Loading...
23-101901City of Federal Way I L Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: KIM Project Address: 626 SW 331ST ST Project Description: Replace gas furnace like in kind Mechanical Permit #:23-101901-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 729803 0060 Owner Applicant Contractor SOON KIM SARAH TURNERGLENDALE HEATING & GLENDALE HEATING & A/C (GENERAL 626 SW 331 ST ST A/C 01) FEDERAL WAY WA 98023-6173 12462 DES MOINES WAY S GLENDHA053Q2 (11/2/23) SEATTLE WA 98168-2266 12462 DES MOINES MEMORIAL DR SEATTLE WA 98168-2266 Additional Permit Information Mechanical Work Valuation? .................................. 5000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces I PERMIT EXPIRES Monday, 9 October, 2023 Permit Issued on Wednesday, April 12, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W g on he C" F o hi ff Federal Way. 0� Owner or agent: Date. t: r�h�l 4& qP crrr or Federal Way THIS C M IS TO REALM\ O\-SITE Construction Inspection Record INSPECTION REQL•ESTS: (253) 835-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LIFER Ground (4295) ❑ Ditch corer (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date i B`• Date By Date ❑ Pool Bonding (4195) ❑ Temporary Poorer (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date Bv Date By Date El Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - -Mechanical (4065) Approved Approved to release test Approved� By Date By Date B� G Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑3 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date