23-102123of Federal Way Community Development Dept
FILFCity
33325 8th AveS
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CAMPUS GREEN II CONDO Unit G-16
Project Address: 515 S 323RD ST
Project Description: Panel Change
Owner
GENNADIY & ELENA OGAY
515 S 323RD ST UNIT G-16
FEDERAL WAY WA 98003
Applicant
SERGIY MNUSHKOLAKELAND
ELECTRIC LLC
28404 46TH AVE S
AUBURN WA 98001
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Circuits - Residential
Electrical Fixtures
Electrical
Permit #:23-102123-00-EL
Inspection Request Line: (253) 835-3050
PERMIT EXPIRES Tuesday, 17 October, 2023
Permit Issued on Thursday, April 20, 2023
Parcel Number: 132151 0470
Contractor
LAKELAND ELECTRIC LLC
(ELECTRICAL)
LAKELEL783BU(1/31/24)
28404 46TH AVE S
AUBURN WA 98001
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
i n a d a of Federal Way.
=�
Owner or agent: Date:
-4k
are Of
Federal Way
THIS C' ARD IS TO RE-\I_JIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-3050
Scheduled inspections ma-: be failed if dus card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are tttLure about any of the inspections or the inspection sequence. On-aouia inspections are logged on the back of this card.
ELECTRICAL
❑
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Sen-ice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
By
Approved
/ Date 16 �x �J
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
B`
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date