (4125) ❑ Final -Mechanical (4065)
Approved Approved to release test Approved
By Date By Date Br Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) Q Final - Plumbing (4075)
Approved to corer Approved Approved
By Date By Date By Date