Loading...
23-101542Electrical Cityof Federal Way Community Development Dept. Permit #.23-101542-00-EL 33325 8th Ave S Federal way, WA a8003 �« ' Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax; (253) 835-2WS Project Name: SILVER LAKE ELEMENTARY SCHOOL Project Address: 1310 SW 325TH PL Parcel Number: 182104 9033 Project Description: 624800 - SECURITY SYSTEM INSTALL Owner Applicant Contractor FEDERAL WAY PUBLIC SCHOOLS ANGELA PLOYERVECA ELECTRIC & VECA ELECTRIC & TECH LLC 33330 8TH AVE S TECH LLC VECAEET8210Q (2/21/25) FEDERAL WAY WA 98003-5433 5614 7TH AVE S PO BOX 80467 SEATTLE WA,98108 r SEATTLE WA 98108 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Commercial 2 Low Voltage - Other (Commez I PERMIT EXPIRES Saturday, 23 September, 2023 Permit Issued on Monday, March 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of OIN E Cit of Federal Way. Owner or agent: Date: D t" Ki}Y o} � k Federal Way THIS CkRD IS TO RENJAJ O\-SITE . Construction Inspection Record INSPECTION REQUESTS: (253) 835-30,50 Scbeduied inspection ntav be failed if this card is not on -sue. DO NOT LOSE THIS CARD. Impecutas ire listed as close to sequential order as possible tread left ro riglit. top to bortosri). Work nntst not be covered tmtil it is approved. Check -,vidt your inspector if you are unsure about any, of the inspections or the isupettion sequence. Du -going inspections are lagged on the back of this card. ELECTRICAL 0 UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date t D Final - Electrical (4055) Approved By pf` Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date