Loading...
23-101908Electrical City of Federal Way Community Development Dep433325 i 8th Ave S �llLLL"' Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: RHODES PLAZA Unit E Project Address: 29500 PACIFIC HWY S Project Description: Retrofit LEDs in main area Permit #:23-101908-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 304020 0093 Owner Applicant Contractor VALERIE RHODES JAN ROSANDERCUSTOM ELECTRICAL CUSTOM ELECTRICAL SERVICES LLC 850 S MARINE HILLS WAY SERVICES LLC (01) FEDERAL WAY WA 98003 3716 AUBURN WAY N CUSTOES893J2 (4/22/25) AUBURN WA 98002 3802 AUBURN WAY N SUITE 307 AUBURN WA 98002 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Commercial 2 PERMIT EXPIRES Monday, 9 October, 2023 Permit Issued on Wednesday, April 12, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of CNI in tan and the City of Federal Way Owner or agent: Date: 'A-, CITY of Federal Way THIS CARD IS TO RENLUN O\-SITE Construction Inspection Record L\SPECTION REQUESTS: (253) 835-3050 Scheduled inspections may be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are tonsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LTFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date MECHANICAL Mechanical Rough -in (4165)❑ Gas Piping (4125) 3❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date