Loading...
14-103136CITY OF CITY HALL 33325 8th Avenue South Federal 1Nay Federal Way, WA 98003-6325 r� (253) 835-7000 www.cityoffederalway.com September 4, 2014 Mr. Steven J. Quaterman, Associate Scientist FILE Landau Associates 130 2"d Avenue South Edmonds, WA 98020 Re: File #14-103136-00-AD; AUTHORIZATION TO PROCEED Palisades Retreat Bulkhead and Stair Replacement — Inspection and Monitoring of Shoreline Restoration and Mitigation Plan, 4700 SW Dash Point Road, Federal Way Dear Mr. Quaterman: Please find the signed task authorization for the Palisades Retreat Bulkhead Shoreline Inspection and monitoring project. Tasks include the review of the shoreline restoration and mitigation installation and three-year monitoring plan. The applicant has funded the environmental pass -through account for each task totaling $10,825.00. Construction on the site has begun, so we will let you know when the work is nearing completion and the time when the first site inspection and summary report will be due. Please contact me at 253-835-2644, or jaiiet.shL[11@—ciiyoffederglway.com, if you have any questions regarding this project. Sincerely, J, et Shull, AICP CUD nior Planner enc: Landau Task Authorization and Scope of Services Doe I D 66657 44k CITY OF Federal Way ENVIRONMENTAL CONSULTANT AUTHORIZATION FORM Today's Date: July 3, 2014 City: City of Federal Way Community Development Department 33325 8d' Avenue South Federal Way, WA 98003 Consultant: Landau Associates Attn: Steve Quarterman 130 2nd Avenue South Edmonds, WA 98020 Project: Palisades Retreat Bulkhead and Stair Replacement Inspection and Monitoring of Shoreline Restoration and Mitigation Plan File No: 14-103136-00-AD Project Proponent: Gus Ripple Corporation of the Catholic Archbishop of Seattle 710 9`h Avenue Seattle, Washington, 98104 Project Planner: Senior Planner Janet Shull, AICP, 253-835-2644 Documents Provided: ■ Report titled "Habitat Mitigation and Protection Plan — Archbishop Brunett Retreat Center (ABRC) Shoreline Protection and Access Repairs" prepared by Soundview Consultants, May 14, 2014 • Beach Access Stairs Repairs plan sheets Al, ALL, A1.2, A1.3, and AI A prepared by Broderick Architects, May 14, 2014 • Hearing Examiner Shoreline Substantial Development Permit, Shoreline Conditional Use Permit and Variance Permit decision. March 28, 2014 • Hydraulic Project Approval (Control Number 128494-1), April 17, 2014 • Department of Ecology Shoreline Substantial Development Permit, Shoreline Conditional Use Permit and Variance Permit Approval, April 28, 2014 Task Scope: The Federal Way Hearing Examiner granted conditional approval to the proposed beach nourishment and shoreline buffer restoration associated with construction of a 45-foot bulkhead, soft shore armoring, and replacement beach access stair along with removal of the damaged portion of the existing beach access stair, and shoreline restoration in the form of removal of a dilapidated barge, bulkhead, and Environmental Consultant Authorization Form Palisades Retreat/14-103136-00-AD Page 1 of 2 additional debris. The approved mitigation plan provides for two years of monitoring of the beach nourishment measures, and three years of the shoreline buffer restoration. Please provide the following: 1) The cost to inspect those areas of shoreline restoration and shoreline buffer restoration following removal of dilapidated barge, bulkhead, and other debris, and restoration to ensure that these improvements comply with approved plans as well as the requirements of the FWRC, the Process IV Hearing Examiner approval and the conditions of the HPA in association with Chapter 7 of the Habitat Mitigation and Protection Plan and construction plan sheets Al and Al.1. 2) The cost to conduct two (2) years of peer review monitoring for the beach nourishment and three (3) years of peer review monitoring for the vegetation restoration work. Tasks include: (a) review required reports prepared by the applicant's environmental consultant; (b) conduct site inspections as necessary to review the site conditions relative to the monitoring reports prepared by the applicant's environmental consultant; (c) prepare correspondence to the city regarding review of the monitoring reports prepared by the applicant's environmental consultant, including findings of your inspections and the status of the beach nourishment and restoration; and (d) provide additional written correspondence to the city as necessary depending on observed conditions. Task Schedule: Provide task cost estimate by July 14, 2014. Task Cost: Not to exceed $10,825.00 without a prior written amendment to this Task Authorization. (The total task amount to be filled in by planner after the consultant returns this form with the total work estimate and said estimate has been approved by the Project Planner.) Acceptance: ederal Way (Planner) 011611 Date 13 Environmental Consultant Authorization Form Palisades Retreat/14-103136-00-AD Page 2 of 2 CITY OF L. Federal Way July 24, 2014 Mr. Gus Ripple CCAS Property & Const 710 9«' Avenue Seattle, WA 98104 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway. com FILE Re: File #14-103123-00-OP; Palisades Retreat Cost Estimate for Shoreline Mitigation and Monitoring Peer Review; 4700 SW Dash Point Road, Federal Way Dear Mr. Ripple: The city's environmental consultant, Landau Associates, has provided the -enclosed cost estimate for three (3) years of peer monitoring of the work within the shoreline buffer area as required by the Federal Way Hearing Examiner. The normal course of action is for the city to set up an account to be funded by the applicant and drawn down by the work performed by Landau Associates. If the money is not used, it will be returned to the applicant. At this point, please review the proposed July 18, 2014, Landau Associates cost estimate. If you agree with the cost estimate, a check in the amount of $10,825.00, payable to the City of Federal Way, must be submitted before the construction permit can be issued. I can be reached at (253) 835-2644, or