23-102060City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: UNG
Project Address: 1009 SW 360TH ST
Project Description: Install vehicle charger
FILE
Electrical
Permit #:23-102060-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 202100 0110
Owner
Applicant
Contractor
FREDERICK UNG
JAN ROSANDERCUSTOM ELECTRICAL
CUSTOM ELECTRICAL SERVICES LLC
1009 SW 360TH ST
SERVICES LLC
(01)
FEDERAL WAY WA
3716 AUBURN WAY N
CUSTOES893J2 (4/22/25)
98023
AUBURN WA 98002
3802 AUBURN WAY N SUITE 307
AUBURN WA 98002
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential I
PERMIT EXPIRES Sunday, 15 October, 2023
Permit Issued on Tuesday, April 18, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
in t�� e - i -Federal Way.
Owner or agent: Date:
CFTY or
Federal Way
THIS CARD IS TO REALkn O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections mad- be failed if this cud is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. 'Pork must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
El
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
�%
Date 4e—
MECHANICAL
❑
Mechanical Rough -in (4165)
Q
Gas Piping (4125)
Q
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date