Loading...
23-101715City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name Project Address Project Description FILE TERRIYAKI HOUSE 1608 SW DASH POINT RD Retrofit LEDs in retail area and kitchen Electrical Permit #:23-101715-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 189880 0010 Owner Applicant Contractor DASH POINT VILLAGE SHOPPING CENTER JAN ROSANDERCUSTOM ELECTRICAL CUSTOM ELECTRICAL SERVICES LLC C/O: ROBERT IRMAS' SERVICES LLC (01) 16830 VENTURA BLVD 3716 AUBURN WAY N CUSTOES893J2 (4/22/25) ENCINO CA 91436 AUBURN WA 98002 3802 AUBURN WAY N SUITE 307 AUBURN WA 98002 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Circuits - Commercial Electrical Fixtures 2 PERMIT EXPIRES Sunday, 1 October, 2023 Permit Issued on Tuesday, April 4, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: a V P Date: l�� _�k CITY or Federal Way THIS CXRD IS TO REAL -UN O\-SITE Construction Inspection Record INSPECTION REQ17ESTS: (253) S3S-30: 0 Scheduled inspections miv be failed if this card is not on -site. DO NOT LO$E THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate- Work must not be covered until it is approved. Cbeck with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL El LIFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date B`• Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Appwwd Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved BVex Date MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -'Mechanical (4065) Approved Approved to release test Approved By Date By Date Bp Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date