Loading...
23-102126CityFederal way FILF Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 635-2607 Fax: (253) 835-2609 Project Name: LEWIS Project Address: 30019 4TH AVE SW Electrical Permit #:23-102126-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 720500 0030 Project Description: ADD/ALTER (2) CIRCUITS - NEW DISCONNECT FOR ODU, FURNACE DISCO/RECO Owner Applicant Contractor ENOCH LEWIS MERIDIAN CENTER ELECTRIC MERIDIAN CENTER ELECTRIC INC (01) 30019 4TH AVE S 11109 66TH AVE E MERIDCE318SG (2/28/25) FEDERAL WAY WA 98023-3515 PUYALLUP WA 98373 11109 66TH AVE E PUYALLUP WA 98373 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 2 Thermostat 1 PERMIT EXPIRES Tuesday, 17 October, 2023 Permit Issued on Thursday, April 20, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton and the City of Federal Way. nN11 INIF; Owner or agent: Date: �yv cllY of 1111& Federal Way THIS C'ALRD IS TO RE]La1\ ON -SITE Construction Inspection Record INSPECTION REQUESTS* (253) 83-5-3050 Scheduled inspections rva-; be'tiled if this card is not on -site. DO NOT LOSE THIS C'_LRD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate work niust not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. Chi -going inspections are logged on the back of this card. ELECTRICAL By UFER Ground (4295) Approved Date ❑ By Ditch corer (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary- Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date B} Date Br Date ❑ Final - Electrical (4055) Approved B� Date gyp{ MECHANICAL ❑ Mechanical Rough -in (4165) ❑7 Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date Br Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to corer Approved Approved By Date By Date By Date