Janet.shull@cityoffederalway.com, should you have any questions about this process. Sincerely, J net Shull, AICP, CSBA, LEED Green Associate en for Planner Enc: Cost Estimate Invoice File Doe I D 66245 z am LANDAU ASSOCIATES July 18, 2014 City of Federal Way Community and Economic Development 33325 8 h Avenue South Federal Way, Washington 98003 Attn: Janet Shull, Senior Planner RE: INSPECTION AND MONITORING OF SHORELINE RESTORATION AND STAIR REPLACEMENT PALISADES (ARCHBISHOP BRUNETT) RETREAT CENTER FEDERAL WAY, WASHINGTON Dear Ms. Shull: This proposal provides a suggested scope and budget to provide third party review services to the City of Federal Way (City) for the above -referenced project. This proposal is in response to your request dated July 3, 2014 and is based on a brief review of the information provided with your request and our experience on similar projects. BACKGROUND The Federal Way Hearing Examiner granted conditional approval to proposed beach nourishment and shoreline buffer restoration associated with construction of a 45-foot bulkhead, soft shore armoring, and replacement beach access stair, along with removal of the damaged portion of the existing beach access stair and shoreline restoration in the form of removal of a dilapidated barge, bulkhead, and additional debris for the above -referenced project. The approved mitigation plan provides for two years of monitoring of the beach nourishment measures and three years of monitoring of the shoreline buffer restoration. The City is requesting support for peer review of site conditions following project construction and of monitoring reports associated with beach nourishment and vegetation restoration work. SCOPE OF SERVICES Landau Associates will provide the following specific services: • Inspect those areas of shoreline restoration and shoreline buffer restoration following removal of dilapidated barge, bulkhead and other debris, and restoration to ensure that these improvements comply with approved plans as well as the requirements of the Federal Way ENVIRONMENTAL I GEOTECHNICAL I NATURAL RESOURCES 950 Pacific Avenue, Suite 515 - Tacoma, WA 98402 • (253) 926-2493 - fax (253) 926-2531 - v^,vw1andouinc.com EDMONDS (CORPORATE) - SEATTLE - TACOMA - TRVCITIES - SPOKANE - PORTLAND Revised Code (FWRC), the Process IV Hearing Examiner approval and the conditions of the Hydraulic Project Approval in association with Chapter 7 of the Habitat Mitigation and Protection Plan and construction plan sheets Al and A1.1. Conduct two (2) years of peer review monitoring for the beach nourishment and three (3) years of peer review monitoring for the vegetation restoration work. Efforts will include: (a) review required reports prepared by the applicant's environmental consultant; (b) conduct site inspections as necessary to review the site conditions relative to the monitoring reports prepared by the applicant's environmental consultant; (c) prepare correspondence to the city regarding review of the monitoring reports prepared by the applicant's environmental consultant, including findings of our inspections and the status of the beach nourishment and restoration; and (d) provide additional written correspondence to the city as necessary depending on observed conditions. Our budget includes time for preparation of peer review summary/comments in memorandum format. If there are deficiencies in the applicant's submittal and the applicant needs to respond to the identified issues, additional budget will be required to review the applicant's response. If there are no deficiencies identified in the original submittal, then the supplemental review will be unnecessary. ASSUMPTIONS ■ Site inspections will be completed in each year of peer review. Photographs of existing conditions (prior to project improvements) will be provided to Landau Associates. • As -built plans will be provided to Landau Associates that identify areas of planting and schedule of species and quantities of plants installed. • Monitoring reports will include summary of methods used to evaluate vegetation survival and beach nourishment. ESTIMATED FEE We provide our services on a time -and -expenses basis in accordance with our existing professional services agreement with the City for Third Parry Wetland/Stream Review and Evaluation (signed August 1, 2013). The estimated fee for the scope of services is $10,825, and summary per year of monitoring is provided below. MONITORING YEAR/TASK TASK ESTIMATE Year 0. Post Construction Site Inspection and Summary $3,010 Year 1. Beach Nourishment/Vegetation Peer Review and Summary $2,675 Year 2. Beach Nourishment/Vegetation Peer Review and Summary $2,675 Year 3. Vegetation Peer Review and Summary $2,465 PROJECT TOTAL $10,825 7/18/14 \\edmdata0l\Data\Sharedoc\000prop3sal\C_Federal Way\Palisides Bulkhead\ AI pro\LAI_PalisadesPro.docx LANDAU ASSOCIATES 2 It is possible that the level of effort actually required to complete a specific scope item will differ from that currently being assumed in each year of peer review, and we may need to reallocate authorized budget amounts between the various years or request additional budget as required to meet the needs of the project. If project requirements change or unforeseen conditions are encountered that require services beyond the scope outlined above, we will bring these to your attention and seek approval for modification to the scope of services and budget, as appropriate. We will not exceed the total estimated fee for our services without prior authorization from the City. If the above scope, schedule, and budget are acceptable, please provide us with written authorization. Landau Associates appreciates the opportunity to continue supporting the City of Federal Way on this project. If any questions arise regarding this proposal, please call. LANDAU ASSOCIATES, INC. Steven J. Quarterman Associate Ecologist SJQ/EJH/rgm 2015-1290 7/18l14 \\edmdata0l\Data\Sharedx\000proposal\C_Federal Way\Palisides Bulkhead\LAI prO Al_PalisadesPro.dou tANDAu ASSOCIATES 3